2021/12/13 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Dec 13th - 19th Closure Start Street/Intersection From To Date I Description Department Contact Bell Ave Texas St Withers St 01/07/22 02/11/22 Water Distribution will be Water Tiffany Sherrane 1 installing a new water main line and services. Bell Ave Withers St Mingo Rd 02/12/22 03/25/22 Water Distribution will be Water Tiffany Sherrane 2 installing a new water main line and services. Bernard St Hickory St Chestnut St 06/23/22 08/04/22 Water Distribution will be Water Tiffany Sherrane 3 replacing the water main line and services. Davis St Jannie St Hettie St 01/26/22 03/01/22 Wastewater Collections will be Wastewater Tiffany Sherrane 4 installing a new wastewater main line and services. Hopkins Dr Travis St Hopkins Dr 01/10/22 01/24/22 Wastewater Collections will be Wastewater Tiffany.sherrane c@cityofdenton. 5 installing a new wastewater com main line and services. 6 Long Road W of LaGrone Academy School E of LaGrone Academy School 12/20/21 12/23/21 Replacing concrete road panels Private Development Tucker Eller Exported on December 10,2021 11:34:08 AM CST Page 1 of 1 2 Street Closure Report: Current Closures smartsheet I Closure Start Closure End Department I Street/Intersection From To Date Date Description Department Contact 1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David Venue Grade on Allred Works Inspections 2 Amherst Georgetown Malone 10/18/21 01/21/22 Street Reconstruction Streets Robbin Webber Archer Trail Foxcroft Circle Emerson 11/08/21 12/23/21 Residential roadway Engineering Dustin Draper 3 reconstruction and during the construction only resident traffic will be allowed. Bell Ave at Mingo Rd 11/22/21 01/06/22 Water Distribution will be Water Tiffany Sherrane 4 installing a new water main line and services. 5 Chestnut Street South Welch Street Bernard Street 10/18/21 01/03/22 Utility installations and Engineering Scott Fettig pavement replacement. 6 Elm Hickory Eagle 05/11/20 12/17/21 PEC 4 Utility Project Engineering Seth Garcia Hickory Street Welch Carroll 08/31/20 12/31/21 Construction is set to begin on Engineering Kyle Pedigo West Hickory Street between N. Welch Street and Carroll Blvd in October of 2020 and continue 7 through September of 2021. Detailed lane closure information is forthcoming pending approval of the contractor's phasing and traffic control plans. 8 Keystone Ct East of 1109 Keystone Court Stuart Road 12/13/21 12/17/21 Replacing concrete road panels Private Development Tucker Eller Locksley Lane Emerson Maid Marion 11/08/21 12/31/21 Residential Roadway Engineering Dustin Draper 9 reconstruction,and during the construction resident traffic only will be allowed. Mckinney duchess Glengarry 02/01/21 12/24/21 McKinney-Mayhill Intersection Engineering Trevor Crain This project is widening the intersection and 600'each way 10 to match existing conditions along McKinney.Also includes water,wastewater,and drainage improvements. Mingo Rd Shawnee St Nottingham Dr 12/13/21 12/17/21 Wastewater Collections will be Wastewater Jake George 11 installing a new sanitary sewer manhole. Montecito Buena Vista Palo Verde 11/29/21 12/17/21 Concrete Sidewalk Repair. Streets Robbin Webber 12 Remove failed sections and install new concrete 13 North Texas Blvd. Eagle Dr to Oak There will be multiple phases of 12/13/21 08/01/22 Utility installations and Scott Fettig closures.Will not be all at one pavement replacement. Orr Street Elm Street Locust Street 10/25/21 12/30/21 Roadway Reconstruction this Engineering Dustin Draper 14 project only affects one business and notification was direct with the business owner. 15 Stella St. North Texas Blvd Bonnie Brae 10/29/21 03/15/22 Utility installations and Engineering Scott Fettig pavement replacement. 16 Warschun RD E Sherman Dr(FM 428) Sauls Rd 12/08/21 01/03/22 Drainage pipe extension and Engineering Dustin Draper Turn lane addition 17 We Street Fannin Street West Collins St. 11/29/21 12/17/21 Utility installations and Engineering Scott Fettig pavement replacement. Williamsburg Row Jamestown Ln Nottingham Dr 10/26/21 01/07/22 Wastewater Collection will be Wastewater Tiffany Sherrane 18 installing a new wastewater main line and services 1, Windsor Bonnie Brae Parkside 08/09/21 12/31/21 Pavement Restoration Private Development Public Jeremiah Tillman-David Works Inspections Exported on December 10,2021 11:35:31 AM CST Page 1 of 1 3 Street Closure Report: Completed Closures smartsheet Intersection • • •- •_ • Description Depa - Department Contact Start sure Dat I __1 M Country Club Rd Davis Fort Rd FM 1830 12/04/21 12/04/21 Oncor will be installing Other 1 equipment from 8am-11am on Saturday,December 4th 2 Quail Ridge Cooper Branch E La Paloma Dr 09/07/21 12/10/21 Street Reconstruction Engineering Dustin Draper Welch Street Chestnut Street Mulberry Street 09/27/21 11/14/21 University of North Texas Private Development Public Alice Province 3 excavating street to connect Works Inspections services to Art Studio Building 4 Western Blvd Jim Chrystal Airport Rd 08/16/21 12/31/21 Paving:Decal Lanes Private Development Public Jeremiah Tillman-David Works Inspections Exported on December 10,2021 11:36:00 AM CST Page 1 of 1