2022/10/14 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Oct 17th - 23rd
Street/Intersection From . . . .. Department
1 Brook Hollow St Westview Trail Crestmeadow St 10/24/22 11/04/22 Mill&Overlay Streets Jeremy Wilks
2 Camino Real Edwards Pockus Page 10/31/22 12/09/22 Street Panel Repair Streets Roy San Miguel
3 Clear River Ln Montecito Dr Rambling Brook Trl 10/24/22 11/23/22 Sidewalk Repair Streets Roy San Miguel
4 Gardenview St Evers Pkwy Brooke St 11/07/22 11/18/22 Mill&Overlay Streets Jeremy Wilks
5 Lone Some Trail Bare Back English Saddle 10/24/22 11/18/22 Sidewalk Repair Streets Roy San Miguel
6 Oceanview or Marina or Intersection 10/24/22 11/11/22 Concrete Panel repair Streets Roy San Miguel
Ruddell St Ruddell St N(1526) Ruddell St N(1528) 10/26/22 10/28/22 Wastewater Collections will be replacing two Wastewater Tiffany Sherrane
wastewater service lines.
Exported on October 14,2022 12:13:35 PM CDT
2 Street Closure Report: Current Closures smartsheet
To Closure Start Closure End Description Department Department Contact
Street/Intersection Fro, 1W I Date Date
1 Atlas Dr. Hercules Ln. Redstone Rd. 10/17/22 02/10/23 Reconstruct Streets Jeremy Wilks
2 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
3 Ave B Underwood Margie St 10/05/22 11/19/22 Street Reconstruction Engineering Dustin Draper
4 Ave H Prairie St Louise St 09/05/22 10/21/22 Street Reconstruction Engineering Dustin Draper
5 Blackberry Way Thistle HL Thistle way 10/10/22 11/04/22 French Drain system project Drainage Gabriel Rodriguez
Bonnie Brae St Windsor Dr Carril Al Lago Dr 08/15/22 10/21/22 open cut for infrastructure Private Development Lee Thurmond
installation from westside
6 bonnie brae to east side of
bonnie brae including utility taps
in 2 phases
7 Bradshaw St Hickory St McKinney St 03/21/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
8 Brook Hollow Dr Carriage Hill Brooklake St 10/10/22 10/21/22 Mill&Overlay Streets Jeremy Wilks
9 Brook Hollow Dr Greenway Dr Carriage Hill 10/07/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
10 Clubhouse Dr(2600-2412) Mustang Dr Sombrero Dr 10/03/22 10/21/22 Panel Repair Streets Roy San Miguel
11 Colonial Dr Thunderbird Dr South Dead End 07/11/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
12 Crawford St Hickory St McKinney St 03/21/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
13 Crescent St Fulton St Alice St 09/27/22 11/04/22 Street Reconstruction Engineering Dustin Draper
14 Crisoforo Dr Santos Dr Morin Dr 09/26/22 10/28/22 Sidewalk Repair Streets Roy San Miguel
15 Fairway Dr Clubview Dr Links Dr 10/17/22 11/04/22 Sidewalk Repair Streets Roy San Miguel
16 Fulton Grace Temple Congress 10/04/22 11/18/22 Street Reconstruction Engineering Dustin Draper
17 Fulton St Oak St Grace Temple Ave 09/07/22 11/18/22 Street Reconstruction Engineering Dustin Draper
18 Greenway Dr Thunderbird Dr South Dead End 07/11/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
19 Greenway Dr Thunderbird Dr. Windsor Farms Dr 10/07/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
20 Hettie St Paisley St McKinney St 03/21/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
21 Hickory St Exposition St Ruddell St 05/02/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
22 Hill Alley St Jackson St Martin St 06/06/22 10/28/22 Utility replacement and roadway Engineering Seth Garcia
reconstruction
23 Hinkley Oaks Dr Banydale Dr Hinkley Oaks(7612) 10/10/22 11/18/22 Concrete Panel and sidewalk Streets Roy San Miguel
repair
24 Jackson St Morse St Hill Alley St 06/06/22 10/28/22 Utility replacement and roadway Engineering Seth Garcia
reconstruction
Jim Christal Rd Western Blvd Masch Branch Rd 04/18/22 10/31/22 Exeter PH2.Installing Public Private Development Public Jeremiah Tillman-David
25 Water,Sewer,and Storm Works Inspections
Utilities
26 Johnson Rd John Paine Rd Lavon Ln 09/02/22 11/25/22 Chris Harp performing Lime Private Development Public Jeremiah Tillman-David
Stabilization for Johnson Rd Works Inspections
27 Lakewood Dr Greenway Dr. Carriage Hill 10/07/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
28 Masch Branch Rd Lovers Ln Hampton Rd 06/24/22 12/31/22 Bridge collapse at 3288 N. Drainage Gabriel Rodriguez
Masch Branch Rd
McKinney St Elm St Locust St 10/17/22 10/21/22 Wastewater Collections will be Wastewater Tiffany Sherrane
29 replacing a sanitary sewer
manhole and wastewater main
line.
