2022/02/18 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Feb 21 st - 27th
Street/Intersection Description Department Contact
Bell Ave Texas St Withers St 03/12/22 04/15/22 Water Distribution will be Water Tiffany Sherrane
1 installing a new water main line
and services.
Bernard St Hickory St Chestnut St 07/11/23 08/21/23 Water Distribution will be Water Tiffany Sherrane
2 replacing the water main line
and services.
Bonnie Brae Scripture Emery 03/21/22 04/01/22 DIME is performing OPGW Other Mark Zimmerer
3 conductor replacement on the
Hickory to Bonnie Brae electric
transmission line.
4 Brookside Meadow Park Meadow Creek 02/28/22 03/18/22 Concrete Panel Repair Streets Rogelio San Miguel
5 Mockingbird LN Paisley St. Barnes Dr. 03/07/22 02/18/22 Storm Drain connection Private Development Public Armando Beltran
Works Inspections
Exported on February 18,2022 11:31:27 AM CST Page 1 of 1
2 Street Closure Report: Current Closures smartsheet
I Closure Start Closure End I
Street/Intersection From To Date Date Description Department Department Contact
1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David
Venue Grade on Allred Works Inspections
2 Amherst Georgetown Malone 10/18/21 03/11/22 Street Reconstruction Streets Roy San Miguel
3 Athens Tawakoni New Ballinger 02/21/22 03/11/22 Concrete Panel Repair Streets Rogelio San Miguel
Bell Ave Withers St Mingo Rd 01/07/22 03/11/22 Water Distribution will be Water Tiffany Sherrane
4 installing a new water main line
and services.
5 Chestnut Street South Welch Street Bernard Street 10/18/21 03/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
6 Cyrus Way Teal Harvest Glen 01/10/22 03/04/22 Concrete Panel and Sidewalk Streets Roy San Miguel
Repair
Davis St Jennie St Hattie St 01/31/22 03/22/22 Wastewater Collections will be Wastewater Tiffany Sherrane
7 installing a new wastewater
main line and services.
Foxcroft Cir Emerson Old North 01/18/22 03/04/22 Residential roadway Engineering Dustin Draper
8 reconstruction and during the
construction only resident traffic
will be allowed.
9 Jackpine Dr Potterstone St Barrydale Dr 02/21/22 03/11/22 Concrete Panel Repair Streets Rogelio San Miguel
10 Mockingbird Christopher Dr Penniman Dr 03/07/22 03/18/22 Installing Junction Box and Private Development Armando Beltran
connecting waterline
11 Montecito Settlement Field Bend 01/18/22 03/04/22 Concrete Street Panel and Streets Roy San Miguel
Sidewalk Repair
12 North Texas Blvd. Eagle Dr to Oak There will be multiple phases of 12/13/21 08/01/22 Utility installations and Scott Fettig
closures.Will not be all at one pavement replacement.
Scripture St Marietta St Bradley St 02/01/22 03/04/22 Installation of 24"RCP pipe Drainage Gabriel Rodriguez
across the Street to a Storm
13 Drain Inlet on the south side of
the road on the south side of
the Road
14 Stella St. North Texas Blvd Bonnie Brae 10/29/21 05/01/22 Utility installations and Engineering Scott Fettig
pavement replacement.
15 Welch Street Eagle Street West Collins St. 11/29/21 03/04/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on February 18,2022 12:26:25 PM CST Page 1 of 1
3 Street Closure Report: Completed Closures smartsheet
I Closure Starr, Closure End I
Street/Intersection From Date Date Description Department Department Contact
Archer Trail Foxcroft Circle Emerson 11/08/21 02/16/22 Residential roadway Engineering Dustin Draper
1 reconstruction and during the
construction only resident traffic
will be allowed.
Bonnie Brae Street Scripture Panhandle 02/10/22 02/18/22 The contractor will begin Engineering Robin Davis
making the connection of the
new 42-inch Transmission Main
to the existing Main.Therefore,
both northbound lanes of
Bonnie Brae Street from
2 Scripture to Panhandle Street
will be closed.North bound
Traffic will be detoured to turn
right on Scripture,left on
Thomas,and left on Panhandle
to finally arrive back on Bonnie
Brae Street.Detour signs will be
posted accordingly.
Foxcroft CIR Archer Trail Emerson 01/05/22 02/04/22 Residential roadway Engineering Dustin Draper
reconstruction and during the
construction only resident traffic
will be allowed.
Orr Street Elm Street Locust Street 10/25/21 01/19/22 Roadway Reconstruction this Engineering Dustin Draper
project only affects one
business and notification was
direct with the business owner.
5 Stuart Rd South of Keystone Court North of Keystone Court 01/24/22 02/02/22 Replacing concrete road panels Private Development Tucker Eller
6r Sweet Gate Lake View Autumn Path 01/03/22 02/18/22 Concrete Street Panel Repair Streets Roy San Miguel
7 Warschun Rd E Sherman Dr(FM 428) Sauls Rd 12/08/21 01/21/22 Drainage pipe extension and Engineering Dustin Draper
Turn lane addition
Williamsburg Row Jamestown Ln Nottingham Dr 10/26/21 01/28/22 Wastewater Collection will be Wastewater Tiffany Sherrane
8 installing a new wastewater
main line and services
9 Windsor Bonnie Brae Parkside 08/09/21 01/25/22 Pavement Restoration Private Development Public Jeremiah Tillman-David
Works Inspections