2022/09/16 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Sep 19th - 25th
Street/Intersection From To Department Department Contact
1 Bonnie Brae St @ Ft Worth Dr RxR Crossing 09/25/22 09/27/22 Railroad Crossing
2 Clubhouse Dr(2600-2412) Mustang Or Sombrero Or 10/03/22 10/21/22 Panel Repair Streets Roy San Miguel
3 Crisoforo Dr Santos Dr Morin Dr 09/26/22 10/28/22 Sidewalk Repair Streets Roy San Miguel
4 Daughtry St @ Meadow St RxR Crossing 09/26/22 09/27/22 Railroad Crossing
5 Juno Ln Stuart Rd Yellowstone PI 10/03/22 10/07/22 Mill&Overlay Streets Jeremy Wilks
6 Mingo Rd @ Fishtrap Rd RxR Crossing 10/04/22 10/07/22 Railroad Crossing
7 Mockingbird Ln Stockton St Mingo Rd 09/19/22 10/14/22 Restore the paving leavouts Public Works Inspections Armano Beltran
8 Pertain St @ Mingo Rd RxR Crossing 10/04/22 10/07/22 Railroad Crossing
9 Prairie St @ Bell Ave RxR Crossing 09/27/22 10/05/22 Railroad Crossing
10 Rockhill Rd @ Rhoades Rd RxR Crossing 10/04/22 10/07/22 Railroad Crossing
11 Savage Or Hayes St Comer St 09/19/22 09/30/22 Mill&Overlay Streets Jeremy Wilks
12 Union Lake Rd Wind River Ln Valencia Ln 09/26/22 10/21/22 Sidewalk repair Streets Roy San Miguel
13 Vintage Blvd @ Ft Worth Dr RxR Crossing 09/25/22 09/27/22 Railroad Crossing
14 Wintercreek Dr(1212) Green Bend Or Beechwood Dr 10/03/22 10/21/22 Concrete Panel Repair Streets Roy San Miguel
Exported on September 16,2022 11:12:30 AM CDT
2 Street Closure Report: Current Closures smartsheet
• • • Datsure Start e
Datsure e
• Description Department Department
1 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 09/30/22 Utility installations and Engineering Scott Fettig
pavement replacement.
2 Ave H Prairie St Louise St 09/05/22 10/21/22 Street Reconstruction Engineering Dustin Draper
3 Barberry Ave Bay Ave Trumpet Vine 08/22/22 09/30/22 Sidewalk Repair Streets Roy San Miguel
4 Baytree Ave Hawthorn Dr Barberry Ave 08/22/22 09/30/22 Sidewalk Repair Streets Roy San Miguel
Bonnie Brae St Windsor Dr Carril Al Lago Dr 08/15/22 09/23/22 open cut for infrastructure Private Development Lee Thurmond
installation from westside
5 bonnie brae to east side of
bonnie brae including utility taps
in 2 phases
6 Bradshaw St Hickory St McKinney St 03/21/22 10/01/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Clover Ln Robinwood Ln Glenwood Ln 05/23/22 09/30/22 Wastewater Collections will be Wastewater Tiffany Sherrane
7 installing a new sewer main line
and services.
College Park Dr Peach St Fowler Dr 04/18/22 09/23/22 Water Distribution will be Water Tiffany Sherrane
8 installing a new water naim line
and services.
9 Colonial Dr Thunderbird Dr South Dead End 07/11/22 09/30/22 Utility installations and Engineering Scott Fettig
pavement replacement.
10 Crawford St Hickory St McKinney St 03/21/22 10/01/22 Utility installations and Engineering Scott Fettig
pavement replacement.
1. Forrestridge Dr El Paseo St Wellington Oaks Cir 07/19/22 09/23/22 Street Panels Repair Streets Roy San Miguel
Fowler Dr College Park Dr Peach St 04/18/22 09/23/22 Water Distribution will be Water Tiffany Sherrane
12 installing a new water main line
and services
13 Fulton St W Oak Grace Temple 09/07/22 11/18/22 Street Reconstruction Engineering Dustin Draper
14 Greenway Dr Thunderbird Dr South Dead End 07/11/22 09/30/22 Utility installations and Engineering Scott Fettig
pavement replacement.
