Loading...
2023/01/06 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Jan 9th - 15th Street/Intersection From To Department Contact 1 Dixon Ln Comer St Cope St 01/23/23 02/10/23 Sidewalk Repair Streets Roy San Miguel 2 Gardenview St Brooke St Evers Pkwy 01/16/23 11,27/23 Mill&Overlay Streets Jeff Jones 3 Hickory St W(221) Piner St Ceder St 01/16/23 02/16/23 Sidewalk Repair Streets Roy San Miguel 4 Kingfisher Ln(325) Meadowlark Ln Oriole Ln 01/30/23 02/17/23 Valley Gutter Repair Streets Roy San Miguel 5 Peach St Locust St Bell Ave 02/14/23 103/01/23 Mill&Overlay Streets Jeff Jones Exported on January 6,2023 11:00:35 AM CST 2 Street Closure Report: Current Closures smartsheet Street/Intersection I:: :I I I Closure Start Closure End Description Department Department Contact Date Date 1 Allen St Mill St Wye St 12/12/22 03/17/23 Utility replacement and roadway Engineering Seth Garcia reconstruction 2 Atlas Dr Hercules Ln Redstone Rd 10/17/22 02/10/23 Reconstruct Streets Jeremy Wilks 3 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 4 Boxwood Dr Plumbago Dr Daisy Dr 01/03/23 02/24/23 Street Panel and Sidewalk Streets Roy San Miguel Repair 5 Bradshaw St Hickory St McKinney St 03/21/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 6 Brook Hollow Dr Greenway Dr Carriage Hill 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. Carroll Dr Oak St Mcknney St 12/09/22 02/10/23 Wastewater Collections will be Wastewater Tiffany Sherrane 7 installing a new sewer main line. Clover Ln Robinwood Ln Glenwood Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane 8 installing a new main line and services. 9 Colonial Dr Thunderbird Dr South Dead End 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 10 Cook St Robertson St Wye St 10/24/22 02/03/23 Utility installation and roadway Engineering Seth Garcia reconstruction 11 Crawford St Hickory St McKinney St 03/21/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 12 Fulton St Broadway St Panhandle St 12/05/22 01/27/23 Street Reconstruction Engineering Dustin Draper 13 Fulton St University Dr Westway St 01/09/23 01/27/23 Sidewalk Repair Streets Roy San Miguel 14 Fulton St Cordell St Crescent St 12/27/22 02/17/23 Street Reconstruction Engineering Dustin Draper 15 Gober St Broadway St Panhandle St 01/02/23 02/24/23 Mill and Overlay Streets Jeff Jones 16 Greenway Dr Thunderbird Dr South Dead End 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 17 Greenway Dr Thunderbird Dr Windsor Farms Dr 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 18 Hattie St Paisley St McKinney St 03/21/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 19 Hickory St Exposition St Ruddell St 05/02/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 20 Jim Christal Rd Western Blvd Masch Branch Rd 04/18/22 01/30/23 Exeter PH2:Paving Jim Christal Private Development Public Kirk Winter Works Inspections 21 Lakewood Dr Greenway Dr Carriage Hill 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 22 Masch Branch Rd Lovers Ln Hampton Rd 06/24/22 02/28/23 Bridge collapse at 3288 N. Drainage Gabriel Rodriguez Masch Branch Rd 23 McCormick St Eagle Dr Fannin St 12/27/22 02/17/23 Street Reconstruction Engineering Dustin Draper 24 McKinney St Grissom Rd Fork St 12/19/22 01/20/23 Relocating inlet,installing drive Public Works Inspections Armando Beltran approach. 