Loading...
2023/03/17 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Mar 20th - 26th Street/Intersection From To Department Department Contact 1 Mayhill Rd @ Spencer Rd 03/28/23 04/30/23 1 Water main tie-in and turn lane addition Public Works Inspections Ryan Cuba 2 Oak St Mounts Ave Fulton St 04/10/23 06/16/23 Wastewater Collections will be installing a new Wastewater Tiffany Sherrane sewer main lines and services. 3 Riesling or Rhone or Merlot or 1 03/27/23 05/12/23 Concrete Panel and Sidewalk Repair Streets Roy San Miguel Exported on March 17,2023 10:49:56 AM CDT 2 Street Closure Report: Current Closures smartsheet —WWF,0M Da"o- Closure End Description partment ff Department Contact Street/Intersection tsure Start De e Date 1 Angelina Bend Dr Angelina Bend Dr(1416) Sandy Creek Dr 03/13/23 04/28/23 Street Reconstruction Engineering Dustin Draper 2 Angelina Bend Dr San Gabriel Dr Angelina Bend Dr(1416) 01/17/23 04/28/23 Street Reconstruction Engineering Dustin Draper 3 Atlas Dr Hercules Ln Redstone Rd 10/17/22 03/24/23 Reconstruct Streets Jeremy Wilks 4 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 5 Avenue S Prairie St E Dead End South 03/06/23 05/20/23 Utility installations and Engineering Scott Fettig pavement replacement. 6 Bailey St Willson St Dead End South 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. Bonnie Brae St Scripture St(Roundabout) Oak St 02/09/23 03/31/23 Contractor is performing Engineering Robin Davis subgrade and pavement 7 repairs,. this will be a rolling closure while sections are repaired. traffic is reduced from 4 lanes to 2 in this area. 8 Bonnie Brae St Riney Rd Windsor Dr 03/10/23 07/31/23 Urbana at Bonnie Brae:Public Public Works Inspections Jeremiah Tillman-David Paving 9 Boxwood Dr Plumbago Dr Daisy Dr 01/03/23 03/24/23 Street Panel and Sidewalk Streets Roy San Miguel Repair 10 Bradshaw St Hickory St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 11 Bradshaw St Wilson St Prairie St E 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 12 Bradshaw St Prairie St E Sycamore St 03/13/23 07/17/23 Utility installations and Engineering Scott Fettig pavement replacement. 13 Brook Hollow Dr Greenway Dr Carriage Hill Rd 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. Carroll Dr Oak St Mckinney St 12/09/22 04/13/23 Wastewater Collections will be Wastewater Tiffany Sherrane 14 installing a new sewer main line. Carroll Dr Oak St Mckinney St 12/09/22 04/13/23 Wastewater Collections will be Wastewater Tiffany Sherrane 15 installing a new sewer main line. Clover Ln Robinwood Ln Glenwood Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane 16 installing a new main line and services. 17 Colonial Dr Thunderbird Dr Dead End South 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 18 Cordaro Ct Mira Vista Dr End of cul-de-sac 03/20/23 04/07/23 Mill&overlay curb and Streets Jeff Jones sidewalk 19 Crawford St Hickory St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 20 Crescent St Alice St Carroll Blvd 01/18/23 03/31/23 Street Reconstruction Engineering Dustin Draper 21 Eufemia Dr Hermalinda Dr Beatriz Dr 03/13/23 04/29/23 Sidewalk Repair Streets Roy San Miguel 22 Fannin St Welch St Beatty St 02/03/23 03/31/23 Steet Reconstruction Engineering Dustin Draper 23 Greenway Dr Thunderbird Dr Dead End South 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 24 Greenway Dr Thunderbird Dr Windsor Farms Dr 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 25 Hattie St Paisley St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 26 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper 27 Hickory St Exposition St Ruddell St 05/02/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 28 Highland St Locust St Wainwright St 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. Exported on March 17,2023 10:50:05 AM CDT Street/Intersection From To Description Department Department Contact 29 Industrial St Dead End Wye St 01/17/23 03/31/23 Utility replacement Engineering Seth Garcia 30 Jim Christal Rd Western Blvd Masch Branch Rd 04/18/22 04/21/23 Exeter PH2:Paving Jim Christal Private Development Public Kirk Winter Works Inspections 31 Johnson St Dallas Dr Wye St 01/17/23 03/31/23 Utility replacement Engineering Seth Garcia 32 Lakewood Dr Greenway Dr Carriage Hill Rd 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 33 Masch Branch Rd Lovers Ln Hampton Rd 06/24/22 03/31/23 Bridge collapse at 3288 N. Drainage Gabriel Rodriguez Masch Branch Rd 34 May St Henderson Dr Autumn Oak Dr 02/27/23 04/28/23 Street Reconstruction Engineering Dustin Draper 35 McKinney St Crawford Rd Audra Ln 05/19/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 36 Mill St Allen St Johnson St 01/17/23 03/31/23 Utility Replacement Engineering Seth Garcia 37 Mill St Allen St Robertson St 02/27/23 05/31/23 Utility installation and roadway Engineering Seth Garcia reconstruction Mistywood Ln Robinwood Ln Sherwood Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane 38 installing a new