2022/06/17 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR June 20th - 26th
Street/Intersection OEM -Am Description Department Contact
1 Ave A Maple St Highland St 07/05/22 07/15/22 Valley Gutter Repair Streets Roy San Miguel
2 Forest Ridge or El
Paseo St Wellington Oaks Cir 07/05/22 08/05/22 Street Panels Repair Streets Roy San Miguel
3 Linden or Malone St Gober St 06/27/22 07/22/22 Curd and Gutter/Valley Gutter Repair Streets Roy San Miguel
4 Marquette or(3608) Centenary Cut v Sac 06/27/22 07/22/22 ADA/Sidewalk Repair Streets Roy San Miguel
5 Oak St. Fulton St Fry St 07/01/22 07/22/22 Utility work in roadway Public Works Inspections Gabrielle Milam
6 Trinity Rd Milts Rd Grissom Rd 06/27/22 07/01/22 Water tap into the Woodlands Privet Public Works Inspections Armando Beltran
development.
Exported on June 17,2022 10:40:07 AM CDT Page 1 of 1
2 Street Closure Report: Current Closures smartsheet
I Closure Start Closure End I
Street/Intersection From To Date Date Description Department Department Contact
1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae St 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David
Venue Grade on Allred Works Inspections
Atlas Dr Hercules Ln Juno Ln 06/06/22 07/15/22 Replacing gas service lines, Atmos Public Works Ryan Dromgoole
2 open trench,from new main. Inspections
Road will be closed from 8am-
4pm Monday through Friday.
3 Bell Ave Administration Dr Mingo Rd 05/16/22 07/15/22 6 in.Asphalt Mill and Overlay/ Streets Roy San Miguel
will be split in 3 Sections
Bernard St Hickory St Chestnut St 06/01/23 07/12/23 Water Distribution will be Water Tiffany Sherrane
4 replacing the water main line
and services.
Bonnie Brae St Scripture St 1-35 01/01/20 06/30/22 Installation of water Engineering Streets Water Robin Davis
5 transmission line and
restoration of asphalt
6 Bradshaw St Hickory St McKinney St 03/21/22 07/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Clover Ln Robinwood Ln Glenwood Ln 05/23/22 09/19/22 Wastewater Collections will be Wastewater Tiffany.sherrane@cityofdenton.
7 installing a new sewer main line com
and services.
College Park Dr Peach St Fowler Dr 04/18/22 07/20/22 Water Distribution will be Water Tiffany Sherrane
8 installing a new water naim line
and services.
9 Crawford St Hickory St McKinney St 03/21/22 07/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Fowler Dr College Park Dr Peach St 04/18/22 07/20/22 Water Distribution will be Water Tiffany SHerrane
10 installing a new water main line
and services
11 Foxcroft Cir Old North Rd Emerson Ln 02/11/22 06/27/22 Street reconstruction Engineering Dustin Draper
12 Fry St Oak St Scripture St 05/10/22 07/01/22 Drive Approaches/Sidewalk/ Private Development Public Gabrielle Milam
Water and Sanitary Sewer Works Inspections
13 Green Ivy Robinson Rd English Manor 05/23/22 07/08/22 Concrete Panel and Sidewalk Streets Roy San Miguel
Repair
14 Hattie St Paisley St McKinney St 03/21/22 07/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
15 Hickory St Exposition St Ruddell St 05/02/22 08/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
16 Hill Alley Jackson St Martin St 06/06/22 08/26/22 Utility replacement and roadway Engineering Seth Garcia
reconstruction
17 Hillcrest St Scripture St Panhandle 04/29/22 06/30/22 Street reconstruction Engineering Dustin Draper
18 Jackson Morse St Hill Alley 06/06/22 08/26/22 Utility replacement and roadway Engineering Seth Garcia
reconstruction
Jim Chrystal Rd Western Blvd Masch Branch Rd 04/18/22 08/31/22 Exeter PH2.Installing Public Private Development Public Jeremiah Tillman-David
19 Water,Sewer,and Storm Works Inspections
Utilities
Live Oak St Robinwood Ln Crestwood PI 05/23/22 09/19/22 Wastewater collections will be Wastewater Tiffany Sherrane
20 installing a new sewer main line
and services.
21 McKinney St Crawford Rd Audra Ln 05/19/22 09/30/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Mistywood Ln Sherwood St Robinwood Ln 05/23/22 09/19/22 Wastewater Collections will be Wastewater Tiffany Sherrane
22 installing a new sewer main line
and services.
