Loading...
2022/08/19 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR August 22nd - 28th Street/Intersection Department Department Contact 1 Ave C 1-35 Frontage Road Westdale Private Drive 08/29/22 08/30/22 Water tap on existing line Private Development Tucker Eller 2 Collier Street 1-35 Frontage Road Westdale Private Drive 08/31/22 09/02/22 Water taps on existing line Private Development Tucker Eller 3 Hickory St Railroad Ave Exposition St 09/06/22 10/04/22 Demo on floor plan(private work) Public Works Inspections Armando Beltran 4 Indian Paint Way Lakeview Blvd Hawthorn Dr 08/29/22 09/30/22 Concrete Panel Repair Streets Roy San Miguel 5 Juno Ln Stuart Rd Sheraton Rd 08/29/22 09/30/22 Curb&Gutter Repair Streets Roy San Miguel 6 McKinney St Bell Ave Frame St 09/06/22 10/04/22 Inlets and approaches Public Works Inspections Armando Beltran Exported on August 19,2022 11:06:45 AM CDT 2 Street Closure Report: Current Closures smartsheet 11 1- 1� I Closure Start Closure End Street/Intersection From To Date Date Description Department Department Contact 1 Barberry Ave Baytree Ave Trumpet Vine 08/22/22 09/16/22 Sidewalk Repair Streets Roy San Miguel 2 Baytree Ave Hawthorn Dr Barberry Ave 08/22/22 09/16/22 Sidewalk Repair Streets Roy San Miguel Bonnie Brae St Scripture St Panhandle St 08/15/22 08/24/22 Paving of the Northbound lanes Engineering Robin Davis 3 between Scripture&Panhandle requires the lanes to be closed. Bonnie Brae St Windsor Dr Carril Al Lago Dr 08/15/22 09/16/22 open cut for infrastructure Private Development Lee Thurmond installation from westside 4 bonnie brae to east side of bonnie brae including utility taps in 2 phases 5 Bradshaw St Hickory St McKinney St 03/21/22 10/01/22 Utility installations and Engineering Scott Fettig pavement replacement. Clover Ln Robinwood Ln Glenwood Ln 05/23/22 09/19/22 Wastewater Collections will be Wastewater Tiffany Sherrane 6 installing a new sewer main line and services. College Park Dr Peach St Fowler Dr 04/18/22 09/02/22 Water Distribution will be Water Tiffany Sherrane 7 installing a new water naim line and services. 8 Crawford St Hickory St McKinney St 03/21/22 10/01/22 Utility installations and Engineering Scott Fettig pavement replacement. 9 Forrestridge Dr El Paseo St Wellington Oaks Cir 07/19/22 09/09/22 Street Panels Repair Streets Roy San Miguel Fowler Dr College Park Dr Peach St 04/18/22 09/02/22 Water Distribution will be Water Tiffany Sherrane 10 installing a new water main line and services 11 Foxcroft Circle Old North Archer Trail 05/02/22 08/26/22 Street Reconstruction Engineering Dustin Draper 12 Harvard Dr Yale Dr Cul de sac 08/01/22 08/26/22 Curb and Sidewalk Repair Streets Roy San Miguel 13 Hattie St Paisley St McKinney St 03/21/22 10/01/22 Utility installations and Engineering Scott Fettig pavement replacement. Hickory St Bonnie Brae St Bonnie Brae St 08/22/22 08/27/22 Access from Bonnie Brae will Engineering Robin Davis 14 be closed while paving of the remaining NB lanes occurs. 15 Hickory St Exposition St Ruddell St 05/02/22 08/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 16 Hill Alley St Jackson St Martin St 06/06/22 10/28/22 Utility replacement and roadway Engineering Seth Garcia reconstruction 17 Hillcrest St Panhandle Scripture 05/10/22 09/09/22 Street Reconstruction Engineering Dustin Draper 18 Jackson St Morse St Hill Alley St 06/06/22 10/28/22 Utility replacement and roadway Engineering Seth Garcia reconstruction Jim Christal Rd Western Blvd Masch Branch Rd 04/18/22 08/31/22 Exeter PH2.Installing Public Private Development Public Jeremiah Tillman-David 19 Water,Sewer,and Storm Works Inspections Utilities 20 Lipizzan Dr(2909) Paddock Way Lipizzan Ct 08/08/22 09/02/22 Concrete Panel Repair Streets Roy San Miguel Live Oak St Robinwood Ln Crestwood PI 05/23/22 09/19/22 Wastewater collections will be Wastewater Tiffany Sherrane 21 installing a new sewer main line and services. Livingston Dr Hickory Creek Rd Hemingway Dr 08/17/22 09/30/22 Pavement,sidewalk,valley Engineering Dustin Draper gutter,and subgrade 22 stabilization on Livingston where it ties into Hickory Creek Rd. 23 Mack PI Paisley St Lee Dr 08/22/22 09/30/22 Street Reconstruction Engineering Dustin Draper 24 Masch Branch Rd Lovers Ln Hampton Rd 06/24/22 09/30/22 Bridge collapse at 3288 N. Drainage Gabriel Rodriguez Masch Branch Rd Exported on August 19,2022 11:58:43 AM CDT Street/Intersection From To Closure Start Description Department Department Contact Date Mayhill Rd US380/University Dr Quail Creek Rd 08/22/22 09/09/22 Sanitary Sewer Inspections will Engineering Public Works Tracy L.Beck,PE,PMP 25 be performed requiring various Inspections Wastewater lanes to be closed. The road will remain open. 26 McKinney St Crawford Rd Audra Ln 05/19/22 09/30/22 Utility installations and Engineering Scott Fettig pavement replacement. Mistywood Ln Sherwood St Robinwood Ln 05/23/22 09/19/22 Wastewater Collections will be Wastewater Tiffany Sherrane 27 installing a new sewer main line and services. 