Loading...
2022/12/02 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Dec 5th - 11 th Street/Intersection From To Department Contact 1 Carroll Dr Oak St McKinney St 12/09/22 02/10/23 Wastewater Collections will be installing a new Wastewater Tiffany Sherrane sewer main line. 2 Clover Ln Robinwood Ln Glenwood Ln 12/09/22 04/05/23 Water Distribution will be installing a new water Water Tiffany Sherrane main line and services. 3 Long Rd Stuart Rd Sherman Dr 12/05/22 12/07/22 Installing sanitary sewer improvements Private Development Tucker Eller 4 Mistywood Ln Robinwood Ln Sherwood Ln 12/09/22 04/05/23 Water Distribution will be installing a new main Water Tiffany Sherrane line and services. North Texas Blvd NB 135E Service Rd Highland Park 12/05/22 12/16/22 Contractor will be performing asphalt demo of Engineering Robin Davis 5 the existing roadway,earthwork and sub-grade work for base course of new widened roadway. 6 Robinwood Ln Kayewood or Emerson Ln 12/09/22 04/05/23 Water Distribution will be installing a new water Water Tiffany Sherrane main line and services. 7 Woodrow Ln Morse St McKinney St E 12/08/22 01/20/23 Water tie in,Right turn lane and approach Public Works Inspections Armando Beltran construction. 8 Wye St Cross Timbers Mill St 12/05/22 02/24/23 Water/wastewater replacement and full street Engineering Seth Garcia reconstruction Exported on December 2,2022 10:28:42 AM CST 2 Street Closure Report: Current Closures smartsheet Closure Start Closure End Department Department Contact To Date Date Street/Intersection Fro, Description 1 Atlas Dr Hercules Ln Redstone Rd 10/17/22 02/10/23 Reconstruct Streets Jeremy Wilks 2 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 12/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 3 Ave A Greenlee Sr Ave A 10/25/22 12/23/22 Street Reconstruction Engineering Dustin Draper 4 Ave B Underwood St Margie St 10/05/22 12/16/22 Street Reconstruction Engineering Dustin Draper 5 Ave H Prairie St Louise St 09/05/22 12/16/22 Street Reconstruction Engineering Dustin Draper 6 Bradshaw St Hickory St McKinney St 03/21/22 12/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 7 Brook Hollow Dr Greenway Dr Carriage Hill 10/07/22 12/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 8 Camino Real Edwards Rd Pockus Page 10/31/22 12/09/22 Street Panel Repair Streets Roy San Miguel 9 Clear River Ln Montecito Dr Rambling Brook Trl 10/24/22 12/21/22 Sidewalk Repair Streets Roy San Miguel 10 Colonial Dr Thunderbird Dr South Dead End 07/11/22 12/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 11 Cook St Robertson St Wye St 10/24/22 02/03/23 Utility installation and roadway Engineering Seth Garcia reconstruction 12 Crawford St Hickory St McKinney St 03/21/22 12/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 13 Crescent St Fulton St Alice St 09/27/22 12/23/22 Street Reconstruction Engineering Dustin Draper 14 Fulton St Grace Temple Ave Congress St 10/04/22 12/23/22 Street Reconstruction Engineering Dustin Draper 15 Fulton St Oak St Grace Temple Ave 09/07/22 12/23/22 Street Reconstruction Engineering Dustin Draper 16 Greenway Dr Thunderbird Dr South Dead End 07/11/22 12/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 17 Greenway Dr Thunderbird Dr. Windsor Farms Dr 10/07/22 12/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 18 Hettie St Paisley St McKinney St 03/21/22 12/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 19 Hickory St Exposition St Ruddell St 05/02/22 12/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 20 Jim Christal Rd Western Blvd Masch Branch Rd 04/18/22 01/30/23 Exeter PH2:Paving Jim Christal Private Development Public Kirk Winter Works Inspections 21 Lakewood Dr Greenway Dr Carriage Hill 10/07/22 12/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 22 Masch Branch Rd Lovers Ln Hampton Rd 06/24/22 12/31/22 Bridge collapse at 3288 N. Drainage Gabriel Rodriguez Masch Branch Rd 23 McKinney St Crawford Rd Audra Ln 05/19/22 12/31/22 Utility installations and Engineering Scott Fettig pavement replacement. North Texas Blvd 1-35W Oak St 12/13/21 12/30/22 Utility installations and Engineering Scott Fettig pavement replacement.There 24 will be multiple phases of closures.Will not be all at one time. 25 North Texas Blvd Oak St Hickory St 06/10/22 12/30/22 Utility installations and Engineering Scott Fettig pavement replacement. 