Loading...
2023/02/17 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Feb 20th - 26th Street/Intersection From To Closure End Description Department Department Contact 1 Avenue S Prairie St E Dead End South 03/06/23 05/20/23 Utility installations and pavement replacement. Engineering Scott Fettig 2 Castle Pines Ln Burr Oak Dr @ Intersection 02/27/23 03/17/23 Concrete Street Panel repair Streets Roy San Miguel 3 Smith St Dallas or(Hwy 77) Hill St 03/06/23 06/07/23 Utility installations and pavement replacement. Engineering Scott Fettig Exported on February 17,2023 11:47:18 AM CST 2 Street Closure Report: Current Closures smartsheet �� i Closure Start Closure End Description Department Department Contact Street/Intersection Date Date 1 Allen St Mill St Wye St 12/12/22 03/17/23 Utility replacement and roadway Engineering Seth Garcia reconstruction 2 Angelina Bend Dr San Gabriel Dr Angelina Bend Dr(1416) 01/17/23 03/03/23 Street Reconstruction Engineering Dustin Draper 3 Atlas Dr Hercules Ln Redstone Rd 10/17/22 03/24/23 Reconstruct Streets Jeremy Wilks 4 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 5 Bailey St Willson St Dead End South 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 6 Bell Ave Mingo Rd 300'North 02/20/23 02/22/23 Mill and Overlay of Senior Jeff Jones Center parking along bell 7 Boxwood Dr Plumbago Dr Daisy Dr 01/03/23 02/24/23 Street Panel and Sidewalk Streets Roy San Miguel Repair 8 Bradshaw St Hickory St McKinney St 03/21/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 9 Bradshaw St Wilson St Prairie St East 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 10 Brook Hollow Dr Greenway Dr Carriage Hill 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. Clover Ln Robinwood Ln Glenwood Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane 11 installing a new main line and services. 12 Colonial Dr Thunderbird Dr Dead End South 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 13 Crawford St Hickory St McKinney St 03/21/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 14 Crescent St Fulton St Cordell St 01/16/23 02/24/23 installing new storm line along Private Development Lee Thurmond crescent 15 Crescent St Alice Carroll Blvd 01/18/23 03/03/23 Street Reconstruction Engineering Dustin Draper 16 Dixon Ln Comer St Cope St 01/23/23 02/24/23 Sidewalk Repair Streets Roy San Miguel 17 Eagle Dr Bernard St Beatty St 02/20/23 03/03/23 Concrete Retaining Wall Repair Streets Roy San Miguel Elm St Pecan St Oak St 01/23/23 02/24/23 Contractor continues work on Engineering Robin Davis the pedestrian ramps and 18 diagonal crossings improvements.-All Way Crossing 19 Fannin St Welch St Beatty St 02/03/23 03/10/23 Steet Reconstruction Engineering Dustion Draper 20 Gober St Broadway St Panhandle St 01/02/23 02/24/23 Mill and Overlay Streets Jeff Jones 21 Greenway Dr Thunderbird Dr Dead End South 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 22 Greenway Dr Thunderbird Dr Windsor Farms Dr 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 23 Hattie St Paisley St McKinney St 03/21/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 24 Hickory St Exposition St Ruddell St 05/02/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 25 Highland St Locust St Wainwright St 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 26 Industrial St Dead End Wye St 01/17/23 03/31/23 Utility replacement Engineering Seth Garcia 27 Jim Christal Rd Western Blvd Masch Branch Rd 04/18/22 03/17/23 Exeter PH2:Paving Jim Christal Private Development Public Kirk Winter Works Inspections 28 Johnson St Dallas Dr Daughtry St 01/19/23 03/17/23 Atmos working on gas main on Atmos Public Works Stephany Trammell Collins and Johnson Inspections 29 Johnson St Dallas Dr Wye St 01/17/23 03131123 Utility replacement Engineering Seth Garcia Exported on February 17,2023 11:47:25 AM CST Intersection • To , • , • • �- • • •. Department Contact ate 30 Kingfisher Ln(325) Meadowlark Ln Oriole Ln 02/20/23 03/13/23 Valley Gutter Repair Streets Roy San Miguel 31 Lakewood Dr Greenway Or Carriage Hill 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 32 Masch Branch Rd Lovers Ln Hampton Rd 06/24/22 02/28/23 Bridge collapse at 3288 N. Drainage Gabriel Rodriguez Masch Branch Rd 33 McKinney St Crawford Rd Audra Ln 05/19/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 34 Mill St Allen St Johnson St 01/17/23 03/31/23 Utility Replacement Engineering Seth Garcia Mistywood Ln Robinwood Ln