2022/10/28 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Oct 31 st - Nov 6th
Street/Intersedion � '_ � '_ a . . .. Department
1 Park Access Rd(Off Bonnie Brae) Windsor Dr Riney Rd 11/15/22 07/31/23 Urbana Bonnie Brae Project:Water,Sewer, Private Development Public Jeremiah Tillman-David
Storm,Paving. Works Inspections
Exported on October 28,2022 11:01:50 AM CDT Page 1 of 1
2 Street Closure Report: Current Closures smartsheet
Closure Start Closure End Department Department Contact
To Date Date
Street/Intersection Fro, Description
1 Atlas Dr Hercules Ln Redstone Rd 10/17/22 02/10/23 Reconstruct Streets Jeremy Wilks
2 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
3 Ave A Greenlee Ave A 10/25/22 12/16/22 Street Reconstruction Engineering Dustin Draper
4 Ave B Underwood Margie St 10/05/22 11/25/22 Street Reconstruction Engineering Dustin Draper
5 Ave H Prairie St Louise St 09/05/22 11/11/22 Street Reconstruction Engineering Dustin Draper
6 Blackberry Way Thistle HL Thistle Way 10/10/22 11/11/22 French Drain system project Drainage Gabriel Rodriguez
7 Bradshaw St Hickory St McKinney St 03/21/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
8 Brook Hollow Dr Greenway Dr Carriage Hill 10/07/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
9 Camino Real Edwards Pockus Page 10/31/22 12/09/22 Street Panel Repair Streets Roy San Miguel
10 Clear River Ln Montecito Dr Rambling Brook Trl 10/24/22 11/23/22 Sidewalk Repair Streets Roy San Miguel
11 Colonial Dr Thunderbird Dr South Dead End 07/11/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
12 Cook St Robertson St Wye St 10/24/22 02/03/23 Utility installation and roadway Engineering Seth Garcia
reconstruction
13 Crawford St Hickory St McKinney St 03/21/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
14 Crescent St Fulton St Alice St 09/27/22 11/18/22 Street Reconstruction Engineering Dustin Draper
15 Fairway Dr Clubview Dr Links Dr 10/17/22 11/04/22 Sidewalk Repair Streets Roy San Miguel
16 Fulton St Grace Temple Ave Congress St 10/04/22 11/18/22 Street Reconstruction Engineering Dustin Draper
17 Fulton St Oak St Grace Temple Ave 09/07/22 11/18/22 Street Reconstruction Engineering Dustin Draper
18 Greenway Dr Thunderbird Dr South Dead End 07/11/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
19 Greenway Dr Thunderbird Dr. Windsor Farms Dr 10/07/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
20 Hettie St Paisley St McKinney St 03/21/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
21 Hickory St Exposition St Ruddell St 05/02/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
22 Hill Alley St Jackson St Martin St 06/06/22 11/18/22 Utility replacement and roadway Engineering Seth Garcia
reconstruction
23 Hinkley Oaks Dr Barrydale Dr Hinkley Oaks(7612) 10/10/22 11/18/22 Concrete Panel and sidewalk Streets Roy San Miguel
repair
24 Jackson St Morse St Hill Alley St 06/06/22 11/18/22 Utility replacement and roadway Engineering Seth Garcia
reconstruction
25 Jim Christal Rd Western Blvd Masch Branch Rd 04/18/22 12/30/22 Exeter PH2:Paving Jim Christal Private Development Public Kirk Winter
Works Inspections
26 Johnson Rd John Paine Rd Lavon Ln 09/02/22 11/25/22 Chris Harp performing Lime Private Development Public Jeremiah Tillman-David
Stabilization for Johnson Rd Works Inspections
27 Lakewood Dr Greenway Dr Carriage Hill 10/07/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
28 Lonesome Trail Bareback Ln English Saddle Ln 10/24/22 11/18/22 Sidewalk Repair Streets Roy San Miguel
29 Masch Branch Rd Lovers Ln Hampton Rd 06/24/22 12/31/22 Bridge collapse at 3288 N. Drainage Gabriel Rodriguez
Masch Branch Rd
30 McKinney St Bell Ave Frame St 10/10/22 10/31/22 Inlets and approaches Public Works Inspections Armando Beltran
31 McKinney St Bell Ave Frame St 10/10/22 11/25/22 Restructuring the entrance to Public Works Inspections Armando Beltran
Frame St.
