2022/12/02 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Dec 5th - 11 th
Street/Intersection From To Department Contact
1 Carroll Dr Oak St McKinney St 12/09/22 02/10/23 Wastewater Collections will be installing a new Wastewater Tiffany Sherrane
sewer main line.
2 Clover Ln Robinwood Ln Glenwood Ln 12/09/22 04/05/23 Water Distribution will be installing a new water Water Tiffany Sherrane
main line and services.
3 Long Rd Stuart Rd Sherman Dr 12/05/22 12/07/22 Installing sanitary sewer improvements Private Development Tucker Eller
4 Mistywood Ln Robinwood Ln Sherwood Ln 12/09/22 04/05/23 Water Distribution will be installing a new main Water Tiffany Sherrane
line and services.
North Texas Blvd NB 135E Service Rd Highland Park 12/05/22 12/16/22 Contractor will be performing asphalt demo of Engineering Robin Davis
5 the existing roadway,earthwork and sub-grade
work for base course of new widened roadway.
6 Robinwood Ln Kayewood or Emerson Ln 12/09/22 04/05/23 Water Distribution will be installing a new water Water Tiffany Sherrane
main line and services.
7 Woodrow Ln Morse St McKinney St E 12/08/22 01/20/23 Water tie in,Right turn lane and approach Public Works Inspections Armando Beltran
construction.
8 Wye St Cross Timbers Mill St 12/05/22 02/24/23 Water/wastewater replacement and full street Engineering Seth Garcia
reconstruction
Exported on December 2,2022 10:28:42 AM CST
2 Street Closure Report: Current Closures smartsheet
Closure Start Closure End Department Department Contact
To Date Date
Street/Intersection Fro, Description
1 Atlas Dr Hercules Ln Redstone Rd 10/17/22 02/10/23 Reconstruct Streets Jeremy Wilks
2 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
3 Ave A Greenlee Sr Ave A 10/25/22 12/23/22 Street Reconstruction Engineering Dustin Draper
4 Ave B Underwood St Margie St 10/05/22 12/16/22 Street Reconstruction Engineering Dustin Draper
5 Ave H Prairie St Louise St 09/05/22 12/16/22 Street Reconstruction Engineering Dustin Draper
6 Bradshaw St Hickory St McKinney St 03/21/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
7 Brook Hollow Dr Greenway Dr Carriage Hill 10/07/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
8 Camino Real Edwards Rd Pockus Page 10/31/22 12/09/22 Street Panel Repair Streets Roy San Miguel
9 Clear River Ln Montecito Dr Rambling Brook Trl 10/24/22 12/21/22 Sidewalk Repair Streets Roy San Miguel
10 Colonial Dr Thunderbird Dr South Dead End 07/11/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
11 Cook St Robertson St Wye St 10/24/22 02/03/23 Utility installation and roadway Engineering Seth Garcia
reconstruction
12 Crawford St Hickory St McKinney St 03/21/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
13 Crescent St Fulton St Alice St 09/27/22 12/23/22 Street Reconstruction Engineering Dustin Draper
14 Fulton St Grace Temple Ave Congress St 10/04/22 12/23/22 Street Reconstruction Engineering Dustin Draper
15 Fulton St Oak St Grace Temple Ave 09/07/22 12/23/22 Street Reconstruction Engineering Dustin Draper
16 Greenway Dr Thunderbird Dr South Dead End 07/11/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
17 Greenway Dr Thunderbird Dr. Windsor Farms Dr 10/07/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
18 Hettie St Paisley St McKinney St 03/21/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
19 Hickory St Exposition St Ruddell St 05/02/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
20 Jim Christal Rd Western Blvd Masch Branch Rd 04/18/22 01/30/23 Exeter PH2:Paving Jim Christal Private Development Public Kirk Winter
Works Inspections
21 Lakewood Dr Greenway Dr Carriage Hill 10/07/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
22 Masch Branch Rd Lovers Ln Hampton Rd 06/24/22 12/31/22 Bridge collapse at 3288 N. Drainage Gabriel Rodriguez
Masch Branch Rd
23 McKinney St Crawford Rd Audra Ln 05/19/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
North Texas Blvd 1-35W Oak St 12/13/21 12/30/22 Utility installations and Engineering Scott Fettig
pavement replacement.There
24 will be multiple phases of
closures.Will not be all at one
time.
25 North Texas Blvd Oak St Hickory St 06/10/22 12/30/22 Utility installations and Engineering Scott Fettig
pavement replacement.
26 Oak St Miller St North Texas Blvd 09/30/22 12/30/22 Utility installations and Engineering Scott Fettig
pavement replacement.