26 Oak St Miller St North Texas Blvd 09/30/22 12/30/22 Utility installations and Engineering Scott Fettig pavement replacement. 27 Oak St Crawford St Wood St 04/04/22 12/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 28 Park Access Rd(Off Bonnie Brae) Windsor Dr Riney Rd 11/15/22 07/31/23 Urbana Bonnie Brae Project: Private Development Public Jeremiah Tillman-David Water,Sewer,Storm,Paving. Works Inspections 29 Parkside Dr Windsor Dr Bowling Green St 05/31/22 12/16/22 Utility installations and Engineering Scott Fettig pavement replacement. Exported on December 2,2022 10:28:50 AM CST Closure Start Description Department Contact Date Street/Intersection From To 30 Peach St Locust St Fowler Dr 07/18/22 12/09/22 Upgrading 15"Storm pipe to Drainage Gabriel Rodriguez 18" 31 Robertson St Bell Ave Morse St 08/15/22 12/16/22 Utility installations and Engineering Seth Garcia pavement replacement. 32 Stella St North Texas Blvd Bonnie Brae St 10/29/21 12/30/22 Utility installations and Engineering Scott Fettig pavement replacement. 33 Uland St Rose St Railroad Ave 04/25/22 12/30/22 Utility installations and Engineering Scott Fettig pavement replacement. 34 Wayne St Boyd St Monzingo Rd 11/14/22 01/06/23 Street Reconstruction Engineering Dustin Draper 35 Western Blvd University Dr(380) Airport Rd 09/19/22 12/16/22 Western Blvd Paving Decal Private Development Public Jeremiah Tillman-David Lanes Works Inspections 36 Wood St McKinney St Hickory St 04/11/22 12/31/22 Utility installations and Engineering Scott Fettig pavement replacement. Exported on December 2,2022 10:28:50 AM CST 3 Street Closure Report: Completed Closures smartsheet Street/Intersection d&_ Date 7Date Description Department IDepartment Contact 1 Blackberry Way Thistle HL Thistle Way 10/10/22 11/23/22 French Drain system project Drainage Gabriel Rodriguez 2 Fairway Dr Clubview,Dr Links Dr 10/17/ 22 11/17/22 Sidewalk Repair Streets Roy San Miguel 3 Frame St @ Mingo Rd RxR Crossing 11/19/22 11/21/22 Railroad Crossing 4 Hill Alley St Jackson St Martin St 06/06/22 11/18/22 Utility replacement and roadway Engineering Seth Garcia reconstruction 5 Hinkley Oaks Dr Barrydale Dr Hinkley Oaks(7612) 10/10/22 11/18/22 Concrete Panel and sidewalk Streets Roy San Miguel repair 6 Jackson St Morse St Hill Alley St 06/06/22 11/18/22 Utility replacement and roadway Engineering Seth Garcia reconstruction 7 Lonesome Trail Bareback Ln English Saddle Ln 10/24/22 12/01/22 Sidewalk Repair Streets Roy San Miguel 8 Long Road Stuart Road Sherman Drive 11/09/22 11/11/22 Water tap on existing line Public Works Inspections Tucker Eller 9 Long Road Stuart Road Loop 288 11/21/22 11/23/22 Replacing concrete road panels Private Development Tucker Eller 10 McKinney St Bell Ave Frame St 10/10/22 11/11/22 Inlets and approaches Public Works Inspections Armando Beltran 11 McKinney St @ Bell Ave RxR Crossing 11/20/22 11/22/22 Railroad Crossing 12 McKinney St Bell Ave Frame St 10/10/22 11/25/22 Restructuring the entrance to Public Works Inspections Armando Beltran Frame St. 13 Montecito Dr Ryan Rd Dead end 10/10/22 11/09/22 Mill Overlay Engineering Seth Garcia 14 Morse St Lakey St Jackson St 06/06/22 11/18/22 Utility replacement and roadway Engineering Seth Garcia reconstruction 15 Nottingham Dr Churchill Dr Devonshire Ct 10/17/22 11/04/22 Valley Gutter and Curb Repair Streets Roy San Miguel 16 Oceanview Dr Marina Dr Intersection 10/24/22 11/11/22 Concrete Panel repair Streets Roy San Miguel 17 Panhandle St Aileen St Malone St 08/24/22 11/16/22 Street Reconstruction Engineering Dustin Draper 18 Rose St Paisley St Uland St 04/25/22 11/30/22 Pavement Replacement Engineering Scott Fettig 19 Seven Oaks Ln Rambling Brook Trl Serenity Way 10/17/22 11/17/22 Street panels and Sidewalk Streets Roy San Miguel repair Various Streets 11/07/22 11/15/22 Repairs made to the micro Streets Jeremy Wilks surfacing treatment on various street.A complete list and 20 schedule of streets receiving repairs can be found at https://www.discussdenton.com/ street-operations 21 Western Blvd Jim Christal Rd Airport Rd 08/01/22 11/30/22 Paving(2)drive approaches Private Development Public Kirk Winter Works Inspections 22 Windsor Dr Fireside Ln Bonnie Brae St 06/06/22 11/30/22 Utility installations and Engineering Scott Fettig pavement replacement. Exported on December 2,2022 10:29:01 AM CST