23 Morse St Lakey St Jackson St 06/06/22 08/26/22 Utility replacement and roadway Engineering Seth Garcia
reconstruction
Exported on June 17,2022 11:02:18 AM CDT Page 1 of 2
Intersection
• To ,ate Closure • • Description Department Department
North Texas Blvd Eagle Dr Oak St 12/13/21 09/01/22 Utility installations and Engineering Scott Fettig
pavement replacement.There
24 will be multiple phases of
closures.Will not be all at one
time.
25 North Texas Blvd Oak St Hickory St 06/10/22 06/24/22 Utility installations and Engineering Scott Fettig
pavement replacement.
26 Oak St.E Crawford St Wood St 04/04/22 08/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
27 Oak St.W Bradley St North Texas Blvd 06/10/22 06/22/22 Utility installations and Engineering Scott Fettig
pavement replacement.
28 Parkside Dr Windsor Dr Bowling Green St 05/31/22 07/15/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Peach St Locust St Palmer Dr 04/18/22 07/20/22 Water Distribution will be Water Tiffany Sherrane
29 installing a new water main line
and services.
Robinwood Ln Kayewwod Dr Emerson Ln 05/23/22 09/19/22 Wastewater Collections will be Wastewater Tiffany Sherrane
30 installing a new sewer main line
and services.
31 Rose St Paisley St Uland St 04/25/22 08/31/22 Pavement Replacement Engineering Scott Fettig
32 Shagbark Vintage Blvd Buckthorn Ln 05/31/22 06/24/22 Concrete Panel Replacement Engineering Seth Garcia
33 St James PI Wheeler Ridge Dr Thoroughbred Trl 06/20/22 07/29/22 Concrete Panel and Sidewalk Streets Roy San Miguel
Repair
34 Stella St North Texas Blvd Bonnie Brae St 10/29/21 08/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
35 Sycamore St Bernard St Carroll Blvd 05/17/22 07/29/22 Street Reconstruction Engineering Dustin Draper
36 Uland St Rose St Railroad Ave 04/25/22 08/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
37 Windsor Or Fireside Ln Bonnie Brae St 06/06/22 08/26/22 Utility installations and Engineering Scott Fettig
pavement replacement.
38 Wood St McKinney St Hickory St 04/11/22 06/30/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on June 17,2022 11:02:18 AM CDT Page 2 of 2
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection From Date Description Department Department Contact
1 Box Wood Smoke Tree Cul V Sac 05/23/22 06/16/22 Concrete Panel Repair Streets Roy San Miguel
Bryan St Scripture 228 Bryan St 06/06/22 06/07/22 Closing Bryan Street June 6 Public Works Inspections Stephany Trammell
2 and 7 from 7:00 AM to 4:30 PM
to remove tower crane from
jobsite.
3 Chestnut St Welch St Bernard St 10/18/21 05/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
4 Foxcroft Circle Emerson Archer Trail 01/21/22 05/20/22 Street reconstruction Engineering Dustin Draper
5 Foxcroft Circle Northcrest Rd Old North 02/23/22 05/20/22 Street reconstruction Engineering Dustin Draper
6 Foxcroft Circle Archer Trail Northcrest Rd 04/25/22 06/03/22 Street reconstruction Engineering Dustin Draper
Hickory St Eastbound from Bonnie Brae Bonnie Brae 05/16/22 05/27/22 Southbound lanes on Bonnie Engineering Streets Traffic Robin Davis
Oak Street Split Brae at Hickory will be closed Water
for pavement replacement.
7 Traffic on Bonnie Brae will not
be affected. Through traffic will
be closed at Hickory Street from
the Split on Oak Street.
8 Long Rd Sherman Dr(428) Holy Springs Rd 05/16/22 06/16/22 Concrete Panel Repair Streets Roy San Miguel
g Mockingbird Ln Mingo Rd Stockton St 05/04/22 06/13/22 Sewer manhole installation and Public Works Inspections Armando Beltran
2 water taps.
10 Northwood Terrace Greenwood Dr Cherrywood Ln 03/07/22 05/20/22 Street reconstruction Engineering Dustin Draper
11 Wolftrap Dr Stuart Rd. Olympia Dr 04/04/22 05/27/22 Laying RCP across the street to Private Development Tucker Eller
connect to existing storm drain.
Exported on June 17,2022 11:03:32 AM CDT Page 1 of 1