2022/06/03 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR June 6th - 12th
Street/Intersection ME" Department Department Contact
1 7 St James Wheeler Ridge Thoroughbred 06/20/22 07/29/22 Concrete Panel and Sidewalk Repair Streets I Roy San Miguel
Exported on June 3,2022 12:18:19 PM CDT Page 1 of 1
2 Street Closure Report: Current Closures smartsheet
I Closure Start Closure End I
Street/Intersection From To Date Date Description Department Department Contact
1 Allred Rd. JM Prosperity Farm Rustic Barn Bonnie Brae St. 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David
Venue Grade on Allred Works Inspections
Atlas Hercules Ln Juno Ln 06/06/22 07/15/22 Replacing gas service lines, Atmos Public Works Ryan Dromgoole
2 open trench,from new main. Inspections
Road will be closed from 8am-
4pm Monday through Friday.
3 Bell Ave Administration Dr Mingo 05/16/22 07/15/22 6 in.Asphalt Mill and Overlay/ Streets Roy San Miguel
will be split in 3 Sections
Bernard St. Hickory St. Chestnut St. 06/01/23 07/12/23 Water Distribution will be Water Tiffany Sherrane
4 replacing the water main line
and services.
Bonnie Brae Scripture 1-35 01/01/20 06/30/22 Installation of water Engineering Streets Water Robin Davis
5 transmission line and
restoration of asphalt
6 Box Wood Smoke Tree Cul V Sac 05/23/22 06/17/22 Concrete Panel Repair Streets Roy San Miguel
7 Bradshaw St.N Hickory St.E McKinney St.E 03/21/22 07/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Bryan Street Scripture 228 Bryan Street 06/06/22 06/07/22 Closing Bryan Street June 6 Public Works Inspections Stephany Trammell
8 and 7 from 7:00 AM to 4:30 PM
to remove tower crane from
jobsite.
Clover Ln Robinwood Ln Glenwood Ln 05/23/22 09/19/22 Wastewater Collections will be Wastewater Tiffany.sherrane@cityofdenton.
9 installing a new sewer main line com
and services.
College Park Dr Peach St Fowler Dr 04/18/22 07/20/22 Water Distribution will be Water Tiffany Sherrane
10 installing a new water naim line
and services.
11 Crawford St N Hickory St E McKinney St E 03/21/22 07/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Fowler Dr College Park Dr Peach St 04/18/22 07/20/22 Water Distribution will be Water Tiffany SHerrane
12 installing a new water main line
and services
13 Foxcroft Circle Old North Emerson 02/11/22 06/17/22 Street reconstruction Engineering Dustin Draper
14 Fry Street Oak St Scripture 05/10/22 06/10/22 Drive Approaches/Sidewalk/ Private Development Public Gabrielle Milam
Water and Sanitary Sewer Works Inspections
15 Green Ivy Robinson Rd English Manor 05/23/22 06/17/22 Concrete Panel and Sidewalk Streets Roy San Miguel
Repair
16 Hattie St. Paisley St. McKinney St.E 03/21/22 07/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
17 Hickory St.E Exposition St. Ruddell St. 05/02/22 08/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
18 Hill Alley Jackson Martin 06/06/22 08/26/22 Utility replacement and roadway Engineering Seth Garcia
reconstruction
19 Hillcrest St Scripture Panhandle 04/29/22 06/30/22 Street reconstruction Engineering Dustin Draper
20 Jackson Morse Hill Alley 06/06/22 08/26/22 Utility replacement and roadway Engineering Seth Garcia
reconstruction
Jim Chrystal Western Blvd. Masch Branch 04/18/22 08/31/22 Exeter PH2.Installing Public Private Development Public Jeremiah Tillman-David
21 Water,Sewer,and Storm Works Inspections
Utilities
Live Oak St Robinwood Ln Crestwood PI 05/23/22 09/19/22 Wastewater collections will be Wastewater Tiffany Sherrane
22 installing a new sewer main line
and services.
23 Long Rd. Sherman Dr.E(428) Holy Springs Rd 05/16/22 06/17/22 Concrete Panel Repair Streets Roy San Miguel
24 McKinney St E Crawford Rd Audra Ln 05/19/22 09/30/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on June 3,2022 12:18:31 PM CDT Page 1 of 2
Street/Intersection From To Closure Start Department Contact
Date
Mistywood Ln Sherwood St Robinwood Ln 05/23/22 09/19/22 Wastewater Collections will be Wastewater Tiffany Sherrane
25 installing a new sewer main line
and services.
