Loading...
2022/09/02 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Sep 5th - 11 th Street/Intersection 9. - Department Department Contact 1 7 Mockingbird Ln Stockton St Mingo Rd 09/19/22 10/14/22 Restore the paving leavouts Public Works Inspections Armano Beltran Exported on September 2,2022 11:51:15 AM CDT 2 Street Closure Report: Current Closures smartsheet C Closure tart Closure End Description Department Department Contact Street/Intersecti low I Date Date 1 Augusta Dr Colonial Dr 2900 Augusta Dr 07/11/22 09/30/22 Utility installations and Engineering Scott Fettig pavement replacement. 2 Ave H Prairie St Louise St 09/05/22 10/21/22 Street Reconstruction Engineering Dustin Draper 3 Barberry Ave Bay Ave Trumpet Vine 08/22/22 09116/22 Sidewalk Repair Streets Roy San Miguel 4 Baytree Ave Hawthorn Dr Barberry Ave 08/22/22 09/16/22 Sidewalk Repair Streets Roy San Miguel Bonnie Brae St Windsor Dr Carril Al Lago Dr 08/15/22 09/16/22 open cut for infrastructure Private Development Lee Thurmond installation from westside 5 bonnie brae to east side of bonnie brae including utility taps in 2 phases 6 Bradshaw St Hickory St McKinney St 03/21/22 10/01/22 Utility installations and Engineering Scott Fettig pavement replacement. Clover Ln Robinwood Ln Glenwood Ln 05/23/22 09/30/22 Wastewater Collections will be Wastewater Tiffany Sherrane 7 installing a new sewer main line and services. College Park Dr Peach St Fowler Dr 04/18/22 09/23/22 Water Distribution will be Water Tiffany Sherrane 8 installing a new water naim line and services. 9 Collier St 1-35 Frontage Rd Westdale Private Dr 08/31/22 09/02/22 Water taps on existing line Private Development Tucker Eller 10 Colonial Dr Thunderbird Dr South Dead End 07/11/22 09/30/22 Utility installations and Engineering Scott Fettig pavement replacement. 11 Crawford St Hickory St McKinney St 03/21/22 10/01/22 Utility installations and Engineering Scott Fettig pavement replacement. 12 Cruise St Fiste St Comer St 08/31/22 09/16/22 Mill&Overlay Streets Jeremy Wilks 13 Forrestridge Dr El Paseo St Wellington Oaks Cir 07/19/22 09/09/22 Street Panels Repair Streets Roy San Miguel Fowler Dr College Park Dr Peach St 04/18/22 09/23/22 Water Distribution will be Water Tiffany Sherrane 14 installing a new water main line and services 15 Fulton St W Oak Grace Temple 09/07/22 11/18/22 Street Reconstruction Engineering Dustin Draper 16 Greenway Dr Thunderbird Dr South Dead End 07/11/22 09/30/22 Utility installations and Engineering Scott Fettig pavement replacement. 17 Harvard Dr Yale Dr Cul de sac 08/01/22 09/09/22 Curb and Sidewalk Repair Streets Roy San Miguel 18 Hettie St Paisley St McKinney St 03/21/22 10/01/22 Utility installations and Engineering Scott Fettig pavement replacement. 19 Hickory St Railroad Ave Exposition St 09/06/22 10/04/22 Demo on floor plan(private Public Works Inspections Armando Beltran work) 20 Hickory St Exposition St Ruddell St 05/02/22 12/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 21 Hill Alley St Jackson St Martin St 06/06/22 10/28/22 Utility replacement and roadway Engineering Seth Garcia reconstruction 22 Hillcrest St Panhandle St Scripture St 05/10/22 09/09/22 Street Reconstruction Engineering Dustin Draper 23 Indian Paint Way Lakeview Blvd Hawthorn Dr 08/29/22 09/30/22 Concrete Panel Repair Streets Roy San Miguel 24 Jackson St Morse St Hill Alley St 06/06/22 