2022/05/27 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR May 30th - June 5th
Street/Intersection From Closure"75escription Department Department Contact
Date
1 Atlas Hercules Ln Juno Ln 06/06/22 07/15/22 Replacing gas service lines,open trench,from new main.Road Atmos Public Works Ryan Dromgoole
will be closed from 8am4pm Monday through Friday. Inspections
2 Bernard St. Hickory St. Chestnut St. 07/06/23 08/16/23 Water Distribution will be replacing the water main line and Water Tiffany Sherrane
services.
3 Bryan Street Scripture 228 Bryan Street 06/06/22 06/07/22 Closing Bryan Street June 6 and 7 from 7:00 AM to 4:30 PM to Public Works Inspections Stephany Trammell
remove tower crane from jobsite.
4 Hill Alley Jackson Martin 06/06/22 08/26/22 Utility replacement and roadway reconstruction Engineering Seth Garcia
5 Jackson Morse Hill Alley 06/06/22 08/26/22 Utility replacement and roadway reconstruction Engineering Seth Garcia
6 Morse Lakey Jackson 06/06/22 08/26/22 Utility replacement and roadway reconstruction Engineering Seth Garcia
7 St James Wheeler Ridge Thoroughbred 06/06/22 07/08/22 Concrete Panel and Sidewalk Repair Streets Roy San Miguel
8 Windsor Drive Fireside Lane Bonnie Brae 06/06/22 08/26/22 Utility installations and pavement replacement. Engineering Scott Fettig
Exported on May 27,2022 1:17:24 PM CDT Page 1 of 1
2 Street Closure Report: Current Closures smartsheet
I Closure Start Closure End I
Street/Intersection From To Date Date Description Department Department Contact
1 Allred Rd. JM Prosperity Farm Rustic Barn Bonnie Brae St. 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David
Venue Grade on Allred Works Inspections
77
2 Bell Ave Administration Dr Mingo 05/16/22 07/15/22 1 6 in.Asphalt Mill and Overlay/ Streets I Roy San Miguel
will be split in 3 Sections
Bonnie Brae Scripture 1-35 01/01/20 06/30/22 Installation of water Engineering Streets Water Robin Davis
3 transmission line and
restoration of asphalt
4 Box Wood Smoke Tree Cut V Sac 05/23/22 06/17/22 Concrete Panel Repair Streets Roy San Miguel
5 Bradshaw St.N Hickory St.E McKinney St.E 03/21/22 07/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
6 Chestnut St. Welch St.S Bernard St. 10/18/21 05/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Clover Ln Robinwood Ln Glenwood Ln 05/23/22 09/19/22 Wastewater Collections will be Wastewater Tiffany.sherrane@cityofdenton.
7 installing a new sewer main line com
and services.
College Park Dr Peach St Fowler Dr 04/18/22 07/20/22 Water Distribution will be Water Tiffany Sherrane
8 installing a new water naim line
and services.
9 Crawford St N Hickory St E McKinney St E 03/21/22 07/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Fowler Dr College Park Or Peach St 04/18/22 07/20/22 Water Distribution will be Water Tiffany SHerrane
10 installing a new water main line
and services
11 Foxcroft Circle Archer Trail Northcrest Rd 04/25/22 06/03/22 Street reconstruction Engineering Dustin Draper
12 Foxcroft Circle Old North Emerson 02/11/22 06/17/22 Street reconstruction Engineering Dustin Draper
13 Fry Street Oak St Scripture 05/02/22 05/30/22 Drive Approaches/Sidewalk/ Private Development Public Gabrielle Milam
Water and Sanitary Sewer Works Inspections
14 Green Ivy Robinson Rd English Manor 05/23/22 06/17/22 Concrete Panel and Sidewalk Streets Roy San Miguel
Repair
15 Hattie St. Paisley St. McKinney St.E 03/21/22 07/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
16 Hickory St.E Exposition St. Ruddell St. 05/02/22 08/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
17 Hillcrest St Scripture Panhandle 04/29/22 06/30/22 Street reconstruction Engineering Dustin Draper
Jim Chrystal Western Blvd. Masch Branch 04/18/22 08/31/22 Exeter PH2.Installing Public Private Development Public Jeremiah Tillman-David
18 Water,Sewer,and Storm Works Inspections
Utilities
Live Oak St Robinwood Ln Crestwood PI 05/23/22 09/19/22 Wastewater collections will be Wastewater Tiffany Sherrane
19 installing a new sewer main line
and services.
20 Long Rd. Sherman Dr.E(428) Holy Springs Rd 05/16/22 06/03/22 1 Concrete Panel Repair Streets Roy San Miguel
21 McKinney St E Crawford Rd Audra Ln 05/19/22 09/30/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Mistywood Ln Sherwood St Robinwood Ln 05/23/22 09/19/22 Wastewater Collections will be Wastewater Tiffany Sherrane
22 installing a new sewer main line
and services.
