Loading...
2022/01/21 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Jan 24 - Jan 30 Street/Intersection Description Department Contact Bell Ave Texas St Withers St 02/19/22 03/25/22 Water Distribution will be Water Tiffany Sherrane 1 installing a new water main line and services. Bernard St Hickory St Chestnut St 06/23/22 08/04/22 Water Distribution will be Water Tiffany Sherrane 2 replacing the water main line and services. 3 Brookside Meadow Park Meadow Creek 01/31/22 02/18/22 Street Concrete Panel Repair Streets Roy San Miguel Davis St Jannie St Hattie St 01/31/22 03/05/22 Wastewater Collections will be Wastewater Tiffany Sherrane 4 installing a new wastewater main line and services. Scripture St Marietta St Bradley St 02/01/22 03/04/22 Installation of 24"RCP pipe Drainage Gabriel Rodriguez across the Street to a Storm 5 Drain Inlet on the south side of the road on the south side of the Road Exported on January 21,2022 11:47:06 AM CST Page 1 of 1 2 Street Closure Report: Current Closures smartsheet I Closure Start Closure End Department I Street/Intersection From To Date Date Description Department Contact 1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David Venue Grade on Allred Works Inspections 2 Amherst Georgetown Malone 10/18/21 02/25/22 Street Reconstruction Streets Roy San Miguel Archer Trail Foxcroft Circle Emerson 11/08/21 01/28/22 Residential roadway Engineering Dustin Draper 3 reconstruction and during the construction only resident traffic will be allowed. 4 Athens Tawakoni Dr. New Ballinger Dr 01/24/22 02/11/22 Street Concrete Panel Repair Streets Roy San Miguel Bell Ave Withers St Mingo Rd 01/07/22 02/18/22 Water Distribution will be Water Tiffany Sherrane 5 installing a new water main line and services. 6 Chestnut Street South Welch Street Bernard Street 10/18/21 02/28/22 Utility installations and Engineering Scott Fettig pavement replacement. 7 Cyrus Way Teal Harvest Glen 01/10/22 02/18/22 Concrete Panel and Sidewalk Streets Roy San Miguel Repair Foxcroft CIR Archer Trail Emerson 01/05/22 02/04/22 Residential roadway Engineering Dustin Draper 8 reconstruction and during the construction only resident traffic will be allowed. Foxcroft Cir Emerson Old North 01/18/22 02/18/22 Residential roadway Engineering Dustin Draper 9 reconstruction and during the construction only resident traffic will be allowed. 10 Montecito Settlement Field Bend 01/18/22 03/04/22 Concrete Street Panel and Streets Roy San Miguel Sidewalk Repair 11 North Texas Blvd. Eagle Dr to Oak There will be multiple phases of 12/13/21 08/01/22 Utility installations and Scott Fettig closures.Will not be all at one pavement replacement. 12 Stella St. North Texas Blvd Bonnie Brae 10/29/21 03/15/22 Utility installations and Engineering Scott Fettig pavement replacement. 13 Stuart Rd South of Keystone Court North of Keystone Court 01/24/22 01/28/22 Replacing concrete road panels Private Development Tucker Eller 14 Sweet Gate Lake View Autumn Path 01/03/22 02/11/22 Concrete Street Panel Repair Streets Roy San Miguel 15 Warschun Rd E Sherman Dr(FM 428) Sauls Rd 12/08/21 01/21/22 Drainage pipe extension and Engineering Dustin Draper Turn lane addition 16 Welch Street Eagle Street West Collins St. 11/29/21 02/18/22 Utility installations and Engineering Scott Fettig pavement replacement. Williamsburg Row Jamestown Ln Nottingham Dr 10/26/21 01/28/22 Wastewater Collection will be Wastewater Tiffany Sherrane 17 installing a new wastewater main line and services 18 Windsor Bonnie Brae Parkside 08/09/21 01/31/22 Pavement Restoration Private Development Public Jeremiah Tillman-David Works Inspections Exported on January 21,2022 11:41:14 AM CST Page 1 of 1 3 Street Closure Report: Completed Closures smartsheet Street/Intersection Description Department Contact Bell Ave at Mingo Rd 11/22/21 01/06/22 Water Distribution will be Water Tiffany Sherrane 1 installing a new water main line and services. Bonnie Brae Street Scripture Oak 12/20/21 12/22/21 The contractor will begin Engineering Robin Davis making the crossing of the 42- inch Transmission Main from the west side of Bonnie Brae Street to the east side,requiring a full closure at the crossing location. The full width open cut will take place near 316 N. Bonnie Brae.This work is 2 anticipated to be complete by close of business on Wednesday December 22nd. Therefore,Bonnie Brae Street will be closed from the Scripture Roundabout to Oak Street to THRU Traffic. Local traffic access to medical facilities, businesses and residences will be allowed. Detour signs will be posted accordingly. 3 Elm Hickory Eagle 05/11/20 12/31/21 PEC 4 Utility Project Engineering Seth Garcia 4 Frame St @ Railroad Crossing 01/06/22 01/06/22 UPRR Planned maintenance 5 Hickory St @ Railroad Crossing 01/05/22 01/05/22 UPRR Planned maintenance Hickory Street Welch Carroll 08/31/20 12/31/21 Construction is set to begin on Engineering Kyle Pedigo West Hickory Street between N. Welch Street and Carroll Blvd in October of 2020 and continue 6 through September of 2021. Detailed lane closure information is forthcoming pending approval of the contractor's phasing and traffic control plans. Locksley Lane Emerson Maid Marion 11/08/21 12/31/21 Residential Roadway Engineering Dustin Draper 7 reconstruction,and during the construction resident traffic only will be allowed. 8 Long Road W of LaGrone Academy School E of LaGrone Academy School 12/20/21 12/23/21 Replacing concrete road panels Private Development Tucker Eller Mckinney duchess Glengarry 02/01/21 12/24/21 McKinney-Mayhill Intersection Engineering Trevor Crain This project is widening the intersection and 600'each way 9 to match existing conditions along McKinney.Also includes water,wastewater,and drainage improvements. 10 McKinney St @ Railroad Crossing 01/05/22 01/05/22 UPRR Planned maintenance Montecito Buena Vista Palo Verde 11/29/21 01/07/22 Concrete Sidewalk Repair. Streets Robbin Webber 11 Remove failed sections and install new concrete Orr Street Elm Street Locust Street 10/25/21 01/19/22 Roadway Reconstruction this Engineering Dustin Draper 12 project only affects one business and notification was direct with the business owner. 13 Prairie St @ Railroad Crossing 01/04/22 01/04/22 UPRR Planned maintenance 14 Sycamore St @ Railroad Crossing 01/04/22 01/04/22 UPRR Planned maintenance 15 Western Blvd Jim Chrystal Airport Rd 08/16/21 12/31/21 Paving:Decal Lanes Private Development Public Jeremiah Tillman-David Works Inspections Exported on January 21,2022 11:41:54 AM CST Page 1 of 2 Street/Intersection Closure Start I Closure End Department Department Contact --Am Date Date 16 Willis St @ Railroad Crossing 01/06/22 01/06/22 UPRR Planned maintenance Exported on January 21,2022 11:41:54 AM CST Page 2 of 2