32 McKinney St Crawford Rd Audra Ln 05/19/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on October 28,2022 11:05:19 AM CDT Page 1 of 2
Intersection
• To ,ate Closure • • Description Department Department
33 Montecito Dr Ryan Rd Dead end 10/10/22 11/11/22 Mill Overlay Engineering Seth Garcia
34 Morse St Lakey St Jackson St 06/06/22 11/18/22 Utility replacement and roadway Engineering Seth Garcia
reconstruction
North Texas Blvd 1-35W Oak St 12/13/21 12/30/22 Utility installations and Engineering Scott Fettig
pavement replacement.There
35 will be multiple phases of
closures.Will not be all at one
time.
36 North Texas Blvd Oak St Hickory St 06/10/22 12/30/22 Utility installations and Engineering Scott Fettig
pavement replacement.
37 Nottingham Dr Churchill Dr Devonshire Ct 10/17/22 11/04/22 Valley Gutter and Curb Repair Streets Roy San Miguel
38 Oak St Miller St North Texas Blvd 09/30/22 11/04/22 Utility installations and Engineering Scott Fettig
pavement replacement.
39 Oak St Crawford St Wood St 04/04/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
40 Oceanview Dr Marina Dr Intersection 10/24/22 11/11/22 Concrete Panel repair Streets Roy San Miguel
41 Panhandle St Aileen St Malone St 08/24/22 11/11/22 Street Reconstruction Engineering Dustin Draper
42 Parkside Dr Windsor Dr Bowling Green St 05/31/22 11/18/22 Utility installations and Engineering Scott Fettig
pavement replacement.
43 Peach St Locust St Fowler Dr 07/18/22 11/18/22 Upgrading 15'Storm pipe to Drainage Gabriel Rodriguez
18"
44 Robertson St Bell Ave Morse St 08/15/22 12/16/22 Utility installations and Engineering Seth Garcia
pavement replacement.
45 Rose St Paisley St Uland St 04/25/22 11/30/22 Pavement Replacement Engineering Scott Fettig
46 Seven Oaks Ln Rambling Brook Trl Serenity Way 10/17/22 11/04/22 Street panels and Sidewalk Streets Roy San Miguel
repair
47 Stella St North Texas Blvd Bonnie Brae St 10/29/21 12/30/22 Utility installations and Engineering Scott Fettig
pavement replacement.
48 Uland St Rose St Railroad Ave 04/25/22 12/30/22 Utility installations and Engineering Scott Fettig
pavement replacement.
49 Western Blvd Jim Christal Rd Airport Rd 08/01/22 11/30/22 Paving(2)drive approaches Private Development Public Kirk Winter
Works Inspections
50 Western Blvd University(380) Airport Rd 09/19/22 11/30/22 Western Blvd Paving Decal Private Development Public Jeremiah Tillman-David
Lanes Works Inspections
51 Windsor Dr Fireside Ln Bonnie Brae St 06/06/22 11/30/22 Utility installations and Engineering Scott Fettig
pavement replacement.
52 Wood St McKinney St Hickory St 04/11/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on October 28,2022 11:05:19 AM CDT Page 2 of 2
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection From Closure Start Closure End Description
Date Date Department I Department Contact
1 Barberry Ave Baytree Ave Trumpet Vine 08/22/22 09/30/22 Sidewalk Repair Streets Roy San Miguel
2 Baytree Ave Hawthorn Dr Barberry Ave 08/22/22 09/30/22 Sidewalk Repair Streets Roy San Miguel
3 Bonnie Brae St @ Ft Worth Dr RxR Crossing 10/06/22 10/08/22 Railroad Crossing
Bonnie Brae St Windsor Dr Carril Al Lego Dr 08/15/22 10/26/22 open cut for infrastructure Private Development Lee Thurmond
installation from westside
4 bonnie brae to east side of
bonnie brae including utility taps
in 2 phases
Clover Ln Robinwood Ln Glenwood Ln 05/23/22 10/28/22 Wastewater Collections will be Wastewater Tiffany Sherrane
5 installing a new sewer main line
and services.
6 Clubhouse Dr(2600-2412) Mustang Dr Sombrero Dr 10/03/22 10/18/22 Panel Repair Streets Roy San Miguel
College Park Dr Peach St Fowler Dr 04/18/22 10/28/22 Water Distribution will be Water Tiffany Sherrane
7 installing a new water naim line
and services.
