2022/04/01 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Apr 4th - 10th Closure End Street/Intersection From To Date Description Department Department Contact 1 Bernard St Hickory St Chestnut St 07/11/23 08/21/23 Water Distribution will be replacing the water main line and Water Tiffany Sherrane services. 2 Long Rd Sherman Dr.E(428) Holy Springs Rd 04/18/22 05/13/22 Concrete Panel Repair Streets Roy San Miguel 3 Regency(801) Country Club Cul v Sac 04/11/22 04/29/22 Concrete Panel Repair Streets Roy San Miguel 4 Sweet Cloud Winding Stream Clear River 04/18/22 05/20/22 Concrete Street Panel and Sidewalk Repair Streets Roy San Miguel 5 Jim Chrystal Western Blvd Masch Branch 04/18/22 08/31/22 Exeter PH2.Installing Public Water,Sewer,and Storm Utilities Private Development Public Jeremiah Tillman-David Works Inspections 6 Bonnie Brae St Intersection of W Oak St 04/11/22 04/18/22 Water Distribution will be installing a new water main line. Water Tiffany Sherrane 7 Mayhill 1-35 Service road Colarado 04/25/22 05/13/22 Concrete Panel repair Streets Rogelio San Miguel Exported on April 1,2022 11:43:21 AM CDT Page 1 of 1 2 Street Closure Report: Current Closures smartsheet I Closure Start Closure End I Street/Intersection From To Date Date Description Department Department Contact 1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David Venue Grade on Allred Works Inspections Bell Ave Texas St Withers St 03/12/22 04/15/22 Water Distribution will be Water Tiffany Sherrane 2 installing a new water main line and services. 3 Bradshaw St N Hickory St E McKinney St E 03/21/22 05/02/22 Utility installations and Engineering Scott Fettig pavement replacement. 4 Chestnut Street South Welch Street Bernard Street 10/18/21 04/29/22 Utility installations and Engineering Scott Fettig pavement replacement. 5 Crawford St N Hickory St E McKinney St E 03/21/22 05/02/22 Utility installations and Engineering Scott Fettig pavement replacement. Davis St Jannie St Hettie St 01/31/22 04/08/22 Wastewater Collections will be Wastewater Tiffany Sherrane 6 installing a new wastewater main line and services. 7 Depaul Drexel Miramar Dr 03/28/22 04/29/22 Concrete Panel and Sidewalk Streets Roy San Miguel Repair 8 Hattie St Paisley St McKinney St E 03/21/22 05/02/22 Utility installations and Engineering Scott Fettig pavement replacement. 9 Lakeview Blvd Juniper Dr. Edwards Rd. 03/23/22 04/07/22 attaching to sewer manhole Public Works Inspections Armando Beltran 10 North Texas Blvd. Eagle Dr to Oak There will be multiple phases of 12/13/21 09/01/22 Utility installations and Engineering Scott Fettig closures.Will not be all at one pavement replacement. Oak St E Bradshaw St S Wood St N 04/01/22 05/06/22 Wastewater Collections will be Wastewater Tiffany Sherrane 11 installing a new wastewater main line and services. 12 Oak St E Crawford St N Wood St N 04/04/22 05/23/22 Utility installations and Engineering Wastewater Scott Fettig pavement replacement. 13 Stella St. North Texas Blvd Bonnie Brae 10/29/21 06/15/22 Utility installations and Engineering Scott Fettig pavement replacement. 14 Winding Stream Silent Star Sweet Cloud 03/28/22 04/29/22 Concrete SideWalk Repair Streets Roy San Miguel 15 Wolftrap Drive Stuart Road Olympia Drive 04/04/22 04/08/22 Water tap on existing line Private Development Tucker Eller Exported on April 1,2022 11:44:22 AM CDT Page 1 of 1 3 Street Closure Report: Completed Closures smartsheet Street/Intersection From"--'M Closure End Description � Department Contact Date Departmelit 1 Amherst Georgetown Malone 10/18/21 03/11/22 Street Reconstruction Streets Roy San Miguel 2 Athens Tawakoni New Ballinger 02/21/22 03/11/22 Concrete Panel Repair Streets Rogelio San Miguel Bell Ave Withers St Mingo Rd 01/07/22 03/11/22 Water Distribution will be Water Tiffany Sherrane 3 installing a new water main line and services. Bolivar Mimosa Northridge 03/02/22 03/04/22 Restoring Asphalt from Gas Public Works Inspections Ryan Dromgoole Repair,intersection closed for phase 2,half intersection for 4 phase 1.Phase 1 placing asphalt 3/3 and Phase 2 on 3/4. Should be open by end of day on 3/4. Bonnie Brae Scripture Emery 03/21/22 04/01/22 DME is performing OPGW Other Mark Zimmerer 5 conductor replacement on the Hickory to Bonnie Brae electric transmission line. 6 Brookside Meadow Park Meadow Creek 02/28/22 03/18/22 Concrete Panel Repair Streets Rogelio San Miguel 7 Cyrus Way Teal Harvest Glen 01/10/22 03/04/22 Concrete Panel and Sidewalk Streets Roy San Miguel Repair Foxcroft Cir Emerson Old North 01/18/22 03/04/22 Residential roadway Engineering Dustin Draper 8 reconstruction and during the construction only resident traffic will be allowed. 9 Jackpine Dr Potterstone St Barrydale Dr 02/21/22 03/11/22 Concrete Panel Repair Streets Rogelio San Miguel 10 Mockingbird Christopher Dr Penniman Dr 03/07/22 03/18/22 Installing Junction Box and Private Development Armando Beltran connecting waterline 11 Mockingbird Ln Paisley St. Barnes Dr. 03/07/22 04/01/22 Storm Drain connection Private Development Public Armando Beltran Works Inspections 12 Montecito Settlement Field Bend 01/18/22 03/18/22 Concrete Street Panel and Streets Roy San Miguel Sidewalk Repair Scripture St Marietta St Bradley St 02/01/22 03/04/22 Installation of 24"RCP pipe Drainage Gabriel Rodriguez across the Street to a Storm 13 Drain Inlet on the south side of the road on the south side of the Road 14 Welch Street Eagle Street West Collins St. 11/29/21 03/04/22 Utility installations and Engineering Scott Fettig pavement replacement. Exported on April 1,2022 11:44:32 AM CDT Page 1 of 1