23 Mockingbird Ln Mingo Rd Stockton St 05/04/22 06/01/22 Sewer manhole installation and Public Works Inspections Armando Beltran
2 water taps.
North Texas Blvd. Eagle Dr. Oak St. 12/13/21 09/01/22 Utility installations and Engineering Scott Fettig
pavement replacement.There
24 will be multiple phases of
closures.Will not be all at one
time.
25 Oak St Fulton St Fry St 05/30/22 06/13/22 Utility work in roadway Public Works Inspections Gabrielle Milam
Exported on May 27,2022 1:18:32 PM CDT Page 1 of 2
Intersectionate
• • ,Closure , • • Description DepartmentDepartment
26 Oak St.E Crawford St.N Wood St.N 04/04/22 08/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
27 Parkside Dr. Windsor Dr. Bowling Green ST. 05/31/22 06/10/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Peach St Locust St Palmer Dr 04/18/22 07/20/22 Water Distribution will be Water Tiffany Sherrane
28 installing a new water main line
and services.
Robinwood Ln Kayewwod Dr Emerson Ln 05/23/22 09/19/22 Wastewater Collections will be Wastewater Tiffany Sherrane
29 installing a new sewer main line
and services.
30 Rose St. Paisley St. Uland St. 04/25/22 08/31/22 Pavement Replacement Engineering Scott Fettig
31 Shagbark Vintage Buckthorn 05/31/22 06/17/22 Concrete Panel Replacement Engineering Seth Garcia
32 Stella St. North Texas Blvd Bonnie Brae 10/29/21 06/15/22 Utility installations and Engineering Scott Fettig
pavement replacement.
33 Sycamore St Bernard Carroll Blvd 05/17/22 07/29/22 Street Reconstruction Engineering Dustin Draper
34 Uland St. Rose St, Railroad Ave. 04/25/22 08/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
35 Wood St.N McKinney St.E Hickory St.E 04/11/22 06/30/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on May 27,2022 1:18:32 PM CDT Page 2 of 2
3 Street Closure Report: Completed Closures smartsheet
Intersection • • ClosureDat- Closure_ • Description Department Department
1 Bonnie Brae intersection of Oak St. 05/10/22 05/14/22 Southbound lanes only Engineering Streets Water Robin Davis
2 Depaul Drexel Miramar Dr. 03/28/22 05/12/22 Concrete Panel and Sidewalk Streets Roy San Miguel
Repair
3 Foxcroft Circle Emerson Archer Trail 01/21/22 05/20/22 Street reconstruction Engineering Dustin Draper
4 Foxcroft Circle Northcrest Rd Old North 02/23/22 05/20/22 Street reconstruction Engineering Dustin Draper
Hickory Street Eastbound Bonnie Brae Bonnie Brae 05/16/22 05/27/22 Southbound lanes on Bonnie Engineering Streets Traffic Robin Davis
from Oak Street Split Brae at Hickory will be closed Water
for pavement replacement.
5 Traffic on Bonnie Brae will not
be affected. Through traffic will
be closed at Hickory Street from
the Split on Oak Street.
6 Mayhill Rd. 1-35 Service road Colorado Blvd. 04/25/22 05/12/22 Concrete Panel repair Streets Rogelio San Miguel
7 Northwood Terrace Greenwood Dr. Cherrywood Ln 03/07/22 05/20/22 Street reconstruction Engineering Dustin Draper
Oak St.E Bradshaw St.S Wood St.N 04/01/22 05/06/22 Wastewater Collections will be Wastewater Tiffany Sherrane
8 installing a new wastewater
main line and services.
Oak Street Bonnie Brae Bonnie Brae 05/10/22 05/14/22 Southbound lanes on Bonnie Engineering Streets Water Robin Davis
Brae at Oak will be closed for
9I pavement replacement.Traffic
on Bonnie Brae won't be
affected.Through traffic will be
closed on Oak.
Old Bonnie Brae St. Bonnie Brae St./Roselawn Dr. Bonnie Brae St/Vintage 04/25/22 04/29/22 Road Closure will last Engineering Wastewater Tracy L.Beck,PE,PMP
approximately 2-3 days to install
10 Sanitary Sewer Line under Old
Bonne Brae Road. Weather
may impact timing of closure. .
11 Sweet Cloud Winding Stream Clear River 04/18/22 05/12/22 Concrete Street Panel and Streets Roy San Miguel
Sidewalk Repair
12 Wolftrap Dr. Stuart Rd. Olympia Dr. 04/04/22 05/27/22 Laying RCP across the street to Private Development Tucker Eller
connect to existing storm drain.
Exported on May 27,2022 1:18:41 PM CDT Page 1 of 1