Loading...
2023/01/27 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Jan 30th - Feb 5th Street/Intersection From Department Contact 1 Bell Ave @ Senior Center 02/06/23 02/10/23 Mill and Overlay,The parking spaces off of Bell Streets Jeff Jones in front of Senior Center 2 Castle Pines Ln Burr Oak or @ Intersection 02/06/23 02/24/23 Concrete Street Panel repair Streets Roy San Miguel 3 Eagle or Bernard St Beatty St 02/06/23 02/17/23 Concrete Retaining Wall Repair Streets Roy San Miguel 4 Peach Bell Locust 02/13/23 03/03/23 Mill and Overlay Jeff Jones 5 Peach St Locust St Bell Ave 02/14/23 03/01/23 Mill&Overlay Streets Jeff Jones Exported on January 27,2023 11:04:12 AM CST 2 Street Closure Report: Current Closures smartsheet Street/Intersection I Closure Start Closure End Description Department Department Contact Date Date 1 Allen St Mill St Wye St 12/12/22 03/17/23 Utility replacement and roadway Engineering Seth Garcia reconstruction 2 Angelina Bend San Gabriel 1416 Angelina Bend 01/17/23 03/03/23 Street Reconstruction Engineering Dustin Draper 3 Atlas Dr Hercules Ln Redstone Rd 10/17/22 03/24/23 Reconstruct Streets Jeremy Wilks 4 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 5 Ave A Ave A Greenlee 11/08/22 02/10/23 Street Reconstruction Engineering Dustin Draper 6 Bailey St Willson St Dead End South 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 7 Boxwood Dr Plumbago Dr Daisy Dr 01/03/23 02/24/23 Street Panel and Sidewalk Streets Roy San Miguel Repair 8 Bradshaw St Hickory St McKinney St 03/21/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 9 Bradshaw St Wilson St Prairie St East 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 10 Brook Hollow Dr Greenway Dr Carriage Hill 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. Carroll Dr Oak St Mckinney St 12/09/22 02/10/23 Wastewater Collections will be Wastewater Tiffany Shamans 11 installing a new sewer main line. Clover Ln Robinwood Ln Glenwood Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane 12 installing a new main line and services. 13 Colonial Dr Thunderbird Dr Dead End South 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 14 Cook St Robertson St Wye St 10/24/22 02/03/23 Utility installation and roadway Engineering Seth Garcia reconstruction 15 Crawford St Hickory St McKinney St 03/21/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 16 Crescent St Fulton St Cordell St 01/16/23 02/10/23 installing new storm line along Private Development Lee Thurmond crescent 17 Crescent St Alice Carroll Blvd 01/18/23 03/03/23 Street Reconstruction Engineering Dustin Draper 18 Dixon Ln Comer St Cope St 01/23/23 02/10/23 Sidewalk Repair Streets Roy San Miguel Elm St Pecan St Oak St 01/23/23 02/04/23 Contractor will be performing Engineering Robin Davis 19 work on the pedestrian ramps and diagonal crossings improvements. 20 Fulton St Cordell St Crescent St 12/27/22 02/17/23 Street Reconstruction Engineering Dustin Draper 21 Gober St Broadway St Panhandle St 01/02/23 02/24/23 Mill and Overlay Streets Jeff Jones 22 Greenway Dr Thunderbird Dr Dead End South 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 23 Greenway Dr Thunderbird Dr Windsor Farms Dr 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 24 Hattie St Paisley St McKinney St 03/21/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 25 Hickory St Exposition St Ruddell St 05/02/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 26 Hickory St W(221) Finer St Ceder St 01/16/23 02/16/23 Sidewalk Repair Streets Roy San Miguel 27 Highland St Locust St Wainwright St 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 28 Industrial St Dead End Wye St 01/17/23 03/31/23 Utility replacement Engineering Seth Garcia 29 Jim Christal Rd Western Blvd Masch Branch Rd 04/18/22 03/17/23 Exeter PH2:Paving Jim Christal Private Development Public Kirk Winter Works Inspections Exported on January 27,2023 11:04:29 AM CST Intersection • To , • , • • Description -p Department Contact ate 30 Johnson St Dallas Dr Daughtry St 01/19/23 02/17/23 Atmos working on gas main on Atmos Public Works Stephany Trammell Collins and Johnson Inspections 31 Johnson St Dallas Dr Wye St 01/17/23 03/31/23 Utility replacement Engineering Seth Garcia 32 Kingfisher Ln(325) Meadowlark Ln Oriole Ln 01/30/23 02/17/23 