2022/03/18 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Mar 21 st - 27th
Street/Intersection Department Contact
1 Winding Spream Silent Star Sweet Cloud 03/28/22 04/29/22 Concrete Side Walk Repair Streets Roy San Miguel
2 Depaul Drexel Miramar or 03/28/22 04/29/22 Concrete Panel and Sidewalk Repair Streets Roy San Miguel
3 E Oak St S Bradshaw St N Wood St 04/01/22 05/06/22 Wastewater Collections will be installing a new wastewater Wastewater Tiffany Sherrane
main line and services.
4 East Oak St. North Crawford St North Wood St 04/04/22 05/23/22 Utility installations and pavement replacement. I Engineering Wastewater Scott Fettig
5 801 Regency Country Club Cul v Sac 04/11/22 04/29/22 Concrete Panel Repair Streets Roy San Miguel
6 Long Rd E.Sherman Dr. (428) Holy Springs Rd 04/18/22 05/13/22 Concrete Panel Repair Streets Roy San Miguel
7 Bernard St Hickory St Chestnut St 07/11/23 08/21/23 Water Distribution will be replacing the water main line and Water Tiffany Sherrane
services.
Exported on March 18,2022 11:26:26 AM CDT Page 1 of 1
2 Street Closure Report: Current Closures smartsheet
I Closure Start Closure End I
Street/Intersection From To Date Date Description Department Department Contact
1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David
Venue Grade on Allred Works Inspections
Bell Ave Texas St Withers St 03/12/22 04/15/22 Water Distribution will be Water Tiffany Sherrane
2 installing a new water main line
and services.
Bonnie Brae Scripture Emery 03/21/22 04/01/22 DIME is performing OPGW Other Mark Zimmerer
3 conductor replacement on the
Hickory to Bonnie Brae electric
transmission line.
4 Chestnut Street South Welch Street Bernard Street 10/18/21 04/29/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Davis St Jannie St Hettie St 01/31/22 03/31/22 Wastewater Collections will be Wastewater Tiffany Sherrane
5 installing a new wastewater
main line and services.
6 Hettie St Paisley St East McKinney 03/21/22 05/02/22 Utility installations and Engineering Scott Fettig
pavement replacement.
7 Lakeview Blvd Juniper Dr. Edwards Rd. 03/23/22 04/07/22 attaching to sewer manhole Public Works Inspections Armando Beltran
8 Mockingbird LN Paisley St. Barnes Dr. 03/07/22 03/24/22 Storm Drain connection Private Development Public Armando Beltran
Works Inspections
9 North Bradshaw St. East Hickory East McKinney 03/21/22 05/02/22 Utility installations and Engineering Scott Fettig
pavement replacement.
10 North Crawford St East Hickory East McKinney 03/21/22 05/02/22 Utility installations and Engineering Scott Fettig
pavement replacement.
11 North Texas Blvd. Eagle Dr to Oak There will be multiple phases of 12/13/21 09/01/22 Utility installations and Engineering Scott Fettig
closures.Will not be all at one pavement replacement.
12 Stella St. North Texas Blvd Bonnie Brae 10/29/21 06/15/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on March 18,2022 11:50:33 AM CDT Page 1 of 1
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection From"--'M a Date Description Departmulit Department Contact
IMP-
1 Amherst Georgetown Malone 10/18/21 03/11/22 Street Reconstruction Streets Roy San Miguel
Archer Trail Foxcroft Circle Emerson 11/08/21 02/16/22 Residential roadway Engineering Dustin Draper
2 reconstruction and during the
construction only resident traffic
will be allowed.
Athens Tawakoni New Ballinger 02/21/22 03/11/22 Concrete Panel Repair Streets Rogelio San Miguel
Bell Ave Withers St Mingo Rd 01/07/22 03/11/22 Water Distribution will be Water Tiffany Sherrane
installing a new water main line
and services.
Bolivar Mimosa Northridge 03/02/22 03/04/22 Restoring Asphalt from Gas Public Works Inspections Ryan Dromgoole
Repair,intersection closed for
phase 2,half intersection for
5 phase 1.Phase 1 placing
asphalt 3/3 and Phase 2 on 3/4.
Should be open by end of day
on 3/4.
Bonnie Brae Street Scripture Panhandle 02/10/22 02/18/22 The contractor will begin Engineering Robin Davis
making the connection of the
new 42-inch Transmission Main
to the existing Main.Therefore,
both northbound lanes of
Bonnie Brae Street from
Scripture to Panhandle Street
will be closed.North bound
Traffic will be detoured to turn
right on Scripture,left on
Thomas,and left on Panhandle
to finally arrive back on Bonnie
Brae Street.Detour signs will be
posted accordingly.
7 Brookside Meadow Park Meadow Creek 02/28/22 03/18/22 Concrete Panel Repair Streets Rogelio San Miguel
8 Cyrus Way Teal Harvest Glen 01/10/22 03/04/22 Concrete Panel and Sidewalk Streets Roy San Miguel
Repair
Foxcroft Cir Emerson Old North 01/18/22 03/04/22 Residential roadway Engineering Dustin Draper
9 reconstruction and during the
construction only resident traffic
will be allowed.
10 Jackpine Dr Potterstone St Barrydale Dr 02/21/22 03/11/22 Concrete Panel Repair Streets Rogelio San Miguel
11 Mockingbird Christopher Dr Penniman Dr 03/07/22 03/18/22 Installing Junction Box and Private Development Armando Beltran
connecting waterline
12 Montecito Settlement Field Bend 01/18/22 03/18/22 Concrete Street Panel and Streets Roy San Miguel
Sidewalk Repair
Scripture St Marietta St Bradley St 02/01/22 03/04/22 Installation of 24"RCP pipe Drainage Gabriel Rodriguez
across the Street to a Storm
13 Drain Inlet on the south side of
the road on the south side of
the Road
14 Sweet Gate Lake View Autumn Path 01/03/22 02/18/22 Concrete Street Panel Repair Streets Roy San Miguel
15 Welch Street Eagle Street West Collins St. 11/29/21 03/04/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on March 18,2022 11:50:41 AM CDT Page 1 of 1