Loading...
2022/06/17 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR June 20th - 26th Street/Intersection OEM -Am Description Department Contact 1 Ave A Maple St Highland St 07/05/22 07/15/22 Valley Gutter Repair Streets Roy San Miguel 2 Forest Ridge or El Paseo St Wellington Oaks Cir 07/05/22 08/05/22 Street Panels Repair Streets Roy San Miguel 3 Linden or Malone St Gober St 06/27/22 07/22/22 Curd and Gutter/Valley Gutter Repair Streets Roy San Miguel 4 Marquette or(3608) Centenary Cut v Sac 06/27/22 07/22/22 ADA/Sidewalk Repair Streets Roy San Miguel 5 Oak St. Fulton St Fry St 07/01/22 07/22/22 Utility work in roadway Public Works Inspections Gabrielle Milam 6 Trinity Rd Milts Rd Grissom Rd 06/27/22 07/01/22 Water tap into the Woodlands Privet Public Works Inspections Armando Beltran development. Exported on June 17,2022 10:40:07 AM CDT Page 1 of 1 2 Street Closure Report: Current Closures smartsheet I Closure Start Closure End I Street/Intersection From To Date Date Description Department Department Contact 1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae St 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David Venue Grade on Allred Works Inspections Atlas Dr Hercules Ln Juno Ln 06/06/22 07/15/22 Replacing gas service lines, Atmos Public Works Ryan Dromgoole 2 open trench,from new main. Inspections Road will be closed from 8am- 4pm Monday through Friday. 3 Bell Ave Administration Dr Mingo Rd 05/16/22 07/15/22 6 in.Asphalt Mill and Overlay/ Streets Roy San Miguel will be split in 3 Sections Bernard St Hickory St Chestnut St 06/01/23 07/12/23 Water Distribution will be Water Tiffany Sherrane 4 replacing the water main line and services. Bonnie Brae St Scripture St 1-35 01/01/20 06/30/22 Installation of water Engineering Streets Water Robin Davis 5 transmission line and restoration of asphalt 6 Bradshaw St Hickory St McKinney St 03/21/22 07/31/22 Utility installations and Engineering Scott Fettig pavement replacement. Clover Ln Robinwood Ln Glenwood Ln 05/23/22 09/19/22 Wastewater Collections will be Wastewater Tiffany.sherrane@cityofdenton. 7 installing a new sewer main line com and services. College Park Dr Peach St Fowler Dr 04/18/22 07/20/22 Water Distribution will be Water Tiffany Sherrane 8 installing a new water naim line and services. 9 Crawford St Hickory St McKinney St 03/21/22 07/31/22 Utility installations and Engineering Scott Fettig pavement replacement. Fowler Dr College Park Dr Peach St 04/18/22 07/20/22 Water Distribution will be Water Tiffany SHerrane 10 installing a new water main line and services 11 Foxcroft Cir Old North Rd Emerson Ln 02/11/22 06/27/22 Street reconstruction Engineering Dustin Draper 12 Fry St Oak St Scripture St 05/10/22 07/01/22 Drive Approaches/Sidewalk/ Private Development Public Gabrielle Milam Water and Sanitary Sewer Works Inspections 13 Green Ivy Robinson Rd English Manor 05/23/22 07/08/22 Concrete Panel and Sidewalk Streets Roy San Miguel Repair 14 Hattie St Paisley St McKinney St 03/21/22 07/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 15 Hickory St Exposition St Ruddell St 05/02/22 08/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 16 Hill Alley Jackson St Martin St 06/06/22 08/26/22 Utility replacement and roadway Engineering Seth Garcia reconstruction 17 Hillcrest St Scripture St Panhandle 04/29/22 06/30/22 Street reconstruction Engineering Dustin Draper 18 Jackson Morse St Hill Alley 06/06/22 08/26/22 Utility replacement and roadway Engineering Seth Garcia reconstruction Jim Chrystal Rd Western Blvd Masch Branch Rd 04/18/22 08/31/22 Exeter PH2.Installing Public Private Development Public Jeremiah Tillman-David 19 Water,Sewer,and Storm Works Inspections Utilities Live Oak St Robinwood Ln Crestwood PI 05/23/22 09/19/22 Wastewater collections will be Wastewater Tiffany Sherrane 20 installing a new sewer main line and services. 21 McKinney St Crawford Rd Audra Ln 05/19/22 09/30/22 Utility installations and Engineering Scott Fettig pavement replacement. Mistywood Ln Sherwood St Robinwood Ln 05/23/22 09/19/22 Wastewater Collections will be Wastewater Tiffany Sherrane 22 installing a new sewer main line and services. 