Loading...
2022/04/15 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Apr 18th - 24th Closure End Street/Intersection From To Date Description Department Department Contact 1 Bernard St. Hickory St. Chestnut St. 07/06/23 08/16/23 Water Distribution will be replacing the water main line and Water Tiffany Sherrane services. 2 Jim Chrystal Western Blvd. Masch Branch 04/18/22 08/31/22 Exeter PH2.Installing Public Water,Sewer,and Storm Utilities Private Development Public Jeremiah Tillman-David Works Inspections 3 Long Rd. Sherman Dr.E(428) Holy Springs Rd 04/18/22 05/13/22 Concrete Panel Repair Streets Roy San Miguel 4 Mayhill Rd. 1-35 Service road Colorado Blvd. 04/25/22 05/13/22 Concrete Panel repair Streets Rogelio San Miguel 5 Sweet Cloud Winding Stream Clear River 04/18/22 05/20/22 Concrete Street Panel and Sidewalk Repair Streets Roy San Miguel 6 Mockingbird LN Mingo RD Stockton St 05/04/22 06/01/22 Sewer manhole installation and 2 water taps. Public Works Inspections Armando Beltran Exported on April 15,2022 11:22:23 AM CDT Page 1 of 1 2 Street Closure Report: Current Closures smartsheet I Closure Start Closure End I Street/Intersection From To Date Date Description Department Department Contact 1 Allred Rd. JM Prosperity Farm Rustic Barn Bonnie Brae St. 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David Venue Grade on Allred Works Inspections 2 Bonnie Brae St. Intersection of Oak St.W 04/11/22 04/18/22 Water Distribution will be Water Tiffany Sherrane installing a new water main line. 3 Bradshaw St.N Hickory St.E McKinney St.E 03/21/22 05/02/22 Utility installations and Engineering Scott Fettig pavement replacement. 4 Chestnut St. Welch St.S Bernard St. 10/18/21 04/99/22 Utility installations and Engineering Scott Fettig pavement replacement. 5 Crawford St N Hickory St E McKinney St E 03/21/22 05/02/22 Utility installations and Engineering Scott Fettig pavement replacement. 6 Depaul Drexel Miramar Dr. 03/28/22 04/29/22 Concrete Panel and Sidewalk Streets Roy San Miguel Repair 7 Hattie St. Paisley St. McKinney St.E 03/21/22 05/02/22 Utility installations and Engineering Scott Fettig pavement replacement. North Texas Blvd. Eagle Dr. Oak St. 12/13/21 09/01/22 Utility installations and Engineering Scott Fettig pavement replacement.There 8 will be multiple phases of closures.Will not be all at one time. Oak St.E Bradshaw St.S Wood St.N 04/01/22 05/06/22 Wastewater Collections will be Wastewater Tiffany Sherrane 9 installing a new wastewater main line and services. 10 Oak St.E Crawford St.N Wood St.N 04/04/22 05/23/22 Utility installations and Engineering Wastewater Scott Fettig pavement replacement. 11 Regency(801) Country Club Cul v Sac 04/11/22 04/29/22 Concrete Panel Repair Streets Roy San Miguel 12 Stella St. North Texas Blvd Bonnie Brae 10/29/21 06/15/22 Utility installations and Engineering Scott Fettig pavement replacement. 13 Winding Stream Silent Star Sweet Cloud 03/28/22 04/29/22 Concrete SideWalk Repair Streets Roy San Miguel 14 Wolftrap Dr. Stuart Rd. Olympia Dr. 04/04/22 04/22/22 Laying RCP across the street to Private Development Tucker Eller connect to existing storm drain. 15 Wood St.N McKinney St.E Hickory St.E 04/11/22 06/30/22 Utility installations and Engineering Scott Fettig pavement replacement. Exported on April 15,2022 1:02:47 PM CDT Page 1 of 1 3 Street Closure Report: Completed Closures smartsheet Street/Intersection From Closure Starr, Closure End Description Department Contact Date Date Bell Ave. Texas St Withers St. 03/12/22 04/10/22 Water Distribution will be Water Tiffany Sherrane 1 installing a new water main line and services. Bonnie Brae Scripture Emery 03/21/22 04/01/22 DME is performing OPGW Other Mark Zimmerer 2 conductor replacement on the Hickory to Bonnie Brae electric transmission line. 3 Brookside Meadow Park Meadow Creek 02/28/22 03/18/22 Concrete Panel Repair Streets Rogelio San Miguel Davis St. Jennie St. Hettie St. 01/31/22 04/08/22 Wastewater Collections will be Wastewater Tiffany Sherrane 4 installing a new wastewater main line and services. 5 Lakeview Blvd Juniper Dr. Edwards Rd. 03/23/22 04/11/22 attaching to sewer manhole Public Works Inspections Armando Beltran 6 Mockingbird Ln. Christopher Dr. Penniman Dr. 03/07/22 03/18/22 Installing Junction Box and Private Development Armando Beltran connecting waterline 7 Mockingbird Ln. Paisley St. Barnes Dr. 03/07/22 04/01/22 Storm Drain connection Private Development Public Armando Beltran Works Inspections 8 Montecito Settlement Field Bend 01/18/22 03/18/22 Concrete Street Panel and Streets Roy San Miguel Sidewalk Repair Exported on April 15,2022 1:02:57 PM CDT Page 1 of 1