2022/01/14 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Jan 17th - 23rd
Street/Intersection Department Contact
1 Athens Tawakoni Dr. New Ballinger Dr 01/24/22 02/11/22 Street Concrete Panel Repair Streets Roy San Miguel
Bell Ave Texas St Withers St 02/19/22 03/25/22 Water Distribution will be Water Tiffany Sherrane
2 installing a new water main line
and services.
Bernard St Hickory St Chestnut St 06/23/22 08/04/22 Water Distribution will be Water Tiffany Sherrane
3 replacing the water main line
and services.
4 Brookside Meadow Park Meadow Creek 01/31/22 02/18/22 Street Concrete Panel Repair Streets Roy San Miguel
Davis St Jannie St Hettie St 01/24/22 02/26/22 Wastewater Collections will be Wastewater Tiffany Sherrane
5 installing a new wastewater
main line and services.
Scripture St Marietta St Bradley St 02/01/22 03/04/22 Installation of 24"RCP pipe Drainage Gabriel Rodriguez
across the Street to a Storm
Drain Inlet on the south side of
the road on the south side of
the Road
Stuart Rd South of Keystone Court North of Keystone Court 01/24/22 01/28/22 Replacing concrete road panels Private Development Tucker Eller
Exported on January 14,2022 11:23:45 AM CST Page 1 of 1
2 Street Closure Report: Current Closures smartsheet
I Closure Start Closure End Department I
Street/Intersection From To Date Date Description Department Contact
1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David
Venue Grade on Allred Works Inspections
2 Amherst Georgetown Malone 10/18/21 02/25/22 Street Reconstruction Streets Roy San Miguel
Archer Trail Foxcroft Circle Emerson 11/08/21 01/28/22 Residential roadway Engineering Dustin Draper
3 reconstruction and during the
construction only resident traffic
will be allowed.
Bell Ave Withers St Mingo Rd 01/07/22 02/18/22 Water Distribution will be Water Tiffany Sherrane
4 installing a new water main line
and services.
5 Chestnut Street South Welch Street Bernard Street 10/18/21 02/28/22 Utility installations and Engineering Scott Fettig
pavement replacement.
6 Cyrus Way Teal Harvest Glen 01/10/22 02/18/22 Concrete Panel and Sidewalk Streets Roy San Miguel
Repair
Foxcroft C I R Archer Trail Emerson 01/05/22 02/04/22 Residential roadway Engineering Dustin Draper
7 reconstruction and during the
construction only resident traffic
will be allowed.
Foxcroft Cir Emerson Old North 01/18/22 02/18/22 Residential roadway Engineering Dustin Draper
8 reconstruction and during the
construction only resident traffic
will be allowed.
9 Montecito Settlement Field Bend 01/18/22 03/04/22 Concrete Street Panel and Streets Roy San Miguel
Sidewalk Repair
10 North Texas Blvd. Eagle Dr to Oak There will be multiple phases of 12/13/21 08/01/22 Utility installations and Scott Fettig
closures.Will not be all at one pavement replacement.
Orr Street Elm Street Locust Street 10/25/21 01/19/22 Roadway Reconstruction this Engineering Dustin Draper
11 project only affects one
business and notification was
direct with the business owner.
12 Stella St. North Texas Blvd Bonnie Brae 10/29/21 03/15/22 Utility installations and Engineering Scott Fettig
pavement replacement.
13 Sweet Gate Lake View Autumn Path 01/03/22 02/11/22 Concrete Street Panel Repair Streets Roy San Miguel
14 Warschun Rd E Sherman Dr(FM 428) Sauls Rd 12/08/21 01/21/22 Drainage pipe extension and Engineering Dustin Draper
Turn lane addition
15 Welch Street Eagle Street West Collins St. 11/29/21 02/18/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Williamsburg Row Jamestown Ln Nottingham Dr 10/26/21 01/21/22 Wastewater Collection will be Wastewater Tiffany Sherrane
16 installing a new wastewater
main line and services
17 Windsor Bonnie Brae Parkside 08/09/21 01/31/22 Pavement Restoration Private Development Public Jeremiah Tillman-David
Works Inspections
Exported on January 14,2022 11:24:10 AM CST Page 1 of 1
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection Description Department Contact
Bell Ave at Mingo Rd 11/22/21 01/06/22 Water Distribution will be Water Tiffany Sherrane
1 installing a new water main line
and services.
Bonnie Brae Street Scripture Oak 12/20/21 12/22/21 The contractor will begin Engineering Robin Davis
making the crossing of the 42-
inch Transmission Main from
the west side of Bonnie Brae
Street to the east side,requiring
a full closure at the crossing
location. The full width open cut
will take place near 316 N.
Bonnie Brae.This work is
2 anticipated to be complete by
close of business on
Wednesday December 22nd.
Therefore,Bonnie Brae Street
will be closed from the Scripture
Roundabout to Oak Street to
THRU Traffic. Local traffic
access to medical facilities,
businesses and residences will
be allowed. Detour signs will be
posted accordingly.
3 Elm Hickory Eagle 05/11/20 12/31/21 PEC 4 Utility Project Engineering Seth Garcia
4 Frame St @ Railroad Crossing 01/06/22 01/06/22 UPRR Planned maintenance
5 Hickory St @ Railroad Crossing 01/05/22 01/05/22 UPRR Planned maintenance
Hickory Street Welch Carroll 08/31/20 12/31/21 Construction is set to begin on Engineering Kyle Pedigo
West Hickory Street between N.
Welch Street and Carroll Blvd in
October of 2020 and continue
6 through September of 2021.
Detailed lane closure
information is forthcoming
pending approval of the
contractor's phasing and traffic
control plans.
7 Keystone Ct East of 1109 Keystone Court Stuart Road 12/13/21 12/19/21 Replacing concrete road panels Private Development Tucker Eller
Locksley Lane Emerson Maid Marion 11/08/21 12/31/21 Residential Roadway Engineering Dustin Draper
8 reconstruction,and during the
construction resident traffic only
will be allowed.
9 Long Road W of LaGrone Academy School E of LaGrone Academy School 12/20/21 12/23/21 Replacing concrete road panels Private Development Tucker Eller
Mckinney duchess Glengarry 02/01/21 12/24/21 McKinney-Mayhill Intersection Engineering Trevor Crain
This project is widening the
intersection and 600'each way
10 to match existing conditions
along McKinney.Also includes
water,wastewater,and
drainage improvements.
11 McKinney St @ Railroad Crossing 01/05/22 01/05/22 UPRR Planned maintenance
Mingo Rd Shawnee St Nottingham Dr 12/13/21 12/17/21 Wastewater Collections will be Wastewater Jake George
12 installing a new sanitary sewer
manhole.
Montecito Buena Vista Palo Verde 11/29/21 01/07/22 Concrete Sidewalk Repair. Streets Robbin Webber
13 Remove failed sections and
install new concrete
14 Prairie St @ Railroad Crossing 01/04/22 01/04/22 UPRR Planned maintenance
15 Sycamore St @ Railroad Crossing 01/04/22 01/04/22 UPRR Planned maintenance
16 Western Blvd Jim Chrystal Airport Rd 08/16/21 12/31/21 Paving:Decal Lanes Private Development Public Jeremiah Tillman-David
Works Inspections
Exported on January 14,2022 11:24:23 AM CST Page 1 of 2
Street/I ritersection Closure Start I Closure End Description Department Department Contact
-AN M Date Date
17 Willis St @ Railroad Crossing 01/06/22 01/06/22 UPRR Planned maintenance