23 Morse St Lakey St Jackson St 06/06/22 08/26/22 Utility replacement and roadway Engineering Seth Garcia reconstruction Exported on June 17,2022 11:02:18 AM CDT Page 1 of 2 Intersection • To ,ate Closure • • Description Department Department North Texas Blvd Eagle Dr Oak St 12/13/21 09/01/22 Utility installations and Engineering Scott Fettig pavement replacement.There 24 will be multiple phases of closures.Will not be all at one time. 25 North Texas Blvd Oak St Hickory St 06/10/22 06/24/22 Utility installations and Engineering Scott Fettig pavement replacement. 26 Oak St.E Crawford St Wood St 04/04/22 08/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 27 Oak St.W Bradley St North Texas Blvd 06/10/22 06/22/22 Utility installations and Engineering Scott Fettig pavement replacement. 28 Parkside Dr Windsor Dr Bowling Green St 05/31/22 07/15/22 Utility installations and Engineering Scott Fettig pavement replacement. Peach St Locust St Palmer Dr 04/18/22 07/20/22 Water Distribution will be Water Tiffany Sherrane 29 installing a new water main line and services. Robinwood Ln Kayewwod Dr Emerson Ln 05/23/22 09/19/22 Wastewater Collections will be Wastewater Tiffany Sherrane 30 installing a new sewer main line and services. 31 Rose St Paisley St Uland St 04/25/22 08/31/22 Pavement Replacement Engineering Scott Fettig 32 Shagbark Vintage Blvd Buckthorn Ln 05/31/22 06/24/22 Concrete Panel Replacement Engineering Seth Garcia 33 St James PI Wheeler Ridge Dr Thoroughbred Trl 06/20/22 07/29/22 Concrete Panel and Sidewalk Streets Roy San Miguel Repair 34 Stella St North Texas Blvd Bonnie Brae St 10/29/21 08/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 35 Sycamore St Bernard St Carroll Blvd 05/17/22 07/29/22 Street Reconstruction Engineering Dustin Draper 36 Uland St Rose St Railroad Ave 04/25/22 08/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 37 Windsor Or Fireside Ln Bonnie Brae St 06/06/22 08/26/22 Utility installations and Engineering Scott Fettig pavement replacement. 38 Wood St McKinney St Hickory St 04/11/22 06/30/22 Utility installations and Engineering Scott Fettig pavement replacement. Exported on June 17,2022 11:02:18 AM CDT Page 2 of 2 3 Street Closure Report: Completed Closures smartsheet Street/Intersection From Date Description Department Department Contact 1 Box Wood Smoke Tree Cul V Sac 05/23/22 06/16/22 Concrete Panel Repair Streets Roy San Miguel Bryan St Scripture 228 Bryan St 06/06/22 06/07/22 Closing Bryan Street June 6 Public Works Inspections Stephany Trammell 2 and 7 from 7:00 AM to 4:30 PM to remove tower crane from jobsite. 3 Chestnut St Welch St Bernard St 10/18/21 05/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 4 Foxcroft Circle Emerson Archer Trail 01/21/22 05/20/22 Street reconstruction Engineering Dustin Draper 5 Foxcroft Circle Northcrest Rd Old North 02/23/22 05/20/22 Street reconstruction Engineering Dustin Draper 6 Foxcroft Circle Archer Trail Northcrest Rd 04/25/22 06/03/22 Street reconstruction Engineering Dustin Draper Hickory St Eastbound from Bonnie Brae Bonnie Brae 05/16/22 05/27/22 Southbound lanes on Bonnie Engineering Streets Traffic Robin Davis Oak Street Split Brae at Hickory will be closed Water for pavement replacement. 7 Traffic on Bonnie Brae will not be affected. Through traffic will be closed at Hickory Street from the Split on Oak Street. 8 Long Rd Sherman Dr(428) Holy Springs Rd 05/16/22 06/16/22 Concrete Panel Repair Streets Roy San Miguel g Mockingbird Ln Mingo Rd Stockton St 05/04/22 06/13/22 Sewer manhole installation and Public Works Inspections Armando Beltran 2 water taps. 10 Northwood Terrace Greenwood Dr Cherrywood Ln 03/07/22 05/20/22 Street reconstruction Engineering Dustin Draper 11 Wolftrap Dr Stuart Rd. Olympia Dr 04/04/22 05/27/22 Laying RCP across the street to Private Development Tucker Eller connect to existing storm drain. Exported on June 17,2022 11:03:32 AM CDT Page 1 of 1