28 Morse St Lakey St Jackson St 06/06/22 10/28/22 Utility replacement and roadway Engineering Seth Garcia reconstruction North Texas Blvd 1-35W Oak St 12/13/21 09/01/22 Utility installations and Engineering Scott Fettig pavement replacement.There 29 will be multiple phases of closures.Will not be all at one time. 30 North Texas Blvd Oak St Hickory St 06/10/22 08/31/22 Utility installations and Engineering Scott Fettig pavement replacement. Oak St Bonnie Brae St Bonnie Brae St 08/15/22 08/23/22 Reconstruction of the Engineering Robin Davis 31 Northbound lanes of Bonnie Brae require closing the Oak and Bonnie Brae Intersection 32 Oak St Crawford St Wood St 04/04/22 08/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 33 Oak St Fulton St Fry St 08/26/22 09/09/22 Utility work in roadway Public Works Inspections Stephany Trammell 34 Panhandle St Aileen St Malone St 08/24/22 10/07/22 Street Reconstruction Engineering Dustin Draper 35 Parkside Or Windsor Dr Bowling Green St 05/31/22 09/02/22 Utility installations and Engineering Scott Fettig pavement replacement. Peach St Locust St Palmer Dr 04/18/22 09/02/22 Water Distribution will be Water Tiffany Sherrane 36 installing a new water main line and services. 37 Peach St Locust St Fowler Dr 07/18/22 09/30/22 Upgrading 15"Storm pipe to Drainage Gabriel Rodriguez 18" 38 Ponder St Linden Broadway 08/10/22 09/09/22 Street Reconstruction Engineering Dustin Draper 39 Robertson St Bell Ave Morse St 08/15/22 10/31/22 Utility installations and Engineering Seth Garcia pavement replacement. Robinwood Ln Kayewwod Dr Emerson Ln 05/23/22 09/19/22 Wastewater Collections will be Wastewater Tiffany Sherrane 40 installing a new sewer main line and services. 41 Rose St Paisley St Uland St 04/25/22 08/31/22 Pavement Replacement Engineering Scott Fettig 42 Stella St North Texas Blvd Bonnie Brae St 10/29/21 08/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 43 Sycamore St Carroll Welch St 07/18/22 09/02/22 Street Reconstruction Engineering Dustin Draper 44 Uland St Rose St Railroad Ave 04/25/22 08/31/22 Utility installations and Engineering Scott Fettig pavement replacement. Various Streets 07/25/22 09/02/22 Annual street micro seal Streets Roy San Miguel 45 maintenance.Various streets. https://www.discussdenton.com/ s ree-opera ions 46 Western Blvd Jim Christal Rd Airport Rd 08/01/22 09/30/22 Paving(2)drive approaches Public Works Inspections Jeremiah Tillman-David 47 Windsor Or Fireside Ln Bonnie Brae St 06/06/22 10/01/22 Utility installations and Engineering Scott Fettig pavement replacement. 48 Wood St McKinney St Hickory St 04/11/22 08/31/22 Utility installations and Engineering Scott Fettig pavement replacement. Exported on August 19,2022 11:58:43 AM CDT 3 Street Closure Report: Completed Closures smartsheet I I Closure Start Closure End I Street/Intersection From To Date Date Description Department Department Contact 1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae St 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David Venue Grade on Allred Works Inspections Atlas Dr Hercules Ln Juno Ln 06/06/22 07/29/22 Replacing gas service lines, Atmos Public Works Ryan Dromgoole open trench,from new main. Inspections 2 Sections of the Road will be closed from 8am-5pm Monday through Friday.Detour routes will be posted. 3 Ave D Highland St Maple St 07/18/22 08/05/22 Street Reconstruction Engineering Dustin Draper 4 Ave D Highland Maple 07/18/22 08/19/22 Street Reconstruction Engineering Dustin Draper 5 Bell Ave Texas St Mingo Rd 05/16/22 08/04/22 6 in.Asphalt Mill and Overlay/ Streets Roy San Miguel will be split in 3 Sections 6 Foxcroft Cir Old North Rd Archer Trl 05/02/22 08/05/22 Street Reconstruction Engineering Dustin Draper 7 Fry St Oak St Scripture St 05/10/22 08/12/22 Drive Approaches/Sidewalk/ Private Development Public Gabrielle Milani Water and Sanitary Sewer Works Inspections 8 Hillcrest St Panhandle St Scripture St 05/10/22 07/29/22 Street Reconstruction Engineering Dustin Draper 9 Linden Dr Malone St Gober St 07/19/22 08/11/22 Curb and Gutter/Valley Gutter Streets Roy San Miguel Repair 10 Mack Dr Paisley St Double Oak St 06/27/22 08/04/22 Street Reconstruction Engineering Dustin Draper 11 Marquette Dr(3608) Centenary Dr Cul de sac 06/27/22 08/19/22 ADA/Sidewalk Repair Streets Roy San Miguel 12 McKinney St Bell St Frame St 07/18/22 08/01/22 Working on drainage and Public Works Inspections Armando Beltran construction of Frame St. 13 St James PI Wheeler Ridge Dr Thoroughbred Trl 06/27/22 08/03/22 Concrete Panel and Sidewalk Streets Roy San Miguel Repair 14 Sycamore St Bernard St Carroll Blvd 05/17/22 07/29/22 Street Reconstruction Engineering Dustin Draper Exported on August 19,2022 11:58:52 AM CDT