Exported on October 14,2022 12:13:46 PM CDT
Intersection
• To ,Closure • • Description -•. Department
ate
30 McKinney St Bell Ave Frame St 10/10/22 10/31/22 Inlets and approaches Public Works Inspections Armando Beltran
31 McKinney St Bell Ave Frame St 10/10/22 11/25/22 Restructuring the entrance to Public Works Inspections Armando Beltran
Frame St.
32 McKinney St Crawford Rd Audra Ln 05/19/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
33 Montecito Dr Ryan Rd Dead end 10/10/22 10/28/22 Mill Overlay Engineering Seth Garcia
34 Morse St Lakey St Jackson St 06/06/22 10/28/22 Utility replacement and roadway Engineering Seth Garcia
reconstruction
North Texas Blvd 1-35W Oak St 12/13/21 10/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.There
35 will be multiple phases of
closures.Will not be all at one
time.
36 North Texas Blvd Oak St Hickory St 06/10/22 10/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
37 Nottingham Dr Churchill Dr Devonshire Ct 10/17/22 11/04/22 Valley Gutter and Curb Repair Streets Roy San Miguel
38 Oak St Miller St North Texas Blvd 09/30/22 11/04/22 Utility installations and Engineering Scott Fettig
pavement replacement.
39 Oak St Crawford St Wood St 04/04/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
40 Panhandle St Aileen St Malone St 08/24/22 10/28/22 Street Reconstruction Engineering Dustin Draper
41 Parkside Or Windsor Or Bowling Green St 05/31/22 10/21/22 Utility installations and Engineering Scott Fettig
pavement replacement.
42 Peach St Locust St Fowler Dr 07/18/22 10/28/22 Upgrading 15"Storm pipe to Drainage Gabriel Rodriguez
18"
43 Robertson St Bell Ave Morse St 08/15/22 10/31/22 Utility installations and Engineering Seth Garcia
pavement replacement.
44 Rose St Paisley St Uland St 04/25/22 11/30/22 Pavement Replacement Engineering Scott Fettig
45 Seven Oaks Ln Rambling Brook Trl Serenity Way 10/17/22 11/04/22 Street panels and Sidewalk Streets Roy San Miguel
repair
46 Stella St North Texas Blvd Bonnie Brae St 10/29/21 10/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
47 Uland St Rose St Railroad Ave 04/25/22 11/01/22 Utility installations and Engineering Scott Fettig
pavement replacement.
48 Western Blvd Jim Christal Rd Airport Rd 08/01/22 10/31/22 Paving(2)drive approaches Public Works Inspections Jeremiah Tillman-David
Western Blvd Jim Christal Rd Airport Rd 09/06/22 10/31/22 Connecting to existing 8"SS Private Development Public Jeremiah Tillman-David
49 stub and running SS lateral to Works Inspections
property.
50 Western Blvd University(380) Airport Rd 09/19/22 11/30/22 Western Blvd Paving Private Development Public Jeremiah Tillman-David
Works Inspections
51 Windsor Or Fireside Ln Bonnie Brae St 06/06/22 11/30/22 Utility installations and Engineering Scott Fettig
pavement replacement.
52 Wintercreek Dr(1212) Green Bend Or Beechwood Dr 1 10/03/22 1 10/21/22 Concrete Panel Repair Streets Roy San Miguel
53 Wood St McKinney St Hickory St 04/11/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on October 14,2022 12:13:46 PM CDT
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection From Closure Start Closure End Description Departmentl I iDepartment Contact
Date Date
1 Barberry Ave Baytree Ave Trumpet Vine 08/22/22 09/30/22 Sidewalk Repair Streets Roy San Miguel
2 Baytree Ave Hawthorn Dr Barberry Ave 08/22/22 09/30/22 Sidewalk Repair Streets Roy San Miguel
3 Bonnie Brae St @ Ft Worth Dr RxR Crossing 10/06/22 10/08/22 Railroad Crossing
Clover Ln Robinwood Ln Glenwood Ln 05/23/22 10/14/22 Wastewater Collections will be Wastewater Tiffany Sherrane
4 installing a new sewer main line
and services.