8 Crisoforo Dr Santos Dr Morin Dr 09/26/22 10/25/22 Sidewalk Repair Streets Roy San Miguel
9 Daughtry St @ Meadow St RxR Crossing 10/07/22 10/09/22 Railroad Crossing
10 Forrestridge Dr El Paseo St Wellington Oaks Cir 07/19/22 10/06/22 Street Panels Repair Streets Roy San Miguel
Fowler Dr College Park Dr Peach St 04/18/22 10/28/22 Water Distribution will be Water Tiffany Sherrane
11 installing a new water main line
and services
Hickory St Bell Ave Railroad Ave 10/03/22 10/07/22 Concrete street panel Atmos Zabdiel Mota
12 repair/replacement for east
bound lanes.
13 Hickory St Railroad Ave Exposition St 09/06/22 10/14/22 Demo on floor plan(private Public Works Inspections Armando Beltran
work)
Hickory St Bell Ave Railroad Ave 10/10/22 10/14/22 Concrete street panel Zabdiel Mota
14 repair/replacement for east
bound lanes.
15 Juno Ln Stuart Rd Sheraton Rd 08/29/22 09/30/22 Curb&Gutter Repair Streets Roy San Miguel
16 Juno Ln Stuart Rd Yellowstone PI 10/03/22 10/07/22 Mill&Overlay Streets Jeremy Wilks
Live Oak St Robinwood Ln Crestwood PI 05/23/22 10/28/22 Wastewater collections will be Wastewater Tiffany Sherrane
17 installing a new sewer main line
and services.
Livingston Dr Hickory Creek Rd Hemingway Dr 08/17/22 09/30/22 Pavement,sidewalk,valley Engineering Dustin Draper
gutter,and subgrade
18 stabilization on Livingston
where it ties into Hickory Creek
Rd.
19 Mack PI Paisley St Lee Dr 08/22/22 10/14/22 Street Reconstruction Engineering Dustin Draper
20 Mayhill Rd Spencer Rd Morse St 09/23/22 09/30/22 Emergency closure for gas line
repairs
Mayhill Rd US 380/University Rd Quail Creek Rd 09/27/22 10/03/22 Sanitary Sewer Inspections will Engineering Wastewater Tracy L.Beck,PE,PMP
21 be performed requiring various
lanes to be closed. The road
will remain open.
McKinney St Elm St Locust St 10/17/22 10/21/22 Wastewater Collections will be Wastewater Tiffany Sherrane
22 replacing a sanitary sewer
manhole and wastewater main
line.
23 Mingo Rd @ Fishtrap Rd RxR Crossing 1 10/04/22 1 10/07/22 1 Railroad Crossing
Mistywood Ln Sherwood St Robinwood Ln 05/23/22 10/28/22 Wastewater Collections will be Wastewater Tiffany Sherrane
24 installing a new sewer main line
and services.
Exported on October 28,2022 11:05:34 AM CDT Page 1 of 2
Street/Intersection 0 Closure Start Closure End Description Department Department Contact
L or— �T Date Date
25 Mockingbird Ln Stockton St Mingo Rd 09/19/22 11114/22 Restore the paving leavouts Public Works Inspections Armano Beltran
Peach St Locust St Palmer Dr 04/18/22 10/28/22 Water Distribution will be Water Tiffany Sherrane
26 installing a new water main line
and services.
27 Pertain St @ Mingo Rd RxR Crossing 10/08/22 10/09/22 Railroad Crossing
28 Prairie St @ Bell Ave RxR Crossing 10/08/22 10/09/22 Railroad Crossing
Robinwood Ln Kayewwod Dr Emerson Ln 05/23/22 10/28/22 Wastewater Collections will be Wastewater Tiffany Sherrane
29 installing a new sewer main line
and services.
30 Rockhill Rd @ Rhoades Rd RxR Crossing 10/04/22 10/07/22 Railroad Crossing
Ruddell St Ruddell St N(1526) Ruddell St N(1528) 10/26/22 10/28/22 Wastewater Collections will be Wastewater Tiffany Sherrane
31 replacing two wastewater
service lines.
32 Savage Dr Hayes St Comer St 09/29/22 09/30/22 Mill&Overlay Streets Jeremy Wilks
33 Union Lake Rd Wind River Ln Valencia Ln 09/26/22 10/06/22 Sidewalk repair Streets Roy San Miguel
34 Vintage Blvd @ Ft Worth Dr RxR Crossing 10/08/22 10/09/22 Railroad Crossing
35 Windsor Dr Longfellow Ln Wilsonwood Dr 10/04/22 10/14/22 Sidewalk repair Engineering Dustin Draper
36 Wintercreek Dr(1212) Green Bend Dr Beachwood Dr 10/03/22 10/18/22 Concrete Panel Repair Streets Roy San Miguel
Exported on October 28,2022 11:05:34 AM CDT Page 2 of 2