Loading...
2023/02/24 - Street Closure Report - revised 1 Street Closure Report: Upcoming Closures smartsheet SCR Feb 27th — Mar 5th _91r__ Closure End Street/Intersection q- -PF Fr.. To Date Description Department Department Contact 1 Avenue S Prairie St E Dead End South 03/06/23 05/20/23 Utility installations and pavement replacement. Engineering Scott Fettig 2 Bradshaw St Prairie St E Sycamore St 03/13/23 07/17/23 Utility installations and pavement replacement. Engineering Scott Fettig 3 Castle Pines Ln Burr Oak or @ Intersection 02/27/23 03/17/23 Concrete Street Panel repair Streets Roy San Miguel 4 Eufemia or Hermalinda or Beatriz Dr 03/13/23 04/14/93 Sidewalk Repair Streets Roy San Miguel 5 Mill St Allen St Robertson St 02/27/23 05/31/23 Utility installation and roadway reconstruction Engineering Seth Garcia 6 Palamino Ct Mustang or Dead End West 03/06/23 03/31/23 Sidewalk Repair Streets Roy San Miguel 7 Smith St Dallas or(Hwy 77) Hill St 03/06/23 06/07/23 Utility installations and pavement replacement. Engineering Scott Fettig 8 Sycamore St Exposition St South Crawford St 03/13/23 07/17/23 Utility installations and pavement replacement. Engineering Scott Fettig 9 Wainwright St Highland St E Prairie St E 03/13/23 04/07/23 Utility installations and pavement replacement. Engineering Scott Fettig Exported on February 24,2023 11:45:49 AM CST 2 Street Closure Report: Current Closures smartsheet �� i Closure Start Closure End Description Department Department Contact Street/Intersection Date Date 1 Allen St Mill St Wye St 12/12/22 03/17/23 Utility replacement and roadway Engineering Seth Garcia reconstruction 2 Angelina Bend Dr San Gabriel Dr Angelina Bend Dr(1416) 01/17/23 03/24/23 Street Reconstruction Engineering Dustin Draper 3 Atlas Dr Hercules Ln Redstone Rd 10/17/22 03/24/23 Reconstruct Streets Jeremy Wilks 4 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 5 Ave A Ave A Greenlee St 11/08/22 03/10/23 Street Reconstruction Engineering Dustin Draper 6 Bailey St Willson St Dead End South 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 7 Barthold Rd railroad crossing @ Masch Branch Rd 02/25/23 02/25/23 Railroad maintenance for KCS Darryl Ware 8 Boxwood Dr Plumbago Dr Daisy Dr 01/03/23 03/24/23 Street Panel and Sidewalk Streets Roy San Miguel Repair 9 Bradshaw St Hickory St McKinney St 03/21/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 10 Bradshaw St Wilson St Prairie St East 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 11 Brook Hollow Dr Greenway Dr Carriage Hill 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. Carroll Dr Oak St Mckinney St 12/09/22 04/13/23 Wastewater Collections will be Wastewater Tiffany Sherrane 12 installing a new sewer main line. Carroll Dr Oak St Mckinney St 12/09/22 04/13/23 Wastewater Collections will be Wastewater Tiffany Sherrane 13 installing a new sewer main line. Clover Ln Robinwood Ln Glenwood Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane 14 installing a new main line and services. 15 Colonial Dr Thunderbird Dr Dead End South 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 16 Crawford St Hickory St McKinney St 03/21/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 17 Crescent St Fulton St Cordell St 01/16/23 03/03/23 installing new storm line along Private Development Lee Thurmond crescent 18 Crescent St Alice Carroll Blvd 01/18/23 03/31/23 Street Reconstruction Engineering Dustin Draper 19 Dixon Ln Comer St Cope St 01/23/23 03/10/23 Sidewalk Repair Streets Roy San Miguel 20 Eagle Dr Bernard St Beatty St 02/20/23 03/03/23 Concrete Retaining Wall Repair Streets Roy San Miguel 21 Elm Bottom Cir Sherman Dr city limits 02/23/23 02/28/23 Overlay Streets Jeff Jones Elm St Pecan St Oak St 01/23/23 03/03/23 Contractor continues work on Engineering Robin Davis the pedestrian ramps and 22 diagonal crossings improvements.-All Way Crossing 23 Fannin St Welch St Beatty St 02/03/23 03/31/23 Steet Reconstruction Engineering Dustin Draper 24 Greenway Dr Thunderbird Dr Dead End South 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 25 Greenway Dr Thunderbird Dr Windsor Farms Dr 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 26 Hettie St Paisley St McKinney St 03/21/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 27 Hickory St Exposition St Ruddell St 05/02/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 28 Highland St Locust St Wainwright St 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. Exported on February 24,2023 11:45:59 AM CST Intersection • To ,ate Closure , • • Description Department Department 29 Industrial St Dead End Wye St 01/17/23 03/31/23 Utility replacement Engineering Seth Garcia 30 Jim Christal Rd Western Blvd Masch Branch Rd 04/18/22 03/17/23 Exeter PH2:Paving Jim Christal Private Development Public Kirk Winter Works Inspections 31 Johnson St Dallas Dr Daughtry St 01/19/23 03/17/23 Atmos working on gas main on Atmos Public Works Stephany Trammell Collins and Johnson Inspections 32 Johnson St Dallas Dr Wye St 01/17/23 03/31/23 Utility replacement Engineering