2023/02/03 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Feb 6th - 12th
Street/Intersection From To Department Department Contact
1 7 Peach St Locust St Bell Ave 02/14/23 03/01/23 Mill&Overlay Streets Jeff Jones
Exported on February 3,2023 12:57:13 PM CST
2 Street Closure Report: Current Closures smartsheet
Street/Intersection I Closure Start Closure End Description Department Department Contact
Date Date
1 Allen St Mill St Wye St 12/12/22 03/17/23 Utility replacement and roadway Engineering Seth Garcia
reconstruction
2 Angelina Bend San Gabriel 1416 Angelina Bend 01/17/23 03/03/23 Street Reconstruction Engineering Dustin Draper
3 Atlas Dr Hercules Ln Redstone Rd 10/17/22 03/24/23 Reconstruct Streets Jeremy Wilks
4 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig
pavement replacement.
5 Ave A Ave A Greenlee 11/08/22 02/10/23 Street Reconstruction Engineering Dustin Draper
6 Bailey St Willson St Dead End South 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
Bell Ave @ Senior Center 02/06/23 02/10/23 Mill and Overlay,The parking Streets Jeff Jones
7 spaces off of Bell in front of
Senior Center
8 Boxwood Dr Plumbago Dr Daisy Dr 01/03/23 02/24/23 Street Panel and Sidewalk Streets Roy San Miguel
Repair
9 Bradshaw St Hickory St McKinney St 03/21/22 03/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
10 Bradshaw St Wilson St Prairie St East 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
11 Brook Hollow Dr Greenway Dr Carriage Hill 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig
pavement replacement.
Carroll Dr Oak St Mckinney St 12/09/22 02/10/23 Wastewater Collections will be Wastewater Tiffany Sherrane
12 installing a new sewer main
line.
13 Castle Pines Ln Burr Oak Dr @ Intersection 02/06/23 02/24/23 Concrete Street Panel repair Streets Roy San Miguel
Clover Ln Robinwood Ln Glenwood Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane
14 installing a new main line and
services.
15 Colonial Dr Thunderbird Dr Dead End South 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig
pavement replacement.
16 Crawford St Hickory St McKinney St 03/21/22 03/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
17 Crescent St Fulton St Cordell St 01/16/23 02/10/23 installing new storm line along Private Development Lee Thurmond
crescent
18 Crescent St Alice Carroll Blvd 01/18/23 03/03/23 Street Reconstruction Engineering Dustin Draper
19 Dixon Ln Comer St Cope St 01/23/23 02/10/23 Sidewalk Repair Streets Roy San Miguel
20 Eagle Dr Bernard St Beatty St 02/06/23 02/17/23 Concrete Retaining Wall Repair Streets Roy San Miguel
Elm St Pecan St Oak St 01/23/23 02/10/23 Contractor will be performing Engineering Robin Davis
21 work on the pedestrian ramps
and diagonal crossings
improvements.
22 Fannin St Welch St Beatty St 02/03/23 03/10/23 Steet Reconstruction Engineering Dustion Draper
23 Fulton St Cordell St Crescent St 12/27/22 02/17/23 Street Reconstruction Engineering Dustin Draper
24 Gober St Broadway St Panhandle St 01/02/23 02/24/23 Mill and Overlay Streets Jeff Jones
25 Greenway Dr Thunderbird Dr Dead End South 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig
pavement replacement.
26 Greenway Dr Thunderbird Dr Windsor Farms Dr 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig
pavement replacement.
27 Hattie St Paisley St McKinney St 03/21/22 03/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
28 Hickory St Exposition St Ruddell St 05/02/22 03/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
29 Hickory St W(221) Piner St Ceder St 01/16/23 02/16/23 Sidewalk Repair Streets Roy San Miguel
Exported on February 3,2023 12:57:22 PM CST
Intersection
• To ,ate Closure • • Description Department Department
30 Highland St Locust St Wainwright St 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
31 Industrial St Dead End Wye St 01/17/23 03/31/23 Utility replacement Engineering Seth Garcia
32 Jim Christal Rd Western Blvd Masch Branch Rd 04/18/22 03/17/23 Exeter PH2:Paving Jim Christal Private Development Public Kirk Winter
Works Inspections
33 Johnson St Dallas Dr Daughtry St 01/19/23 02/17/23 Atmos working on gas main on Atmos Public Works Stephany Trammell
Collins and Johnson Inspections
34 Johnson St Dallas Dr Wye St 01/17/23 03/31/23 Utility replacement Engineering Seth Garcia
35 Kingfisher Ln(325) Meadowlark Ln Oriole Ln 01/30/23 02/17/23 Valley Gutter Repair Streets Roy San Miguel
36 Lakewood Dr Greenway Dr Carriage Hill 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig
pavement replacement.