27 Oak St Crawford St Wood St 04/04/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
28 Park Access Rd(Off Bonnie Brae) Windsor Dr Riney Rd 11/15/22 07/31/23 Urbana Bonnie Brae Project: Private Development Public Jeremiah Tillman-David
Water,Sewer,Storm,Paving. Works Inspections
29 Parkside Dr Windsor Dr Bowling Green St 05/31/22 12/16/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on December 2,2022 10:28:50 AM CST
Closure Start Description Department Contact
Date
Street/Intersection From To
30 Peach St Locust St Fowler Dr 07/18/22 12/09/22 Upgrading 15"Storm pipe to Drainage Gabriel Rodriguez
18"
31 Robertson St Bell Ave Morse St 08/15/22 12/16/22 Utility installations and Engineering Seth Garcia
pavement replacement.
32 Stella St North Texas Blvd Bonnie Brae St 10/29/21 12/30/22 Utility installations and Engineering Scott Fettig
pavement replacement.
33 Uland St Rose St Railroad Ave 04/25/22 12/30/22 Utility installations and Engineering Scott Fettig
pavement replacement.
34 Wayne St Boyd St Monzingo Rd 11/14/22 01/06/23 Street Reconstruction Engineering Dustin Draper
35 Western Blvd University Dr(380) Airport Rd 09/19/22 12/16/22 Western Blvd Paving Decal Private Development Public Jeremiah Tillman-David
Lanes Works Inspections
36 Wood St McKinney St Hickory St 04/11/22 12/31/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on December 2,2022 10:28:50 AM CST
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection d&_ Date 7Date Description Department IDepartment Contact
1 Blackberry Way Thistle HL Thistle Way 10/10/22 11/23/22 French Drain system project Drainage Gabriel Rodriguez
2 Fairway Dr Clubview,Dr Links Dr 10/17/ 22 11/17/22 Sidewalk Repair Streets Roy San Miguel
3 Frame St @ Mingo Rd RxR Crossing 11/19/22 11/21/22 Railroad Crossing
4 Hill Alley St Jackson St Martin St 06/06/22 11/18/22 Utility replacement and roadway Engineering Seth Garcia
reconstruction
5 Hinkley Oaks Dr Barrydale Dr Hinkley Oaks(7612) 10/10/22 11/18/22 Concrete Panel and sidewalk Streets Roy San Miguel
repair
6 Jackson St Morse St Hill Alley St 06/06/22 11/18/22 Utility replacement and roadway Engineering Seth Garcia
reconstruction
7 Lonesome Trail Bareback Ln English Saddle Ln 10/24/22 12/01/22 Sidewalk Repair Streets Roy San Miguel
8 Long Road Stuart Road Sherman Drive 11/09/22 11/11/22 Water tap on existing line Public Works Inspections Tucker Eller
9 Long Road Stuart Road Loop 288 11/21/22 11/23/22 Replacing concrete road panels Private Development Tucker Eller
10 McKinney St Bell Ave Frame St 10/10/22 11/11/22 Inlets and approaches Public Works Inspections Armando Beltran
11 McKinney St @ Bell Ave RxR Crossing 11/20/22 11/22/22 Railroad Crossing
12 McKinney St Bell Ave Frame St 10/10/22 11/25/22 Restructuring the entrance to Public Works Inspections Armando Beltran
Frame St.
13 Montecito Dr Ryan Rd Dead end 10/10/22 11/09/22 Mill Overlay Engineering Seth Garcia
14 Morse St Lakey St Jackson St 06/06/22 11/18/22 Utility replacement and roadway Engineering Seth Garcia
reconstruction
15 Nottingham Dr Churchill Dr Devonshire Ct 10/17/22 11/04/22 Valley Gutter and Curb Repair Streets Roy San Miguel
16 Oceanview Dr Marina Dr Intersection 10/24/22 11/11/22 Concrete Panel repair Streets Roy San Miguel
17 Panhandle St Aileen St Malone St 08/24/22 11/16/22 Street Reconstruction Engineering Dustin Draper
18 Rose St Paisley St Uland St 04/25/22 11/30/22 Pavement Replacement Engineering Scott Fettig
19 Seven Oaks Ln Rambling Brook Trl Serenity Way 10/17/22 11/17/22 Street panels and Sidewalk Streets Roy San Miguel
repair
Various Streets 11/07/22 11/15/22 Repairs made to the micro Streets Jeremy Wilks
surfacing treatment on various
street.A complete list and
20 schedule of streets receiving
repairs can be found at
https://www.discussdenton.com/
street-operations
21 Western Blvd Jim Christal Rd Airport Rd 08/01/22 11/30/22 Paving(2)drive approaches Private Development Public Kirk Winter
Works Inspections
22 Windsor Dr Fireside Ln Bonnie Brae St 06/06/22 11/30/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on December 2,2022 10:29:01 AM CST