Loading...
2022/02/04 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Feb 7th - 13th Street/Intersection =ME Description Department Contact Bell Ave Texas St Withers St 02/19/22 03/25/22 Water Distribution will be Water Tiffany Sherrane 1 installing a new water main line and services. Bernard St Hickory St Chestnut St 06/20/23 07/31/23 Water Distribution will be Water Tiffany Sherrane 2 replacing the water main line and services. 3 Mockingbird Christopher Dr Penniman Dr 02/07/22 02/21/22 Installing Junction Box and Private Development Armando Beltran connecting waterline Exported on February 4,2022 11:53:18 AM CST Page 1 of 1 2 Street Closure Report: Current Closures smartsheet Street/Intersection M From To Closure Start Closure End I Date Date Description Department Department Contact 1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David Venue Grade on Allred Works Inspections 2 Amherst Georgetown Malone 10/18/21 02/25/22 Street Reconstruction Streets Roy San Miguel Bell Ave Withers St Mingo Rd 01/07/22 02/18/22 Water Distribution will be Water Tiffany Sherrane 3 installing a new water main line and services. Bonnie Brae Street Scripture Panhandle 02/10/22 02/18/22 The contractor will begin Engineering Robin Davis making the connection of the new 42-inch Transmission Main to the existing Main.Therefore, both northbound lanes of Bonnie Brae Street from 4 Scripture to Panhandle Street will be closed.North bound Traffic will be detoured to turn right on Scripture,left on Thomas,and left on Panhandle to finally arrive back on Bonnie Brae Street.Detour signs will be posted accordingly. 5 Chestnut Street South Welch Street Bernard Street 10/18/21 03/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 8 Cyrus Way Teal Harvest Glen 01/10/22 02/18/22 Concrete Panel and Sidewalk Streets Roy San Miguel Repair Davis St Jannie St Hettie St 01/31/22 03/05/22 Wastewater Collections will be Wastewater Tiffany Sherrane 7 installing a new wastewater main line and services. Foxcroft Cir Emerson Old North 01/18/22 02/18/22 Residential roadway Engineering Dustin Draper 8 reconstruction and during the construction only resident traffic will be allowed. 9 Montecito Settlement Field Bend 01/18/22 03/04/22 Concrete Street Panel and Streets Roy San Miguel Sidewalk Repair 10 North Texas Blvd. Eagle Dr to Oak There will be multiple phases of 12/13/21 08/01/22 Utility installations and Scott Fettig closures.Will not be all at one pavement replacement. Scripture St Marietta St Bradley St 02/01/22 03/04/22 Installation of 24"RCP pipe Drainage Gabriel Rodriguez across the Street to a Storm 11 Drain Inlet on the south side of the road on the south side of the Road 12 Stella St. North Texas Blvd Bonnie Brae i 10/29/21 03/15/22 Utility installations and Engineering Scott Fettig pavement replacement. 13 Welch Street Eagle Street West Collins St. 11/29/21 02/18/22 Utility installations and Engineering Scott Fettig pavement replacement. Exported on February 4,2022 11:55:00 AM CST Page 1 of 1 3 Street Closure Report: Completed Closures smartsheet I Closure Starr, Closure End I Street/Intersection From Date Date Description Department Department Contact Archer Trail Foxcroft Circle Emerson 11/08/21 02/16/22 Residential roadway Engineering Dustin Draper 1 reconstruction and during the construction only resident traffic will be allowed. Bell Ave at Mingo Rd 11/22/21 01/06/22 Water Distribution will be Water Tiffany Sherrane 2 installing a new water main line and services. Foxcroft CIR Archer Trail Emerson 01/05/22 02/04/22 Residential roadway Engineering Dustin Draper 3 reconstruction and during the construction only resident traffic will be allowed. 4 Frame St @ Railroad Crossing 01/06/22 01/06/22 UPRR Planned maintenance 5 Hickory St @ Railroad Crossing 01/05/22 01/05/22 UPRR Planned maintenance 6 McKinney St @ Railroad Crossing 01/05/22 01/05/22 UPRR Planned maintenance Montecito Buena Vista Palo Verde 11/29/21 01/07/22 Concrete Sidewalk Repair. Streets Robbin Webber 7 Remove failed sections and install new concrete Orr Street Elm Street Locust Street 10/25/21 01/19/22 Roadway Reconstruction this Engineering Dustin Draper 8 project only affects one business and notification was direct with the business owner. 9 Stuart Rd South of Keystone Court North of Keystone Court 01/24/22 02/02/22 Replacing concrete road panels Private Development Tucker Eller 10�:. rschun weet Gate Lake View Autumn Path 01/03/22 02/11/22 Concrete Street Panel Repair Streets Roy San Miguel 11 Rd E Sherman Dr(FM 428) Sauls Rd 12/08/21 01/21/22 Drainage pipe extension and Engineering Dustin Draper Turn lane addition Williamsburg Row Jamestown Ln Nottingham Dr 10/26/21 01/28/22 Wastewater Collection will be Wastewater Tiffany Sherrane 12 installing a new wastewater main line and services 13 Willis St @ Railroad Crossing 01/06/22 01/06/22 UPRR Planned maintenance 14 Windsor Bonnie Brae Parkside 08/09/21 01/25/22 Pavement Restoration Private Development Public Jeremiah Tillman-David Works Inspections Exported on February 4,2022 11:55:12 AM CST Page 1 of 1