26 Mockingbird Ln Mingo Rd Stockton St 05/04/22 06/13/22 Sewer manhole installation and Public Works Inspections Armando Beltran
2 water taps.
27 Morse Lakey Jackson 06/06/22 08/26/22 Utility replacement and roadway Engineering Seth Garcia
reconstruction
North Texas Blvd. Eagle Dr. Oak St. 12/13/21 09/01/22 Utility installations and Engineering Scott Fettig
pavement replacement.There
28 will be multiple phases of
closures.Will not be all at one
time.
29 Oak St Fulton St Fry St 06/10/22 07/01/22 Utility work in roadway Public Works Inspections Gabrielle Milam
30 Oak St.E Crawford St.N Wood St.N 04/04/22 08/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
31 Parkside Dr. Windsor Dr. Bowling Green ST. 05/31/22 06/10/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Peach St Locust St Palmer Dr 04/18/22 07/20/22 Water Distribution will be Water Tiffany Sherrane
32 installing a new water main line
and services.
Robinwood Ln Kayewwod Dr Emerson Ln 05/23/22 09/19/22 Wastewater Collections will be Wastewater Tiffany Sherrane
33 installing a new sewer main line
and services.
34 Rose St. Paisley St. Uland St. 04/25/22 08/31/22 Pavement Replacement Engineering Scott Fettig
35 Shagbark Vintage Buckthorn 05/31/22 06/17/22 Concrete Panel Replacement Engineering Seth Garcia
36 Stella St. North Texas Blvd Bonnie Brae 10/29/21 06/15/22 Utility installations and Engineering Scott Fettig
pavement replacement.
37 Sycamore St Bernard Carroll Blvd 05/17/22 07/29/22 Street Reconstruction Engineering Dustin Draper
38 Uland St. Rose St, Railroad Ave. 04/25/22 08/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
39 Windsor Drive Fireside Lane Bonnie Brae 06/06/22 08/26/22 Utility installations and Engineering Scott Fettig
pavement replacement.
40 Wood St.N McKinney St.E Hickory St.E 04/11/22 06/30/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on June 3,2022 12:18:31 PM CDT Page 2 of 2
3 Street Closure Report: Completed Closures smartsheet
Intersection • • ClosureDat- Closure_ • Description Department Department
1 Bonnie Brae intersection of Oak St. 05/10/22 05/14/22 Southbound lanes only Engineering Streets Water Robin Davis
2 Chestnut St. Welch St.S Bernard St. 10/18/21 05/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
3 Depaul Drexel Miramar Dr. 03/28/22 05/12/22 Concrete Panel and Sidewalk Streets Roy San Miguel
Repair
4 Foxcroft Circle Emerson Archer Trail 01/21/22 05/20/22 Street reconstruction Engineering Dustin Draper
5 Foxcroft Circle Northcrest Rd Old North 02/23/22 05/20/22 Street reconstruction Engineering Dustin Draper
6 Foxcroft Circle Archer Trail Northcrest Rd 04/25/22 06/03/22 Street reconstruction Engineering Dustin Draper
Hickory Street Eastbound Bonnie Brae Bonnie Brae 05/16/22 05/27/22 Southbound lanes on Bonnie Engineering Streets Traffic Robin Davis
from Oak Street Split Brae at Hickory will be closed Water
for pavement replacement.
7 Traffic on Bonnie Brae will not
be affected. Through traffic will
be closed at Hickory Street from
the Split on Oak Street.
8 Mayhill Rd. 1-35 Service road Colorado Blvd. 04/25/22 05/12/22 Concrete Panel repair Streets Rogelio San Miguel
9 Northwood Terrace Greenwood Dr. Cherrywood Ln 03/07/22 05/20/22 Street reconstruction Engineering Dustin Draper
Oak St.E Bradshaw St.S Wood St.N 04/01/22 05/06/22 Wastewater Collections will be Wastewater Tiffany Sherrane
10 installing a new wastewater
main line and services.
Oak Street Bonnie Brae Bonnie Brae 05/10/22 05/14/22 Southbound lanes on Bonnie Engineering Streets Water Robin Davis
Brae at Oak will be closed for
11 pavement replacement.Traffic
on Bonnie Brae won't be
affected.Through traffic will be
closed on Oak.
12 Sweet Cloud Winding Stream Clear River 04/18/22 05/12/22 Concrete Street Panel and Streets Roy San Miguel
Sidewalk Repair
Wolftrap Dr. Stuart Rd. Olympia Dr. 04/04/22 05/27/22 Laying RCP across the street to Private Development Tucker Eller
connect to existing storm drain.
Exported on June 3,2022 12:18:40 PM CDT Page 1 of 1