15 Hayes St. Savage Dr. Cruise St. 09/15/22 09/20/22 Mill&Overlay Streets Jeremy Wilks
16 Hattie St Paisley St McKinney St 03/21/22 10/01/22 Utility installations and Engineering Scott Fettig
pavement replacement.
17 Hickory St Railroad Ave Exposition St 09/06/22 10/04/22 Demo on floor plan(private Public Works Inspections Armando Beltran
work)
18 Hickory St Exposition St Ruddell St 05/02/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
19 Hill Alley St Jackson St Martin St 06/06/22 10/28/22 Utility replacement and roadway Engineering Seth Garcia
reconstruction
20 Indian Paint Way Lakeview Blvd Hawthorn Dr 08/29/22 09/30/22 Concrete Panel Repair Streets Roy San Miguel
21 Jackson St Morse St Hill Alley St 06/06/22 10/28/22 Utility replacement and roadway Engineering Seth Garcia
reconstruction
Jim Christal Rd Western Blvd Masch Branch Rd 04/18/22 10/31/22 Exeter PH2.Installing Public Private Development Public Jeremiah Tillman-David
22 Water,Sewer,and Storm Works Inspections
Utilities
23 Johnson Ln John Paine Rd Lavon Ln 09/02/22 11/25/22 Storm Installation Private Development Public Jeremiah Tillman-David
Works Inspections
24 Juno Ln Stuart Rd Sheraton Rd 08/29/22 09/30/22 Curb&Gutter Repair Streets Roy San Miguel
Live Oak St Robinwood Ln Crestwood PI 05/23/22 09/30/22 Wastewater collections will be Wastewater Tiffany Sherrane
25 installing a new sewer main line
and services.
Livingston Dr Hickory Creek Rd Hemingway Dr 08/17/22 09/30/22 Pavement,sidewalk,valley Engineering Dustin Draper
gutter,and subgrade
26 stabilization on Livingston
where it ties into Hickory Creek
Rd.
Exported on September 16,2022 11:13:11 AM CDT
Intersection • To ,ate ate Closure ,Closure • Description Department Department
27 Mack PI Paisley St Lee Dr 08/22/22 09/30/22 Street Reconstruction Engineering Dustin Draper
28 Masch Branch Rd Lovers Ln Hampton Rd 06/24/22 09/30/22 Bridge collapse at 3288 N. Drainage Gabriel Rodriguez
Masch Branch Rd
29 McKinney St Crawford Rd Audra Ln 05/19/22 09/30/22 Utility installations and Engineering Scott Fettig
pavement replacement.
30 McKinney St Bell Ave Frame St 09/06/22 10/04/22 Inlets and approaches Public Works Inspections Armando Beltran
Mistywood Ln Sherwood St Robinwood Ln 05/23/22 09/30/22 Wastewater Collections will be Wastewater Tiffany Sherrane
31 installing a new sewer main line
and services.
32 Morse St Lakey St Jackson St 06/06/22 10/28/22 Utility replacement and roadway Engineering Seth Garcia
reconstruction
North Texas Blvd 1-35W Oak St 12/13/21 10/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.There
33 will be multiple phases of
closures.Will not be all at one
time.
34 North Texas Blvd Oak St Hickory St 06/10/22 10/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
35 Oak St Crawford St Wood St 04/04/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
36 Panhandle St Aileen St Malone St 08/24/22 10/07/22 Street Reconstruction Engineering Dustin Draper
37 Parkside Dr Windsor Dr Bowling Green St 05/31/22 10/07/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Peach St Locust St Palmer Dr 04/18/22 09/23/22 Water Distribution will be Water Tiffany Sherrane
38 installing a new water main line
and services.
39 Peach St Locust St Fowler Dr 07/18/22 09/30/22 Upgrading 15 Storm pipe to Drainage Gabriel Rodriguez
18"
40 Robertson St Bell Ave Morse St 08/15/22 10/31/22 Utility installations and Engineering Seth Garcia
pavement replacement.
Robinwood Ln Kayewwod Dr Emerson Ln 05/23/22 09/30/22 Wastewater Collections will be Wastewater Tiffany Sherrane
41 installing a new sewer main line
and services.