37 Masch Branch Rd Lovers Ln Hampton Rd 06/24/22 02/28/23 Bridge collapse at 3288 N. Drainage Gabriel Rodriguez
Masch Branch Rd
38 McCormick St Eagle Dr Fannin St 12/27/22 02/17/23 Street Reconstruction Engineering Dustin Draper
39 McKinney St Crawford Rd Audra Ln 05/19/22 03/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
40 Mill St Allen St Johnson St 01/17/23 03/31/23 Utility Replacement Engineering Seth Garcia
Mistywood Ln Robinwood Ln Sherwood Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane
41 installing a new main line and
services.
42 Oak St Crawford St Wood St 04/04/22 03/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
43 Park Access Rd(Off Bonnie Brae) Windsor Dr Riney Rd 12/15/22 07/31/23 Urbana Bonnie Brae Project: Private Development Public Jeremiah Tillman-David
Water,Sewer,Storm,Paving. Works Inspections
Robinwood Ln Kayewood Dr Emerson Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane
44 installing a new main line and
services.
45 Savannah Trl Whitney Ct Longridge Dr 02/02/23 03/09/23 Street Reconstruction Engineering Dustin Draper
46 Serenity Way Montecito Dr Glen Falls Ln 01/03/23 02/17/23 Street Panel and Sidewalk Streets Roy San Miguel
repair
47 Smith St Johnson St Bell Ave 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
48 Uland St Rose St Railroad Ave 04/25/22 03/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
49 Wayne St Boyd St Mozingo Rd 11/14/22 02/10/23 Street Reconstruction Engineering Dustin Draper
50 Westward Dr Crestmeadow St Lookout Ln 01/23/23 02/10/23 water line tie in.open cut Private Development Public Lee Thurmond
roadway. Works Inspections
51 Whitney Ct Savannah Trl East Dead End 02/02/23 03/09/23 Street Reconstruction Engineering Dustin Draper
52 Wood St McKinney St Hickory St 04/11/22 03/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
53 Woodland St Brown Dr Cherrywood Ln 01/17/23 02/27/23 Street Reconstruction Engineering Dustin Draper
54 Wye St Crosstimbers St Mill St 12/05/22 02/24/23 Water/wastewater replacement Engineering Seth Garcia
and full street reconstruction
Exported on February 3,2023 12:57:22 PM CST
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection From Closure Start Closure End Description
Date Date Department I Department Contact
1 Clear River Ln Montecito Dr Rambling Brook Trl 10/24/22 01/05/23 Sidewalk Repair Streets Roy San Miguel
2 Cook St Robertson St Wye St 10/24/22 02/03/23 Utility installation and roadway Engineering Seth Garcia
reconstruction
3 Fulton St University Dr Westway St 01/09/23 01/27/23 Sidewalk Repair Streets Roy San Miguel
4 Fulton St Broadway St Panhandle St 12/05/22 01/27/23 Street Reconstruction Engineering Dustin Draper
5 Gardenview St Brooke St Evers Pkwy 01/16/23 01/27/23 Mill&Overlay Streets Jeff Jones
6 McKinney St Grissom Rd Fork St 12/19/22 01/20/23 Relocating inlet,installing drive Public Works Inspections Armando Beltran
approach.
North Texas Blvd 135E NB Service Rd Highland Park 12/05/22 01/06/23 Contractor will be performing Engineering Robin Davis
asphalt demo of the existing
7 roadway,earthwork and sub-
grade work for base course of
new widened roadway. Closure
extended due to weather.
North Texas Blvd 1-35W Oak St 12/13/21 01/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.There
8 will be multiple phases of
Closures.Will not be all at one
time.
9 North Texas Blvd Oak St Hickory St 06/10/22 01/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
10 Oak St Miller St North Texas Blvd 09/30/22 01/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
Oak St Elm St Cedar St 01/23/23 02/03/23 Contractor will be performing Engineering Robin Davis
11 work on the pedestrian ramps
and diagonal crossings
improvements.
12 Robertson St Bell Ave Morse St 08/15/22 01/27/23 Utility installations and Engineering Seth Garcia
pavement replacement.
13 Stella St North Texas Blvd Bonnie Brae St 10/29/21 01/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
14 Thistle Hill Cheek St Cut-de-sac 01/03/23 01/19/23 Sidewalk Repair Streets Roy San Miguel
15 Woodrow Ln Morse St McKinney St 12/08/22 02/03/23 Water tie in,Right turn lane and Public Works Inspections Armando Beltran
approach construction.
Exported on February 3,2023 12:57:30 PM CST