Valley Gutter Repair Streets Roy San Miguel 33 Lakewood Dr Greenway Dr Carriage Hill 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 34 Masch Branch Rd Lovers Ln Hampton Rd 06/24/22 02/28/23 Bridge collapse at 3288 N. Drainage Gabriel Rodriguez Masch Branch Rd 35 McCormick St Eagle Dr Fannin St 12/27/22 02/17/23 Street Reconstruction Engineering Dustin Draper 36 McKinney St Crawford Rd Audra Ln 05/19/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 37 Mill St Allen St Johnson St 01/17/23 03/31/23 Utility Replacement Engineering Seth Garcia Mistywood Ln Robinwood Ln Sherwood Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane 38 installing a new main line and services. North Texas Blvd 1-35W Oak St 12/13/21 01/31/23 Utility installations and Engineering Scott Fettig pavement replacement.There 39 will be multiple phases of closures.Will not be all at one time. 40 North Texas Blvd Oak St Hickory St 06/10/22 01/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 41 Oak St Miller St North Texas Blvd 09/30/22 01/31/23 Utility installations and Engineering Scott Fettig pavement replacement. Oak St Elm St Cedar St 01/23/23 02/03/23 Contractor will be performing Engineering Robin Davis 42 work on the pedestrian ramps and diagonal crossings improvements. 43 Oak St Crawford St Wood St 04/04/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 44 Park Access Rd(Off Bonnie Brae) Windsor Dr Riney Rd 12/15/22 07/31/23 Urbana Bonnie Brae Project: Private Development Public Jeremiah Tillman-David Water,Sewer,Storm,Paving. Works Inspections Robinwood Ln Kayewood Dr Emerson Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane 45 installing a new main line and services. 46 Savannah Trl Whitney Ct Longridge Dr 02/02/23 03/09/23 Street Reconstruction Engineering Dustin Draper 47 Serenity Way Montecito Or Glen Falls Ln 01/03/23 02/03/23 Street Panel and Sidewalk Streets Roy San Miguel repair 48 Smith St Johnson St Bell Ave 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 49 Stella St North Texas Blvd Bonnie Brae St 10/29/21 01/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 50 Uland St Rose St Railroad Ave 04/25/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 51 Wayne St Boyd St Mozingo Rd 11/14/22 02/10/23 Street Reconstruction Engineering Dustin Draper 52 Westward Dr Crestmeadow St Lookout Ln 01/23/23 02/10/23 water line tie in.open cut Private Development Public Lee Thurmond roadway. Works Inspections 53 Whitney Ct Savannah Tr1 East Dead End 02/02/23 03/09/23 Street Reconstruction Engineering Dustin Draper 54 Wood St McKinney St Hickory St 04/11/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 55 Woodland St Brown Or Cherrywood Ln 01/17/23 02/27/23 Street Reconstruction Engineering Dustin Draper 56 Woodrow Ln Morse St McKinney St 12/08/22 02/03/23 Water tie in,Right turn lane and Public Works Inspections Armando Beltran approach construction. 57 Wye St Crosstimbers St Mill St 12/05/22 02/24/23 Water/wastewater replacement Engineering Seth Garcia and full street reconstruction Exported on January 27,2023 11:04:29 AM CST 3 Street Closure Report: Completed Closures smartsheet Street/Intersection From Closure Start Closure End Description Date Date Department I IDepartment Contact 1 Clear River Ln Montecito Dr Rambling Brook Trl 10/24/22 01/05/23 Sidewalk Repair Streets Roy San Miguel 2 Fulton St University Dr Westway St 01/09/23 01/27/23 Sidewalk Repair Streets Roy San Miguel 3 Fulton St Broadway St Panhandle St 12/05/22 01/27/23 Street Reconstruction Engineering Dustin Draper 4 Gardenview St Brooke St Evers Pkwy 01/16/23 01/27/23 Mill&Overlay Streets Jeff Jones 5 McKinney St Grissom Rd Fork St 12/19/22 01/20/23 Relocating inlet,installing drive Public Works Inspections Armando Beltran approach. North Texas Blvd 135E NB Service Rd Highland Park 12/05/22 01/06/23 Contractor will be performing Engineering Robin Davis asphalt demo of the existing 6 roadway,earthwork and sub- grade work for base course of new widened roadway. Closure extended due to weather. 7 Robertson St Bell Ave Morse St 08/15/22 01/27/23 Utility installations and Engineering Seth Garcia pavement replacement. 8 Thistle Hill Cheek St Cul-de-sac 01/03/23 01/19/23 Sidewalk Repair Streets Roy San Miguel Exported on January 27,2023 11:04:21 AM CST