Loading...
2022/03/07 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Mar 7th - Mar 13th Street/Intersection Description Department Contact Bernard St Hickory St Chestnut St 07/11/23 08/21/23 Water Distribution will be Water Tiffany Sherrane 1 replacing the water main line and services. Bonnie Brae Scripture Emery 03/21/22 04/01/22 DIME is performing OPGW Other Mark Zimmerer 2 conductor replacement on the Hickory to Bonnie Brae electric transmission line. 3 Depaul Drexel Miramar Dr 03/28/22 04/29/22 Concrete Panel and Sidewalk Streets Roy San Miguel Repair 4 Lakeview Blvd Juniper Dr. Edwards Rd. 03/23/22 04/07/22 attaching to sewer manhole Public Works Inspections Armando Beltran 5 Winding Spream Silent Star Sweet Cloud 03/28/22 04/29/22 Concrete SideWalk Repair Streets Roy San Miguel Exported on March 4,2022 1:29:19 PM CST Page 1 of 1 2 Street Closure Report: Current Closures smartsheet I Closure Start Closure End I Street/Intersection From To Date Date Description Department Department Contact 1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David Venue Grade on Allred Works Inspections 2 Amherst Georgetown Malone 10/18/21 03/11/22 Street Reconstruction Streets Roy San Miguel 3 Athens Tawakoni New Ballinger 02/21/22 03/11/22 Concrete Panel Repair Streets Rogelio San Miguel Bell Ave Withers St Mingo Rd 01/07/22 03/11/22 Water Distribution will be Water Tiffany Sherrane 4 installing a new water main line and services. Bell Ave Texas St Withers St 03/12/22 04/15/22 Water Distribution will be Water Tiffany Sherrane 5 installing a new water main line and services. 6 Brookside Meadow Park Meadow Creek 02/28/22 03/18/22 Concrete Panel Repair Streets Rogelio San Miguel 7 Chestnut Street South Welch Street Bernard Street 10/18/21 03/31/22 Utility installations and Engineering Scott Fettig pavement replacement. Davis St Jennie St Hattie St 01/31/22 03/22/22 Wastewater Collections will be Wastewater Tiffany Sherrane 8 installing a new wastewater main line and services. 9 Jackpine Dr Potterstone St Barrydale Dr 02/21/22 03/11/22 Concrete Panel Repair Streets Rogelio San Miguel 10 Mockingbird Christopher Dr Penniman Dr 03/07/22 03/18/22 Installing Junction Box and Private Development Armando Beltran connecting waterline 11 Mockingbird LN Paisley St. Barnes Dr. 03/07/22 02/18/22 Storm Drain connection Private Development Public Armando Beltran Works Inspections 12 Montecito Settlement Field Bend 01/18/22 03/18/22 Concrete Street Panel and Streets Roy San Miguel Sidewalk Repair 13 North Texas Blvd. Eagle Dr to Oak There will be multiple phases of 12/13/21 08/01/22 Utility installations and Scott Fettig closures.Will not be all at one pavement replacement. 14 Stella St. North Texas Blvd Bonnie Brae 10/29/21 05/01122 Utility installations and Engineering Scott Fettig pavement replacement. Exported on March 4,2022 1:29:28 PM CST Page 1 of 1 3 Street Closure Report: Completed Closures smartsheet Street/Intersection From C 710-Sure End Date Description Department Department Contact Archer Trail Foxcroft Circle Emerson 11/08/21 02/16/22 Residential roadway Engineering Dustin Draper 1 reconstruction and during the construction only resident traffic will be allowed. Bolivar Mimosa Northridge 03/02/22 03/04/22 Restoring Asphalt from Gas Public Works Inspections Ryan Dromgoole Repair,intersection closed for phase 2,half intersection for phase 1.Phase 1 placing asphalt 3/3 and Phase 2 on 3/4. Should be open by end of day on 3/4. Bonnie Brae Street Scripture Panhandle 02/10/22 02/18/22 The contractor will begin Engineering Robin Davis making the connection of the new 42-inch Transmission Main to the existing Main.Therefore, both northbound lanes of Bonnie Brae Street from Scripture to Panhandle Street will be closed.North bound Traffic will be detoured to turn right on Scripture,left on Thomas,and left on Panhandle to finally arrive back on Bonnie Brae Street.Detour signs will be posted accordingly. 4 Cyrus Way Teal Harvest Glen 01/10/22 03/04/22 Concrete Panel and Sidewalk Streets Roy San Miguel Repair Foxcroft CIR Archer Trail Emerson 01/05/22 02/04/22 Residential roadway Engineering Dustin Draper 5 reconstruction and during the construction only resident traffic will be allowed. Foxcroft Cir Emerson Old North 01/18/22 03/04/22 Residential roadway Engineering Dustin Draper 6 reconstruction and during the construction only resident traffic will be allowed. Scripture St Marietta St Bradley St 02/01/22 03/04/22 Installation of 24"RCP pipe Drainage Gabriel Rodriguez across the Street to a Storm 7 Drain Inlet on the south side of the road on the south side of the Road 81 Stuart Rd South of Keystone Court North of Keystone Court 01/24/22 02/02/22 Replacing concrete road panels Private Development Tucker Eller 91 Sweet Gate Lake View Autumn Path 01/03/22 02/18/22 Concrete Street Panel Repair Streets Roy San Miguel 10 Welch Street Eagle Street West Collins St. 11/29/21 03/04/22 Utility installations and Engineering Scott Fettig pavement replacement. Exported on March 4,2022 1:29:39 PM CST Page 1 of 1