42 Rose St Paisley St Uland St 04/25/22 10/01/22 Pavement Replacement Engineering Scott Fettig
43 Stella St North Texas Blvd Bonnie Brae St 10/29/21 10/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
44 Uland St Rose St Railroad Ave 04/25/22 10/07/22 Utility installations and Engineering Scott Fettig
pavement replacement.
45 Western Blvd Jim Christal Rd Airport Rd 08/01/22 09/30/22 Paving(2)drive approaches Public Works Inspections Jeremiah Tillman-David
Western Blvd Jim Christal Airport Rd 09/06/22 09/30/22 Connecting to existing 8"SS Private Development Public Jeremiah Tillman-David
46 stub and running SS lateral to Works Inspections
property.
47 Windsor Or Fireside Ln Bonnie Brae St 06/06/22 10/01/22 Utility installations and Engineering Scott Fettig
pavement replacement.
48 Wood St McKinney St Hickory St 04/11/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on September 16,2022 11:13:11 AM CDT
3 Street Closure Report: Completed Closures smartsheet
Intersection • To Date
. •_ • D- • Department Department
1 Ave C 1-35 Frontage Rd Westdale Private Dr 08/29/22 08/30/22 Water tap on existing line Private Development Tucker Eller
2 Ave D Highland St Maple St 07/18/22 08/19/22 Street Reconstruction Engineering Dustin Draper
Bonnie Brae St Scripture St Panhandle St 08/15/22 08/24/22 Paving of the Northbound lanes Engineering Robin Davis
3 between Scripture&Panhandle
requires the lanes to be closed.
4 Collier St 1-35 Frontage Rd Westdale Private Dr 08/31/22 09/07/22 Water taps on existing line Private Development Tucker Eller
5 Cope St. Cruz St. Dixon Ln. 08/25/22 08/30/22 Mill&Overlay Streets Jeremy Wilks
6 Cruise St Fiste St Comer St 08/31/22 09/14/22 Mill&Overlay Streets Jeremy Wilks
7 Foxcroft Cir Old North Archer Trail 05/02/22 08/26/22 Street Reconstruction Engineering Dustin Draper
8 Harvard Dr Yale Dr Cul de sac 08/01/22 09/09/22 Curb and Sidewalk Repair Streets Roy San Miguel
Hickory St Bonnie Brae St Bonnie Brae St 08/22/22 08/27/22 Access from Bonnie Brae will Engineering Robin Davis
9 be closed while paving of the
remaining NB lanes occurs.
i
10 Hillcrest St Panhandle St Scripture St 05/10/22 09/09/22 Street Reconstruction Engineering Dustin Draper
11 Lipizzan Dr(2909) Paddock Way Lipizzan Ct 08/08/22 09/02/22 Concrete Panel Repair Streets Roy San Miguel
12 Marquette Dr(3608) Centenary Dr Cul de sac 06/27/22 08/19/22 ADA/Sidewalk Repair Streets Roy San Miguel
Mayhill Rd US380/University Dr Quail Creek Rd 08/22/22 09/02/22 Sanitary Sewer Inspections will Engineering Public Works Tracy L.Beck,PE,PMP
13 be performed requiring various Inspections Wastewater
lanes to be closed. The road
will remain open.
Oak St Bonnie Brae St Bonnie Brae St 08/15/22 08/23/22 Reconstruction of the Engineering Robin Davis
Northbound lanes of Bonnie
Brae require closing the Oak
and Bonnie Brae Intersection
15 Oak St Fulton St Fry St 08/26/22 09/06/22 Utility work in roadway Public Works Inspections Stephany Trammell
16 Ponder St Linden Broadway 08/10/22 09/09/22 Street Reconstruction Engineering Dustin Draper
17 Sycamore St Carroll Welch St 07/18/22 09/02/22 Street Reconstruction Engineering Dustin Draper
Various Streets 07/25/22 09/09/22 Annual street micro seal Streets Roy San Miguel
maintenance.Various streets.A
complete list of the streets
18 receiving treatment this year
can be found at
https://www.discussdenton.com/
street-operations
Exported on September 16,2022 11:13:27 AM CDT