2022/03/11 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Mar 14th - Mar 20th
Pswt,ee—tilnerse on From To Closure Sta Description Department Department Contact
I Date M
1 801 Regency Country Club Cul v Sac 04/11/22 04/29/22 Concrete Panel Repair Streets Roy San Miguel
Bernard St Hickory St Chestnut St 07/11/23 08/21/23 Water Distribution will be Water Tiffany Sherrane
2 replacing the water main line
and services.
Bonnie Brae Scripture Emery 03/21/22 04/01/22 DME is performing OPGW Other Mark Zimmerer
3 conductor replacement on the
Hickory to Bonnie Brae electric
transmission line.
4 Depaul Drexel Miramar Dr 03/28/22 04/29/22 Concrete Panel and Sidewalk Streets Roy San Miguel
Repair
5 Lakeview Blvd Juniper Dr. Edwards Rd. 03/23/22 04/07/22 attaching to sewer manhole Public Works Inspections Armando Beltran
6 Long Rd E.Sherman Dr. (428) Holy Springs Rd 04/18/22 05/13/22 Concrete Panel Repair Streets Roy San Miguel
7 Winding Spream Silent Star Sweet Cloud 03/28/22 04/29/22 Concrete SideWalk Repair Streets Roy San Miguel
Exported on March 11,2022 11:24:12 AM CST Page 1 of 1
2 Street Closure Report: Current Closures smartsheet
I Closure Start Closure End I
Street/Intersection From To Date Date Description Department Department Contact
1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David
Venue Grade on Allred Works Inspections
Bell Ave Texas St Withers St 03/12/22 04/15/22 Water Distribution will be Water Tiffany Sherrane
2 installing a new water main line
and services.
3 Brookside Meadow Park Meadow Creek 02/28/22 03/18/22 Concrete Panel Repair Streets Rogelio San Miguel
4 Chestnut Street South Welch Street Bernard Street 10/18/21 04/29/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Davis St Jennie St Hettie St 01/31/22 03/31/22 Wastewater Collections will be Wastewater Tiffany Sherrane
5 installing a new wastewater
main line and services.
6 Mockingbird Christopher Dr Penniman Dr 03/07/22 03/18/22 Installing Junction Box and Private Development Armando Beltran
connecting waterline
7 Montecito Settlement Field Bend 01/18/22 03/18/22 Concrete Street Panel and Streets Roy San Miguel
Sidewalk Repair
8 North Texas Blvd. Eagle Dr to Oak There will be multiple phases of 12/13/21 09/01/22 Utility installations and Engineering Scott Fettig
closures.Will not be all at one pavement replacement.
9 Stella St. North Texas Blvd Bonnie Brae 10/29/21 06/15/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on March 11,2022 11:24:22 AM CST Page 1 of 1
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection From"--'M a Date Description Departmulit Department Contact
IMP-
1 Amherst Georgetown Malone 10/18/21 03/11/22 Street Reconstruction Streets Roy San Miguel
Archer Trail Foxcroft Circle Emerson 11/08/21 02/16/22 Residential roadway Engineering Dustin Draper
2 reconstruction and during the
construction only resident traffic
will be allowed.
Athens Tawakoni New Ballinger 02/21/22 03/11/22 Concrete Panel Repair Streets Rogelio San Miguel
Bell Ave Withers St Mingo Rd 01/07/22 03/11/22 Water Distribution will be Water Tiffany Sherrane
installing a new water main line
and services.
Bolivar Mimosa Northridge 03/02/22 03/04/22 Restoring Asphalt from Gas Public Works Inspections Ryan Dromgoole
Repair,intersection closed for
phase 2,half intersection for
5 phase 1.Phase 1 placing
asphalt 3/3 and Phase 2 on 3/4.
Should be open by end of day
on 3/4.
Bonnie Brae Street Scripture Panhandle 02/10/22 02/18/22 The contractor will begin Engineering Robin Davis
making the connection of the
new 42-inch Transmission Main
to the existing Main.Therefore,
both northbound lanes of
Bonnie Brae Street from
6 Scripture to Panhandle Street
will be closed.North bound
Traffic will be detoured to turn
right on Scripture,left on
Thomas,and left on Panhandle
to finally arrive back on Bonnie
Brae Street.Detour signs will be
posted accordingly.
7 Cyrus Way Teal Harvest Glen 01/10/22 03/04/22 Concrete Panel and Sidewalk Streets Roy San Miguel
Repair
Foxcroft Cir Emerson Old North 01/18/22 03/04/22 Residential roadway Engineering Dustin Draper
8 reconstruction and during the
construction only resident traffic
will be allowed.
9 Jackpine Dr Potterstone St Barrydale Dr 02/21/22 03/11/22 Concrete Panel Repair Streets Rogelio San Miguel
10 Mockingbird LN Paisley St. Barnes Dr. 03/07/22 02/18/22 Storm Drain connection Private Development Public Armando Beltran
Works Inspections
Scripture St Marietta St Bradley St 02/01/22 03/04/22 Installation of 24"RCP pipe Drainage Gabriel Rodriguez
across the Street to a Storm
11 Drain Inlet on the south side of
the road on the south side of
the Road
12 Sweet Gate Lake View Autumn Path 01/03/22 02/18/22 Concrete Street Panel Repair Streets Roy San Miguel
13 Welch Street Eagle Street West Collins St. 11/29/21 03/04/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on March 11,2022 11:24:31 AM CST Page 1 of 1