2022/04/01 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Apr 4th - 10th
Closure End
Street/Intersection From To Date Description Department Department Contact
1 Bernard St Hickory St Chestnut St 07/11/23 08/21/23 Water Distribution will be replacing the water main line and Water Tiffany Sherrane
services.
2 Long Rd Sherman Dr.E(428) Holy Springs Rd 04/18/22 05/13/22 Concrete Panel Repair Streets Roy San Miguel
3 Regency(801) Country Club Cul v Sac 04/11/22 04/29/22 Concrete Panel Repair Streets Roy San Miguel
4 Sweet Cloud Winding Stream Clear River 04/18/22 05/20/22 Concrete Street Panel and Sidewalk Repair Streets Roy San Miguel
5 Jim Chrystal Western Blvd Masch Branch 04/18/22 08/31/22 Exeter PH2.Installing Public Water,Sewer,and Storm Utilities Private Development Public Jeremiah Tillman-David
Works Inspections
6 Bonnie Brae St Intersection of W Oak St 04/11/22 04/18/22 Water Distribution will be installing a new water main line. Water Tiffany Sherrane
7 Mayhill 1-35 Service road Colarado 04/25/22 05/13/22 Concrete Panel repair Streets Rogelio San Miguel
Exported on April 1,2022 11:43:21 AM CDT Page 1 of 1
2 Street Closure Report: Current Closures smartsheet
I Closure Start Closure End I
Street/Intersection From To Date Date Description Department Department Contact
1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David
Venue Grade on Allred Works Inspections
Bell Ave Texas St Withers St 03/12/22 04/15/22 Water Distribution will be Water Tiffany Sherrane
2 installing a new water main line
and services.
3 Bradshaw St N Hickory St E McKinney St E 03/21/22 05/02/22 Utility installations and Engineering Scott Fettig
pavement replacement.
4 Chestnut Street South Welch Street Bernard Street 10/18/21 04/29/22 Utility installations and Engineering Scott Fettig
pavement replacement.
5 Crawford St N Hickory St E McKinney St E 03/21/22 05/02/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Davis St Jannie St Hettie St 01/31/22 04/08/22 Wastewater Collections will be Wastewater Tiffany Sherrane
6 installing a new wastewater
main line and services.
7 Depaul Drexel Miramar Dr 03/28/22 04/29/22 Concrete Panel and Sidewalk Streets Roy San Miguel
Repair
8 Hattie St Paisley St McKinney St E 03/21/22 05/02/22 Utility installations and Engineering Scott Fettig
pavement replacement.
9 Lakeview Blvd Juniper Dr. Edwards Rd. 03/23/22 04/07/22 attaching to sewer manhole Public Works Inspections Armando Beltran
10 North Texas Blvd. Eagle Dr to Oak There will be multiple phases of 12/13/21 09/01/22 Utility installations and Engineering Scott Fettig
closures.Will not be all at one pavement replacement.
Oak St E Bradshaw St S Wood St N 04/01/22 05/06/22 Wastewater Collections will be Wastewater Tiffany Sherrane
11 installing a new wastewater
main line and services.
12 Oak St E Crawford St N Wood St N 04/04/22 05/23/22 Utility installations and Engineering Wastewater Scott Fettig
pavement replacement.
13 Stella St. North Texas Blvd Bonnie Brae 10/29/21 06/15/22 Utility installations and Engineering Scott Fettig
pavement replacement.
14 Winding Stream Silent Star Sweet Cloud 03/28/22 04/29/22 Concrete SideWalk Repair Streets Roy San Miguel
15 Wolftrap Drive Stuart Road Olympia Drive 04/04/22 04/08/22 Water tap on existing line Private Development Tucker Eller
Exported on April 1,2022 11:44:22 AM CDT Page 1 of 1
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection From"--'M Closure End Description � Department Contact
Date Departmelit
1 Amherst Georgetown Malone 10/18/21 03/11/22 Street Reconstruction Streets Roy San Miguel
2 Athens Tawakoni New Ballinger 02/21/22 03/11/22 Concrete Panel Repair Streets Rogelio San Miguel
Bell Ave Withers St Mingo Rd 01/07/22 03/11/22 Water Distribution will be Water Tiffany Sherrane
3 installing a new water main line
and services.
Bolivar Mimosa Northridge 03/02/22 03/04/22 Restoring Asphalt from Gas Public Works Inspections Ryan Dromgoole
Repair,intersection closed for
phase 2,half intersection for
4 phase 1.Phase 1 placing
asphalt 3/3 and Phase 2 on 3/4.
Should be open by end of day
on 3/4.
Bonnie Brae Scripture Emery 03/21/22 04/01/22 DME is performing OPGW Other Mark Zimmerer
5 conductor replacement on the
Hickory to Bonnie Brae electric
transmission line.
6 Brookside Meadow Park Meadow Creek 02/28/22 03/18/22 Concrete Panel Repair Streets Rogelio San Miguel
7 Cyrus Way Teal Harvest Glen 01/10/22 03/04/22 Concrete Panel and Sidewalk Streets Roy San Miguel
Repair
Foxcroft Cir Emerson Old North 01/18/22 03/04/22 Residential roadway Engineering Dustin Draper
8 reconstruction and during the
construction only resident traffic
will be allowed.
9 Jackpine Dr Potterstone St Barrydale Dr 02/21/22 03/11/22 Concrete Panel Repair Streets Rogelio San Miguel
10 Mockingbird Christopher Dr Penniman Dr 03/07/22 03/18/22 Installing Junction Box and Private Development Armando Beltran
connecting waterline
11 Mockingbird Ln Paisley St. Barnes Dr. 03/07/22 04/01/22 Storm Drain connection Private Development Public Armando Beltran
Works Inspections
12 Montecito Settlement Field Bend 01/18/22 03/18/22 Concrete Street Panel and Streets Roy San Miguel
Sidewalk Repair
Scripture St Marietta St Bradley St 02/01/22 03/04/22 Installation of 24"RCP pipe Drainage Gabriel Rodriguez
across the Street to a Storm
13 Drain Inlet on the south side of
the road on the south side of
the Road
14 Welch Street Eagle Street West Collins St. 11/29/21 03/04/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on April 1,2022 11:44:32 AM CDT Page 1 of 1