College Park Dr Peach St Fowler Dr 04/18/22 10/07/22 Water Distribution will be Water Tiffany Sherrane
5 installing a new water naim line
and services.
6 Cruise St Fiste St Comer St 08/31/22 09/14/22 Mill&Overlay Streets Jeremy Wilks
7 Daughtry St @ Meadow St RxR Crossing 10/07/22 10/09/22 Railroad Crossing
8 Forrestridge Dr El Paseo St Wellington Oaks Cir 07/19/22 10/06/22 Street Panels Repair Streets Roy San Miguel
Fowler Dr College Park Dr Peach St 04/18/22 10/07/22 Water Distribution will be Water Tiffany Sherrane
9 installing a new water main line
and services
10 Hayes St Savage Dr Cruise St 09/15/22 09/20/22 Mill&Overlay Streets Jeremy Wilks
Hickory St Bell Ave Railroad Ave 10/03/22 10/07/22 Concrete street panel Atmos Zabdiel Mota
11 repair/replacement for east
bound lanes.
12 Hickory St Railroad Ave Exposition St 09/06/22 10/14/22 Demo on floor plan(private Public Works Inspections Armando Beltran
work)
Hickory St Bell Ave Railroad Ave 10/10/22 10/14/22 Concrete street panel Zabdiel Mota
13 repair/replacement for east
bound lanes.
14 Indian Paint Way Lakeview Blvd Hawthorn Dr 08/29/22 09/22/22 Concrete Panel Repair Streets Roy San Miguel
15 Juno Ln Stuart Rd Sheraton Rd 08/29/22 09/30/22 Curb&Gutter Repair Streets Roy San Miguel
16 Juno Ln Stuart Rd Yellowstone PI 10/03/22 10/07/22 Mill&Overlay Streets Jeremy Wilks
Live Oak St Robinwood Ln Crestwood PI 05/23/22 10/14/22 Wastewater collections will be Wastewater Tiffany Sherrane
17 installing a new sewer main line
and services.
Livingston Dr Hickory Creek Rd Hemingway Dr 08/17/22 09/30/22 Pavement,sidewalk,valley Engineering Dustin Draper
gutter,and subgrade
18 stabilization on Livingston
where it ties into Hickory Creek
Rd.
19 Mack PI Paisley St Lee Dr 08/22/22 10/14/22 Street Reconstruction Engineering Dustin Draper
20 Mayhill Rd Spencer Rd Morse St 09/23/22 09/30/22 Emergency closure for gas line
repairs
Mayhill Rd US 380/University Rd Quail Creek Rd 09/27/22 10/03/22 Sanitary Sewer Inspections will Engineering Wastewater Tracy L.Beck,PE,PMP
21 be performed requiring various
lanes to be closed. The road
will remain open.
22 Mingo Rd @ Fishtrap Rd RxR Crossing 10/04/22 10/07/22 Railroad Crossing
Mistywood Ln Sherwood St Robinwood Ln 05/23/22 10/14/22 Wastewater Collections will be Wastewater Tiffany Sherrane
23 installing a new sewer main line
and services.
24 Mockingbird Ln Stockton St Mingo Rd 09/19/22 10/14/22 Restore the paving leavouts Public Works Inspections Armano Beltran
Peach St Locust St Palmer Dr 04/18/22 10/07/22 Water Distribution will be Water Tiffany Sherrane
25 installing a new water main line
and services.
26 Pertain St @ Mingo Rd RxR Crossing 10/08/22 10/09/22 Railroad Crossing
27 Prairie St @ Bell Ave RxR Crossing 10/08/22 10/09/22 Railroad Crossing
Exported on October 14,2022 12:14:01 PM CDT
Street/Intersection From To Closure Start Closure End Description Department Department Contact
Date Date
Robinwood Ln Kayewwod Dr Emerson Ln 05/23/22 10/07/22 Wastewater Collections will be Wastewater Tiffany Sherrane
28 installing a new sewer main line
and services.
29 Rockhill Rd @ Rhoades Rd RxR Crossing 10/04/22 10/07/22 Railroad Crossing
30 Savage Dr Hayes St Comer St 09/29/22 09/30/22 Mill&Overlay Streets Jeremy Wilks
31 Union Lake Rd Wind River Ln Valencia Ln 09/26/22 10/06/22 Sidewalk repair Streets Roy San Miguel
32 Vintage Blvd @ Ft Worth Dr RxR Crossing 10/08/22 10/09/22 Railroad Crossing
33 Windsor Dr Longfellow Ln Wilsonwood Dr 10/04/22 10/14/22 Sidewalk repair Engineering Dustin Draper
Exported on October 14,2022 12:14:01 PM CDT