2023/01/27 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Jan 30th - Feb 5th
Street/Intersection From Department Contact
1 Bell Ave @ Senior Center 02/06/23 02/10/23 Mill and Overlay,The parking spaces off of Bell Streets Jeff Jones
in front of Senior Center
2 Castle Pines Ln Burr Oak or @ Intersection 02/06/23 02/24/23 Concrete Street Panel repair Streets Roy San Miguel
3 Eagle or Bernard St Beatty St 02/06/23 02/17/23 Concrete Retaining Wall Repair Streets Roy San Miguel
4 Peach Bell Locust 02/13/23 03/03/23 Mill and Overlay Jeff Jones
5 Peach St Locust St Bell Ave 02/14/23 03/01/23 Mill&Overlay Streets Jeff Jones
Exported on January 27,2023 11:04:12 AM CST
2 Street Closure Report: Current Closures smartsheet
Street/Intersection I Closure Start Closure End Description Department Department Contact
Date Date
1 Allen St Mill St Wye St 12/12/22 03/17/23 Utility replacement and roadway Engineering Seth Garcia
reconstruction
2 Angelina Bend San Gabriel 1416 Angelina Bend 01/17/23 03/03/23 Street Reconstruction Engineering Dustin Draper
3 Atlas Dr Hercules Ln Redstone Rd 10/17/22 03/24/23 Reconstruct Streets Jeremy Wilks
4 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig
pavement replacement.
5 Ave A Ave A Greenlee 11/08/22 02/10/23 Street Reconstruction Engineering Dustin Draper
6 Bailey St Willson St Dead End South 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
7 Boxwood Dr Plumbago Dr Daisy Dr 01/03/23 02/24/23 Street Panel and Sidewalk Streets Roy San Miguel
Repair
8 Bradshaw St Hickory St McKinney St 03/21/22 03/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
9 Bradshaw St Wilson St Prairie St East 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
10 Brook Hollow Dr Greenway Dr Carriage Hill 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig
pavement replacement.
Carroll Dr Oak St Mckinney St 12/09/22 02/10/23 Wastewater Collections will be Wastewater Tiffany Shamans
11 installing a new sewer main
line.
Clover Ln Robinwood Ln Glenwood Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane
12 installing a new main line and
services.
13 Colonial Dr Thunderbird Dr Dead End South 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig
pavement replacement.
14 Cook St Robertson St Wye St 10/24/22 02/03/23 Utility installation and roadway Engineering Seth Garcia
reconstruction
15 Crawford St Hickory St McKinney St 03/21/22 03/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
16 Crescent St Fulton St Cordell St 01/16/23 02/10/23 installing new storm line along Private Development Lee Thurmond
crescent
17 Crescent St Alice Carroll Blvd 01/18/23 03/03/23 Street Reconstruction Engineering Dustin Draper
18 Dixon Ln Comer St Cope St 01/23/23 02/10/23 Sidewalk Repair Streets Roy San Miguel
Elm St Pecan St Oak St 01/23/23 02/04/23 Contractor will be performing Engineering Robin Davis
19 work on the pedestrian ramps
and diagonal crossings
improvements.
20 Fulton St Cordell St Crescent St 12/27/22 02/17/23 Street Reconstruction Engineering Dustin Draper
21 Gober St Broadway St Panhandle St 01/02/23 02/24/23 Mill and Overlay Streets Jeff Jones
22 Greenway Dr Thunderbird Dr Dead End South 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig
pavement replacement.
23 Greenway Dr Thunderbird Dr Windsor Farms Dr 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig
pavement replacement.
24 Hattie St Paisley St McKinney St 03/21/22 03/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
25 Hickory St Exposition St Ruddell St 05/02/22 03/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
26 Hickory St W(221) Finer St Ceder St 01/16/23 02/16/23 Sidewalk Repair Streets Roy San Miguel
27 Highland St Locust St Wainwright St 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
28 Industrial St Dead End Wye St 01/17/23 03/31/23 Utility replacement Engineering Seth Garcia
29 Jim Christal Rd Western Blvd Masch Branch Rd 04/18/22 03/17/23 Exeter PH2:Paving Jim Christal Private Development Public Kirk Winter
Works Inspections
Exported on January 27,2023 11:04:29 AM CST
Intersection • To , • , • • Description -p Department Contact
ate
30 Johnson St Dallas Dr Daughtry St 01/19/23 02/17/23 Atmos working on gas main on Atmos Public Works Stephany Trammell
Collins and Johnson Inspections
31 Johnson St Dallas Dr Wye St 01/17/23 03/31/23 Utility replacement Engineering Seth Garcia
32 Kingfisher Ln(325) Meadowlark Ln Oriole Ln 01/30/23 02/17/23 Valley Gutter Repair Streets Roy San Miguel
33 Lakewood Dr Greenway Dr Carriage Hill 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig
pavement replacement.