main line and services. North Texas Blvd 1-35 E Service Road Highland Park Rd 02/17/23 03/31/23 Widening&Reconstruction, Engineering Robin Davis Traffic Signal Upgrade. traffic 39 from 135 will need to use Bonnie Brae Street. project is limited to one-way traffic from Highland Park to 135E. 40 Oak St Crawford St Wood St 04/04/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 41 Palamino Ct Mustang Dr Dead End West 03/06/23 03/31/23 Sidewalk Repair Streets Roy San Miguel 42 Park Access Rd Windsor Dr Riney Rd 12/15/22 07/31/23 Urbana Bonnie Brae Project: Private Development Public Jeremiah Tillman-David Water,Sewer,Storm,Paving. Works Inspections Robinwood Ln Kayewood Dr Emerson Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane 43 installing a new main line and services. 44 Savannah Tr1 Whitney Ct Longridge Dr 02/02/23 04/28/23 Street Reconstruction Engineering Dustin Draper 45 Smith St Johnson St Bell Ave 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 46 Smith St Dallas Dr(Hwy 77) Hill St 03/06/23 06/07/23 Utility installations and Engineering Scott Fettig pavement replacement. 47 State School Rd 1-35E Bowie St 03/06/23 04/06/23 Utilities relocation along East Engineering Aaron Skinner side of State School Rd 48 Sycamore St Exposition St Crawford St S 03/13/23 07/17/23 Utility installations and Engineering Scott Fettig pavement replacement. 49 Wainwright St Highland St E Prairie St E 03/13/23 04/07/23 Utility installations and Engineering Scott Fettig pavement replacement. 50 Wayne St Boyd St Mozingo Rd 11/14/22 03/24/23 Street Reconstruction Engineering Dustin Draper 51 Westward Dr Crestmeadow St Lookout Ln 01/23/23 03/22/23 water line tie in.open cut Private Development Public Lee Thurmond roadway. Works Inspections 52 Whitney Ct Savannah Trl Dead End East 02/02/23 04/28/23 Street Reconstruction Engineering Dustin Draper 53 Wood St McKinney St Hickory St 04/11/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 54 Woodland St Brown Dr Cherrywood Ln 01/17/23 03/31/23 Street Reconstruction Engineering Dustin Draper 55 Woodrow Ln McKinney St E Troy H Lagrone Dr 02/20/23 03/31/23 Water tie in Public Works Inspections Ryan Cuba Exported on March 17,2023 10:50:05 AM CDT 3 Street Closure Report: Completed Closures smartsheet IntersectionFrom • k W. Closure- Closure_ •Mill r Description Department Department 1 Allen St Mill St Wye St 12/12/22 03/17/23 Utility replacement and roadway Engineering Seth Garcia reconstruction 2 Ave A Ave A Greenlee St 11/08/22 03/10/23 Street Reconstruction Engineering Dustin Draper 3 Barthold Rd railroad crossing @ Masch Branch Rd 02/25/23 02/25/23 Railroad maintenance for KCS Darryl Ware Bell Ave @ Senior Center 02/06/23 02/17/23 Mill and Overlay,The parking Streets Jeff Jones 4 spaces off of Bell in front of Senior Center 5 Bell Ave Mingo Rd 300'North 02/20/23 02/22/23 Mill and Overlay of Senior Jeff Jones Center parking along bell 6 Castle Pines Ln Burr Oak Dr @ Intersection 02/27/23 03/16/23 Concrete Street Panel repair Streets Roy San Miguel 7 Crescent St Fulton St Cordell St 01/16/23 03/10/23 installing new storm line along Private Development Lee Thurmond crescent 8 Dixon Ln Comer St Cope St 01/23/23 03/02/23 Sidewalk Repair Streets Roy San Miguel 9 Eagle Dr Bernard St Beatty St 02/20/23 03/02/23 Concrete Retaining Wall Repair Streets Roy San Miguel 10 Elm Bottom Cir Sherman Dr city limits 02/23/23 02/28/23 Overlay Streets Jeff Jones Elm St Pecan St Oak St 01/23/23 03/17/23 Contractor continues work on Engineering Robin Davis the pedestrian ramps and 11 diagonal crossings improvements.-All Way Crossing 12 Fulton St Cordell St Crescent St 12/27/22 02/17/23 Street Reconstruction i Engineering Dustin Draper 13 Gober St Broadway St Panhandle St 01/02/23 02/24/23 Mill and Overlay Streets Jeff Jones 14 Hickory St W(221) Piner St Ceder St 01/16/23 02/17/23 Sidewalk Repair Streets Roy San Miguel 15 Johnson St Dallas Dr Daughtry St 01/19/23 03/17/23 Atmos working on gas main on Atmos Public Works Stephany Trammell Collins and Johnson Inspections 16 Kingfisher Ln(325) Meadowlark Ln Oriole Ln 02/20/23 03/02/23 Valley Gutter Repair Streets Roy San Miguel 17 McCormick St Eagle Dr Fannin St 12/27/22 03/10/23 Street Reconstruction Engineering Dustin Draper Oak St Elm St Cedar St 02/13/23 03/17/23 Contractor is working on the Engineering Robin Davis 18 diagonal crossing on the NE corner of Oak&Elm. -All Way Crossing Project 19 Oak St W railroad crossing by Precision Or 02/25/23 02/25/23 Railroad maintenance for KCS Darryl Ware 20 Peach St Locust St Bell Ave 02/14/23 03/01/23 Mill&Overlay Streets Jeff Jones 21 Serenity Way Montecito Dr Glen Falls Ln 01/03/23 02/17/23 Street Panel and Sidewalk Streets Roy San Miguel repair 22 Uland St Rose St Railroad Ave 04/25/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 23 Wye St Crosstimbers St Mill St 12/05/22 02/24/23 Water/wastewater replacement Engineering Seth Garcia and full street reconstruction Exported on March 17,2023 10:50:15 AM CDT