25 McKinney St Crawford Rd Audra Ln 05/19/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. Mistywood Ln Robinwood Ln Sherwood Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane 26 installing a new main line and services. North Texas Blvd 1-35W Oak St 12/13/21 01/31/23 Utility installations and Engineering Scott Fettig pavement replacement.There 27 will be multiple phases of closures.Will not be all at one time. Exported on January 6,2023 11:00:45 AM CST Intersection • To ,ate Closure • • Description Department Department 28 North Texas Blvd Oak St Hickory St 06/10/22 01/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 29 Oak St Miller St North Texas Blvd 09/30/22 01/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 30 Oak St Crawford St Wood St 04/04/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 31 Park Access Rd(Off Bonnie Brae) Windsor Or Riney Rd 12/15/22 07/31/23 Urbana Bonnie Brae Project: Private Development Public Jeremiah Tillman-David Water,Sewer,Storm,Paving. Works Inspections 32 Robertson St Bell Ave Morse St 08/15/22 01/27/23 Utility installations and Engineering Seth Garcia pavement replacement. Robinwood Ln Kayewood Dr Emerson Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane 33 installing a new main line and services. 34 Serenity Way Montecito Dr Glen Falls Ln 01/03/23 02/03/23 Street Panel and Sidewalk Streets Roy San Miguel repair 35 Stella St North Texas Blvd Bonnie Brae St 10/29/21 01/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 36 Thistle Hill Cheek St Cul V Sac 01/03/23 01/27/23 Sidewalk Repair Streets Roy San Miguel 37 Uland St Rose St Railroad Ave 04/25/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 38 Wayne St Boyd St Monzingo Rd 11/14/22 01/20/23 Street Reconstruction Engineering Dustin Draper 39 Wood St McKinney St Hickory St 04/11/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 40 Woodrow Ln Morse St McKinney St 12/08/22 01/20/23 Water tie in,Right turn lane and Public Works Inspections Armando Beltran approach construction. 41 Wye St Crosstimbers St Mill St 12/05/22 02/24/23 Water/wastewater replacement Engineering Seth Garcia and full street reconstruction Exported on January 6,2023 11:00:45 AM CST 3 Street Closure Report: Completed Closures smartsheet • • • Date . •_ • D- • Department Department 1 Ave A Greenlee St Ave A 10/25/22 12/23/22 Street Reconstruction Engineering Dustin Draper 2 Ave B Underwood St Margie St 10/05/22 12/16/22 Street Reconstruction Engineering Dustin Draper 3 Ave H Prairie St Louise St 09/05/22 12/16/22 Street Reconstruction Engineering Dustin Draper 4 Camino Real Edwards Rd Pockus Page 10/31/22 12/15/22 Street Panel Repair Streets Roy San Miguel 5 Clear River Ln Montecito Dr Rambling Brook Trl 10/24/22 01/05/23 Sidewalk Repair Streets Roy San Miguel 6 Crescent St Fulton St Alice St 09/27/22 12/23/22 Street Reconstruction Engineering Dustin Draper 7 Fulton St Grace Temple Ave Congress St 10/04/22 12/23/22 Street Reconstruction Engineering Dustin Draper 8 Fulton St Oak St Grace Temple Ave 09/07/22 12/23/22 Street Reconstruction Engineering Dustin Draper 9 Gardenview St Brooks St Evers Pkwy 12/04/22 12/17/22 Mill&Overlay Streets Jeremy Wilks 10 Long Rd Stuart Rd Sherman Dr 12/05/22 12/07/22 Installing sanitary sewer Private Development Tucker Eller improvements North Texas Blvd 135E NB Service Rd Highland Park 12/05/22 01/06/23 Contractor will be performing Engineering Robin Davis asphalt demo of the existing 11 roadway,earthwork and sub- grade work for base course of new widened roadway. Closure extended due to weather. 12 Parkside Dr Windsor Dr Bowling Green St 05/31/22 12/16/22 Utility installations and Engineering Scott Fettig pavement replacement. 13 Peach St Locust St Fowler Dr 07/18/22 12/22/22 Upgrading 15'Storm pipe to Drainage Gabriel Rodriguez 18" 14 Western Blvd University Dr(380) Airport Rd 09/19/22 12/16/22 Western Blvd Paving Decal Private Development Public Jeremiah Tillman-David Lanes Works Inspections Exported on January 6,2023 11:00:53 AM CST