Seth Garcia 33 Kingfisher Ln(325) Meadowlark Ln Oriole Ln 02/20/23 03/13/23 Valley Gutter Repair Streets Roy San Miguel 34 Lakewood Dr Greenway Dr Carriage Hill 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 35 Masch Branch Rd Lovers Ln Hampton Rd 06/24/22 03/14/23 Bridge collapse at 3288 N. Drainage Gabriel Rodriguez Masch Branch Rd 36 May St Henderson Dr Autumn Oak Dr 02/27/23 04/28/23 Street Reconstruction Engineering Dustin Draper 37 McCormick St Eagle Dr Fannin St 12/27/22 03/10/23 Street Reconstruction Engineering Dustin Draper 38 McKinney St Crawford Rd Audra Ln 05/19/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 39 Mill St Allen St Johnson St 01/17/23 03/31/23 Utility Replacement Engineering Seth Garcia Mistywood Ln Robinwood Ln Sherwood Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane 40 installing a new main line and services. 41 Oak St Crawford St Wood St 04/04/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. Oak St Elm St Cedar St 02/13/23 03/03/23 Contractor has installed the Engineering Robin Davis diagonal crossing in the left lane 42 and will now begin work on the diagonal crossing on the right lane of Oak Street-All Way Crossing Project 43 Oak St W railroad crossing by Precision Dr 02/25/23 02/25/23 Railroad maintenance for KCS Darryl Ware 44 Park Access Rd(Off Bonnie Brae) Windsor Dr Riney Rd 12/15/22 07/31/23 Urbana Bonnie Brae Project: Private Development Public Jeremiah Tillman-David Water,Sewer,Storm,Paving. Works Inspections 45 Peach St Locust St Bell Ave 02/14/23 03/01/23 Mill&Overlay Streets Jeff Jones Robinwood Ln Kayewood Dr Emerson Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane 46 installing a new main line and services. 47 Savannah Trl Whitney Ct Longridge Dr 02/02/23 03/24/23 Street Reconstruction Engineering Dustin Draper 48 Smith St Johnson St Bell Ave 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 49 Uland St Rose St Railroad Ave 04/25/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 50 Wayne St Boyd St Mozingo Rd 11/14/22 03/10/23 Street Reconstruction Engineering Dustin Draper 51 Westward Dr Crestmeadow St Lookout Ln 01/23/23 03/03/23 water line tie in.open cut Private Development Public Lee Thurmond roadway. Works Inspections 52 Whitney Ct Savannah Trl Dead End East 02/02/23 03/31/23 Street Reconstruction Engineering Dustin Draper 53 Wood St McKinney St Hickory St 04/11/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 54 Woodland St Brown Or Cherrywood Ln 01/17/23 03/31/23 Street Reconstruction Engineering Dustin Draper 55 Woodrow Ln McKinney St E Troy H Lagrone Dr 02/20/23 03/03/23 Water tie in Public Works Inspections Ryan Cuba Exported on February 24,2023 11:45:59 AM CST 3 Street Closure Report: Completed Closures smartsheet Street/Intersection From Closure End Date Description Department--- Department Contact Bell Ave @ Senior Center 702/06/!23 ! 02/17/23 Mill and Overlay,The parking Streets Jeff Jones 1 spaces off of Bell in front of - 7Senior Center 2 Bell Ave Mingo Rd 300'North 0 / 0/23 02/22/23 Mill and Overlay of Senior Jeff Jones Center parking along bell 3 Cook St Robertson St Wye St 10/24/22 02/03/23 Utility installation and roadway Engineering Seth Garcia reconstruction 4 Fulton St University Dr Westway St 01/09/23 01/27/23 Sidewalk Repair Streets Roy San Miguel 5 Fulton St Broadway St Panhandle St 12/05/22 01/27/23 Street Reconstruction Engineering Dustin Draper 6 Fulton St Cordell St Crescent St 12/27/22 02/17/23 Street Reconstruction Engineering Dustin Draper 7 Gardenview St Brooke St Evers Pkwy 01/16/23 01/27/23 Mill&Overlay Streets Jeff Jones 8 Gober St Broadway St Panhandle St 01/02/23 02/24/23 Mill and Overlay Streets Jeff Jones 9 Hickory St W(221) Piner St Ceder St 01/16/23 02/17/23 Sidewalk Repair Streets Roy San Miguel North Texas Blvd 1-35W Oak St 12/13/21 01/31/23 Utility installations and Engineering Scott Fettig pavement replacement.There 10 will be multiple phases of closures.Will not be all at one time. 11 North Texas Blvd Oak St Hickory St 06/10/22 01/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 12 Oak St Miller St North Texas Blvd 09/30/22 01/31/23 Utility installations and Engineering Scott Fettig pavement replacement. Oak St Elm St Cedar St 01/23/23 02/03/23 Contractor will be performing Engineering Robin Davis 13I work on the pedestrian ramps and diagonal crossings improvements. 14 Robertson St Bell Ave Morse St 08/15/22 01/27/23 Utility installations and Engineering Seth Garcia pavement replacement. 15 Serenity Way Montecito Dr Glen Falls Ln 01/03/23 02/17/23 Street Panel and Sidewalk Streets Roy San Miguel repair 16 Stella St North Texas Blvd Bonnie Brae St 10/29/21 01/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 17 Woodrow Ln Morse St McKinney St 12/08/22 02/03/23 Water tie in,Right turn lane and Public Works Inspections Armando Beltran approach construction. 18 Wye St Crosstimbers St Mill St 12/05/22 02/24/23 Water/wastewater replacement Engineering Seth Garcia and full street reconstruction Exported on February 24,2023 11:46:07 AM CST