Sherwood Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane 35 installing a new main line and services. Oak St Elm St Cedar St 02/13/23 02/24/23 Contractor continues to work on Engineering Robin Davis 36 the new ramps for the diagonal crosswalks-All Way Crossing Project 37 Oak St Crawford St Wood St 04/04/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 38 Park Access Rd(Off Bonnie Brae) Windsor Dr Riney Rd 12/15/22 07/31/23 Urbana Bonnie Brae Project: Private Development Public Jeremiah Tillman-David Water,Sewer,Storm,Paving. Works Inspections 39 Peach St Locust St Bell Ave 02/14/23 03/01/23 Mill&Overlay Streets Jeff Jones Robinwood Ln Kayewood Dr Emerson Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane 40 installing a new main line and services. 41 Savannah Trl Whitney Ct Longridge Dr 02/02/23 03/09/23 Street Reconstruction Engineering Dustin Draper 42 Smith St Johnson St Bell Ave 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 43 Uland St Rose St Railroad Ave 04/25/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 44 Westward Dr Crestmeadow St Lookout Ln 01/23/23 02/24/23 water line tie in.open cut Private Development Public Lee Thurmond roadway. Works Inspections 45 Whitney Ct Savannah Trl Dead End East 02/02/23 03/09/23 Street Reconstruction Engineering Dustin Draper 46 Wood St McKinney St Hickory St 04/11/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 47 Woodland St Brown Or Cherrywood Ln 01/17/23 02/27/23 Street Reconstruction Engineering Dustin Draper 48 Woodrow Ln McKinney St E Troy H Lagrone Dr 02/20/23 03/03/23 Water tie in Public Works Inspections Ryan Cuba 49 Wye St Crosstimbers St Mill St 12/05/22 02/24/23 Water/Wastewater replacement Engineering Seth Garcia and full street reconstruction Exported on February 17,2023 11:47:25 AM CST 3 Street Closure Report: Completed Closures smartsheet Closure End I Street/Intersection Date Description Department Department Contact 1 Ave A Ave A Greenlee St 11/08/22 02/10/23 Street Reconstruction Engineering Dustin Draper Bell Ave @ Senior Center 02/06 223 02/17/23 Mill and Overlay,The parking Streets Jeff Jones 2 spaces off of Bell in front of Senior Center Carroll Dr Oak St Mckinney St 12/09/22 02/10/23 Wastewater Collections will be Wastewater Tiffany Sherrane 3 installing a new sewer main line. 4 Cook St Robertson St Wye St 10/24/22 02/03/23 Utility installation and roadway Engineering Seth Garcia reconstruction 5 Fulton St University Dr Westway St 01/09/23 01/27/23 Sidewalk Repair Streets Roy San Miguel 6 Fulton St Broadway St Panhandle St 12/05/22 01/27/23 Street Reconstruction Engineering Dustin Draper 7 Fulton St Cordell St Crescent St 12/27/22 02/17/23 Street Reconstruction Engineering Dustin Draper 8 Gardenview St Brooke St Evers Pkwy 01/16/23 01/27/23 Mill&Overlay Streets Jeff Jones 9 Hickory St W(221) Piner St Ceder St 01/16/23 02/17/23 Sidewalk Repair Streets Roy San Miguel 10 McCormick St Eagle Dr Fannin St 12/27/22 02/17/23 Street Reconstruction Engineering Dustin Draper 11 McKinney St Grissom Rd Fork St 12/19/22 01/20/23 Relocating inlet,installing drive Public Works Inspections Armando Beltran approach. North Texas Blvd 1-35W Oak St 12/13/21 01/31/23 Utility installations and Engineering Scott Fettig pavement replacement.There 12 will be multiple phases of Closures.Will not be all at one time. 13 North Texas Blvd Oak St Hickory St 06/10/22 01/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 14 Oak St Miller St North Texas Blvd 09/30/22 01/31/23 Utility installations and Engineering Scott Fettig pavement replacement. Oak St Elm St Cedar St 01/23/23 02/03/23 Contractor will be performing Engineering Robin Davis 15 work on the pedestrian ramps and diagonal crossings improvements. 16 Robertson St Bell Ave Morse St 08/15/22 01/27/23 Utility installations and Engineering Seth Garcia pavement replacement. 17 Serenity Way Montecito Dr Glen Falls Ln 01/03/23 02/17/23 Street Panel and Sidewalk Streets Roy San Miguel repair 18 Stella St North Texas Blvd Bonnie Brae St 10/29/21 01/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 19 Thistle Hill Cheek St Cul-de-sac 01/03/23 01/19/23 Sidewalk Repair Streets Roy San Miguel 20 Wayne St Boyd St Mozingo Rd 11/14/22 02/10/23 Street Reconstruction Engineering Dustin Draper 21 Woodrow Ln Morse St McKinney St 12/08/22 02/03/23 Water tie in,Right turn lane and Public Works Inspections Armando Beltran approach construction. Exported on February 17,2023 11:47:33 AM CST