34 Masch Branch Rd Lovers Ln Hampton Rd 06/24/22 02/28/23 Bridge collapse at 3288 N. Drainage Gabriel Rodriguez
Masch Branch Rd
35 McCormick St Eagle Dr Fannin St 12/27/22 02/17/23 Street Reconstruction Engineering Dustin Draper
36 McKinney St Crawford Rd Audra Ln 05/19/22 03/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
37 Mill St Allen St Johnson St 01/17/23 03/31/23 Utility Replacement Engineering Seth Garcia
Mistywood Ln Robinwood Ln Sherwood Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane
38 installing a new main line and
services.
North Texas Blvd 1-35W Oak St 12/13/21 01/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.There
39 will be multiple phases of
closures.Will not be all at one
time.
40 North Texas Blvd Oak St Hickory St 06/10/22 01/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
41 Oak St Miller St North Texas Blvd 09/30/22 01/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
Oak St Elm St Cedar St 01/23/23 02/03/23 Contractor will be performing Engineering Robin Davis
42 work on the pedestrian ramps
and diagonal crossings
improvements.
43 Oak St Crawford St Wood St 04/04/22 03/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
44 Park Access Rd(Off Bonnie Brae) Windsor Dr Riney Rd 12/15/22 07/31/23 Urbana Bonnie Brae Project: Private Development Public Jeremiah Tillman-David
Water,Sewer,Storm,Paving. Works Inspections
Robinwood Ln Kayewood Dr Emerson Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane
45 installing a new main line and
services.
46 Savannah Trl Whitney Ct Longridge Dr 02/02/23 03/09/23 Street Reconstruction Engineering Dustin Draper
47 Serenity Way Montecito Or Glen Falls Ln 01/03/23 02/03/23 Street Panel and Sidewalk Streets Roy San Miguel
repair
48 Smith St Johnson St Bell Ave 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
49 Stella St North Texas Blvd Bonnie Brae St 10/29/21 01/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
50 Uland St Rose St Railroad Ave 04/25/22 03/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
51 Wayne St Boyd St Mozingo Rd 11/14/22 02/10/23 Street Reconstruction Engineering Dustin Draper
52 Westward Dr Crestmeadow St Lookout Ln 01/23/23 02/10/23 water line tie in.open cut Private Development Public Lee Thurmond
roadway. Works Inspections
53 Whitney Ct Savannah Tr1 East Dead End 02/02/23 03/09/23 Street Reconstruction Engineering Dustin Draper
54 Wood St McKinney St Hickory St 04/11/22 03/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
55 Woodland St Brown Or Cherrywood Ln 01/17/23 02/27/23 Street Reconstruction Engineering Dustin Draper
56 Woodrow Ln Morse St McKinney St 12/08/22 02/03/23 Water tie in,Right turn lane and Public Works Inspections Armando Beltran
approach construction.
57 Wye St Crosstimbers St Mill St 12/05/22 02/24/23 Water/wastewater replacement Engineering Seth Garcia
and full street reconstruction
Exported on January 27,2023 11:04:29 AM CST
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection From Closure Start Closure End Description
Date Date Department I IDepartment Contact
1 Clear River Ln Montecito Dr Rambling Brook Trl 10/24/22 01/05/23 Sidewalk Repair Streets Roy San Miguel
2 Fulton St University Dr Westway St 01/09/23 01/27/23 Sidewalk Repair Streets Roy San Miguel
3 Fulton St Broadway St Panhandle St 12/05/22 01/27/23 Street Reconstruction Engineering Dustin Draper
4 Gardenview St Brooke St Evers Pkwy 01/16/23 01/27/23 Mill&Overlay Streets Jeff Jones
5 McKinney St Grissom Rd Fork St 12/19/22 01/20/23 Relocating inlet,installing drive Public Works Inspections Armando Beltran
approach.
North Texas Blvd 135E NB Service Rd Highland Park 12/05/22 01/06/23 Contractor will be performing Engineering Robin Davis
asphalt demo of the existing
6 roadway,earthwork and sub-
grade work for base course of
new widened roadway. Closure
extended due to weather.
7 Robertson St Bell Ave Morse St 08/15/22 01/27/23 Utility installations and Engineering Seth Garcia
pavement replacement.
8 Thistle Hill Cheek St Cul-de-sac 01/03/23 01/19/23 Sidewalk Repair Streets Roy San Miguel
Exported on January 27,2023 11:04:21 AM CST