10/28/22 Utility replacement and roadway Engineering Seth Garcia reconstruction Jim Christal Rd Western Blvd Masch Branch Rd 04/18/22 10/31/22 Exeter PH2.Installing Public Private Development Public Jeremiah Tillman-David 25 Water,Sewer,and Storm Works Inspections Utilities 26 Juno Ln Stuart Rd Sheraton Rd 08/29/22 09/30/22 Curb&Gutter Repair Streets Roy San Miguel Live Oak St Robinwood Ln Crestwood PI 05/23/22 09/30/22 Wastewater collections will be Wastewater Tiffany Sherrane 27 installing a new sewer main line and services. Exported on September 2,2022 11:51:25 AM CDT Intersection • To ,ate Closure , • • Description Department Department Livingston Dr Hickory Creek Rd Hemingway Dr 08/17/22 09/30/22 Pavement,sidewalk,valley Engineering Dustin Draper gutter,and subgrade 28 stabilization on Livingston where it ties into Hickory Creek Rd. 29 Mack PI Paisley St Lee Dr 08/22/22 09/30/22 Street Reconstruction Engineering Dustin Draper 30 Masch Branch Rd Lovers Ln Hampton Rd 06/24/22 09/30/22 Bridge collapse at 3288 N. Drainage Gabriel Rodriguez Masch Branch Rd Mayhill Rd US380/University Dr Quail Creek Rd 08/22/22 09/09/22 Sanitary Sewer Inspections will Engineering Public Works Tracy L.Beck,PE,PMP 31 be performed requiring various Inspections Wastewater lanes to be closed. The road will remain open. 32 McKinney St Crawford Rd Audra Ln 05/19/22 09/30/22 Utility installations and Engineering Scott Fettig pavement replacement. 33 McKinney St Bell Ave Frame St 09/06/22 10/04/22 Inlets and approaches Public Works Inspections Armando Beltran Mistywood Ln Sherwood St Robinwood Ln 05/23/22 09/30/22 Wastewater Collections will be Wastewater Tiffany Sherrane 34 installing a new sewer main line and services. 35 Morse St Lakey St Jackson St 06/06/22 10/28/22 Utility replacement and roadway Engineering Seth Garcia reconstruction North Texas Blvd I-35W Oak St 12/13/21 10/31/22 Utility installations and Engineering Scott Fettig pavement replacement.There 36 will be multiple phases of closures.Will not be all at one time. 37 North Texas Blvd Oak St Hickory St 06/10/22 10/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 38 Oak St Fulton St Fry St 08/26/22 09/09/22 Utility work in roadway Public Works Inspections Stephany Trammell 39 Oak St Crawford St Wood St 04/04/22 12/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 40 Panhandle St Aileen St Malone St 08/24/22 10/07/22 Street Reconstruction Engineering Dustin Draper 41 Parkside Dr Windsor Dr Bowling Green St 05/31/22 10/07/22 Utility installations and Engineering Scott Fettig pavement replacement. Peach St Locust St Palmer Dr 04/18/22 09/23/22 Water Distribution will be Water Tiffany Sherrane 42 installing a new water main line and services. 43 Peach St Locust St Fowler Dr 07/18/22 09/30/22 Upgrading 15 Storm pipe to Drainage Gabriel Rodriguez 181, 44 Ponder St Linden Broadway 08/10/22 09/09/22 Street Reconstruction Engineering Dustin Draper 45 Robertson St Bell Ave Morse St 08/15/22 10/31/22 Utility installations and Engineering Seth Garcia pavement replacement. Robinwood Ln Kayewwod Dr Emerson Ln 05/23/22 09/30/22 Wastewater Collections will be Wastewater Tiffany Sherrane 46 installing a new sewer main line and services. 