2021/12/20 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Dec 20th - 26th
Closure Start
Street/Intersection From To Date I Description Department Contact
Bell Ave Texas St Withers St 01/07/22 02/11/22 Water Distribution will be Water Tiffany Sherrane
1 installing a new water main line
and services.
Bell Ave Withers St Mingo Rd 02/12/22 03/25/22 Water Distribution will be Water Tiffany Sherrane
2 installing a new water main line
and services.
Bernard St Hickory St Chestnut St 06/23/22 08/04/22 Water Distribution will be Water Tiffany Sherrane
3 replacing the water main line
and services.
Davis St Jannie St Hettie St 01/24/22 02/26/22 Wastewater Collections will be Wastewater Tiffany Sherrane
4 installing a new wastewater
main line and services.
Hopkins Dr Travis St Hopkins Dr Wastewater Collections will be Wastewater Tiffany.sherrane c@cityofdenton.
5 installing a new wastewater com
main line and services.
6 Sweet Gate Lake View Autumn Path 01/03/22 02/11/22 Concrete Street Panel Repair Streets Robbin Webber
Exported on December 17,2021 11:21:38 AM CST Page 1 of 1
2 Street Closure Report: Current Closures smartsheet
I Closure Start Closure End Department I
Street/Intersection From To Date Date Description Department Contact
1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David
Venue Grade on Allred Works Inspections
2 Amherst Georgetown Malone 10/18/21 01/21/22 Street Reconstruction Streets Robbin Webber
Archer Trail Foxcroft Circle Emerson 11/08/21 01/14/22 Residential roadway Engineering Dustin Draper
3 reconstruction and during the
construction only resident traffic
will be allowed.
Bell Ave at __TMingo Rd 11/22/21 01/06/22 Water Distribution will be Water Tiffany Sherrane
installing a new water main line
and services.
Bonnie Brae Street Scripture Oak 12/20/21 12/22/21 The contractor will begin Engineering Robin Davis
making the crossing of the 42-
inch Transmission Main from
the west side of Bonnie Brae
Street to the east side,requiring
a full closure at the crossing
location. The full width open cut
will take place near 316 N.
Bonnie Brae.This work is
anticipated to be complete by
close of business on
Wednesday December 22nd.
Therefore,Bonnie Brae Street
will be closed from the Scripture
Roundabout to Oak Street to
THRU Traffic. Local traffic
access to medical facilities,
businesses and residences will
be allowed. Detour signs will be
posted accordingly.
6 Chestnut Street South Welch Street Bernard Street 10/18/21 012/28/22 Utility installations and Engineering Scott Fettig
pavement replacement.
7 Elm Hickory Eagle 05/11/20 12/31/21 PEC 4 Utility Project Engineering Seth Garcia
Hickory Street Welch Carroll 08/31/20 12/31/21 Construction is set to begin on Engineering Kyle Pedigo
West Hickory Street between N.
Welch Street and Carroll Blvd in
October of 2020 and continue
8 through September of 2021.
Detailed lane closure
information is forthcoming
pending approval of the
contractor's phasing and traffic
control plans.
Locksley Lane Emerson Maid Marion 11/08/21 12/31/21 Residential Roadway Engineering Dustin Draper
9 reconstruction,and during the
construction resident traffic only
will be allowed.
10 Long Road W of LaGrone Academy School E of LaGrone Academy School 12/20/21 12/23/21 Replacing concrete road panels Private Development Tucker Eller
Mckinney duchess Glengarry 02/01/21 12/24/21 McKinney-Mayhill Intersection Engineering Trevor Crain
This project is widening the
intersection and 600'each way
11 to match existing conditions
along McKinney.Also includes
water,wastewater,and
drainage improvements.
Montecito Buena Vista Palo Verde 11/29/21 12/30/21 Concrete Sidewalk Repair. Streets Robbin Webber
12 Remove failed sections and
install new concrete
13 North Texas Blvd. Eagle Dr to Oak There will be multiple phases of 12/13/21 08/01/22 Utility installations and Scott Fettig
closures.Will not be all at one pavement replacement.
Exported on December 17,2021 11:21:51 AM CST Page 1 of 2
Intersection
• To ,ate Closure • • Description Department Department
Orr Street Elm Street Locust Street 10/25/21 12/30/21 Roadway Reconstruction this Engineering Dustin Draper
14 project only affects one
business and notification was
direct with the business owner.
15 Stella St. North Texas Blvd Bonnie Brae 10/29/21 03/15/22 Utility installations and Engineering Scott Fettig
pavement replacement.
16 Warschun Rd E Sherman Dr(FM 428) Sauls Rd 12/08/21 01/03/22 Drainage pipe extension and Engineering Dustin Draper
Turn lane addition
17 Welch Street Fannin Street West Collins St. 11/29/21 01/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Williamsburg Row Jamestown Ln Nottingham Dr 10/26/21 01/21/22 Wastewater Collection will be Wastewater Tiffany Sherrane
18 installing a new wastewater
main line and services
19 Windsor Bonnie Brae Parkside 08/09/21 12/31/21 Pavement Restoration Private Development Public Jeremiah Tillman-David
Works Inspections
Exported on December 17,2021 11:21:51 AM CST Page 2 of 2
3 Street Closure Report: Completed Closures smartsheet
Intersection • • •- •_ • D- • Department Department
Start
sure
DatCountry Club Rd Davis Fort Rd FM 1830 12/04/21 12/04/21 Oncor will be installing Other
1 equipment from 8am-11am on
Saturday,December 4th
2 Keystone Ct East of 1109 Keystone Court Stuart Road 12/13/21 12/19/21 Replacing concrete road panels Private Development Tucker Eller
Mingo Rd Shawnee St Nottingham Dr 12/13/21 12/17/21 Wastewater Collections will be Wastewater Jake George
3 installing a new sanitary sewer
manhole.
4 Quail Ridge Cooper Branch E La Paloma Dr 09/07/21 12/10/21 Street Reconstruction Engineering Dustin Draper
5 Western Blvd Jim Chrystal Airport Rd 08/16/21 12/31/21 Paving:Decal Lanes Private Development Public Jeremiah Tillman-David
Works Inspections
Exported on December 17,2021 11:22:02 AM CST Page 1 of 1