47 Rose St Paisley St Uland St 04/25/22 10/01/22 Pavement Replacement Engineering Scott Fettig 48 Stella St North Texas Blvd Bonnie Brae St 10/29/21 10/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 49 Uland St Rose St Railroad Ave 04/25/22 10/07/22 Utility installations and Engineering Scott Fettig pavement replacement. Various Streets 07/25/22 09/09/22 Annual street micro seal Streets Roy San Miguel maintenance.Various streets.A complete list of the streets 50 receiving treatment this year can be found at https://www.discussdenton.com/ street-operations 51 Western Blvd Jim Christal Rd Airport Rd 08/01/22 09/30/22 Paving(2)drive approaches Public Works Inspections Jeremiah Tillman-David Exported on September 2,2022 11:51:25 AM CDT Intersection • To , • , • • Description -p Department Contact ate Western Blvd Jim Christal Airport Rd 09/06/22 09/30/22 Connecting to existing 8"SS Private Development Public Jeremiah Tillman-David 52 stub and running SS lateral to Works Inspections property. 53 Windsor Dr Fireside Ln Bonnie Brae St 06/06/22 10/01/22 Utility installations and Engineering Scott Fettig pavement replacement. 54 Wood St McKinney St Hickory St 04/11/22 12/31/22 Utility installations and Engineering Scott Fettig pavement replacement. Exported on September 2,2022 11:51:25 AM CDT 3 Street Closure Report: Completed Closures smartsheet Intersection • To Date . •_ • D- • Department Department 1 Ave C 1-35 Frontage Rd Westdale Private Dr 08/29/22 08/30/22 Water tap on existing line I Private Development Tucker Eller 2 Ave D Highland St Maple St 07/18/22 08/05/22 Street Reconstruction Engineering Dustin Draper 3 Ave D Highland St Maple St 07/18/22 08/19/22 Street Reconstruction Engineering Dustin Draper 4 Bell Ave Texas St Mingo Rd 05/16/22 08/04/22 6 in.Asphalt Mill and Overlay/ Streets Roy San Miguel will be split in 3 Sections Bonnie Brae St Scripture St Panhandle St 08/15/22 08/24/22 Paving of the Northbound lanes Engineering Robin Davis 5 between Scripture&Panhandle requires the lanes to be closed. 6 Cope St. Cruz St. Dixon Ln. 08/25/22 08/30/22 Mill&Overlay Streets Jeremy Wilks 7 Foxcroft Cir Old North Rd Archer Trl 05/02/22 08/05/22 Street Reconstruction Engineering Dustin Draper 8 Foxcroft Cir Old North Archer Trail 05/02/22 08/26/22 Street Reconstruction Engineering Dustin Draper 9 Fry St Oak St Scripture St 05/10/22 08/12/22 Drive Approaches/Sidewalk/ Private Development Public Gabrielle Milam Water and Sanitary Sewer Works Inspections Hickory St Bonnie Brae St Bonnie Brae St 08/22/22 08/27/22 Access from Bonnie Brae will Engineering Robin Davis 10 be closed while paving of the remaining NB lanes occurs. 11 Linden Dr Malone St Gober St 07/19/22 08/11/22 Curb and Gutter/Valley Gutter Streets Roy San Miguel Repair 12 Lipizzan Dr(2909) Paddock Way Lipizzan Ct 08/08/22 09/02/22 Concrete Panel Repair Streets Roy San Miguel 13 Mack Dr Paisley St Double Oak St 06/27/22 08/04/22 Street Reconstruction Engineering Dustin Draper 14 Marquette Dr(3608) Centenary Dr Cul de sac 06/27/22 08/19/22 ADA/Sidewalk Repair Streets Roy San Miguel Oak St Bonnie Brae St Bonnie Brae St 08/15/22 08/23/22 Reconstruction of the Engineering Robin Davis 15 Northbound lanes of Bonnie Brae require closing the Oak and Bonnie Brae Intersection 16 St James PI Wheeler Ridge Dr Thoroughbred Trl 06/27/22 08/03/22 Concrete Panel and Sidewalk Streets Roy San Miguel Repair 17 Sycamore St Carroll Welch St 07/18/22 09/02/22 Street Reconstruction Engineering Dustin Draper Exported on September 2,2022 11:51:32 AM CDT