Loading...
2023/03/24 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Mar 27th - Apr 2nd Street/Intersection Ar From To Description Department Department Contact 1 Clubhouse or Tuscan Hills Cir Paint or 04/17/23 05/19/23 Street Panel and Sidewalk Repair Streets Roy San Miguel 2 Oak St Mounts Ave Fulton St 04/10/23 06/16/23 Wastewater Collections will be installing a new Wastewater Tiffany Sherrane sewer main lines and services. 3 Ottawa or Great Bear Ln Wind River Ln 04/17/23 05/19/23 Street Panel and Sidewalk Repair Streets Roy San Miguel Exported on March 24,2023 11:01:32 AM CDT 2 Street Closure Report: Current Closures smartsheet _WWF,0M Da"o- Closure End Description partment ff Department Contact Street/Intersection tsure Start De e Date 1 Angelina Bend Dr Angelina Bend Dr(1416) Sandy Creek Dr 03/13/23 04/28/23 Street Reconstruction Engineering Dustin Draper 2 Angelina Bend Dr San Gabriel Dr Angelina Bend Dr(1416) 01/17/23 04/28/23 Street Reconstruction Engineering Dustin Draper 3 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 4 Avenue S Prairie St E Dead End South 03/06/23 05/20/23 Utility installations and Engineering Scott Fettig pavement replacement. 5 Bailey St Willson St Dead End South 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. Bonnie Brae St Scripture St(Roundabout) Oak St 03/27/23 04/07/23 Contractor is performing Engineering Robin Davis subgrade and pavement repairs,. Northbound traffic will 6 be moved to the inside Southbound lane. Southbound lanes will be converted to two- way traffic until the northbound lanes are repaired. 7 Bonnie Brae St Riney Rd Windsor Dr 03/10/23 07/31/23 Urbana at Bonnie Brae:Public Public Works Inspections Jeremiah Tillman-David Paving 8 Boxwood Dr Plumbago Dr Daisy Dr 01/03/23 03/31/23 Street Panel and Sidewalk Streets Roy San Miguel Repair 9 Bradshaw St Hickory St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 10 Bradshaw St Wilson St Prairie St E 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 11 Bradshaw St Prairie St E Sycamore St 03/13/23 07/17/23 Utility installations and Engineering Scott Fettig pavement replacement. 12 Brook Hollow Dr Greenway Dr Carriage Hill Rd 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. Carroll Dr Oak St Mckinney St 12/09/22 04/13/23 Wastewater Collections will be Wastewater Tiffany Sherrane 13 installing a new sewer main line. Carroll Dr Oak St Mckinney St 12/09/22 04/13/23 Wastewater Collections will be Wastewater Tiffany Sherrane 14 installing a new sewer main line. Clover Ln Robinwood Ln Glenwood Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane 15 installing a new main line and services. 16 Colonial Dr Thunderbird Dr Dead End South 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 17 Cordaro Ct Mira Vista Or End of cul-de-sac 03/20/23 04/07/23 Mill&overlay curb and Streets Jeff Jones sidewalk 18 Crawford St Hickory St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 19 Crescent St Alice St Carroll Blvd 01/18/23 03/31/23 Street Reconstruction Engineering Dustin Draper 20 Elm Street Oak Street Hickory Street 03/20/23 04/07/23 Installation of Diagonal Engineering Robin Davis Crosswalks/Ramps 21 Eufemia Dr Hermalinda Or Beatriz Dr 03/13/23 04/29/23 Sidewalk Repair Streets Roy San Miguel 22 Fannin St Welch St Beatty St 02/03/23 03/31/23 Steet Reconstruction Engineering Dustin Draper 23 Greenway Dr Thunderbird Dr Dead End South 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 24 Greenway Or Thunderbird Dr Windsor Farms Dr 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 25 Hattie St Paisley St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 26 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper 27 Hickory St Locust St Pecan St 03/20/23 04/07/23 Installation of Diagonal Engineering Robin Davis Crosswalks/Ramps Exported on March 24,2023 11:01:42 AM CDT Street/Intersection From To Closure Start Description Department Department Contact Date 28 Hickory St Exposition St Ruddell St 05/02/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 29 Highland St Locust St Wainwright St 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 30 Industrial St Dead End Wye St 01/17/23 03/31/23 Utility replacement Engineering Seth Garcia 31 Jim Christal Rd Western Blvd Masch Branch Rd 04/18/22 04/21/23 Exeter PH2:Paving Jim Christal Private Development Public Kirk Winter Works Inspections 32 Johnson St Dallas Dr Wye St 01/17/23 03/31/23 Utility replacement Engineering Seth Garcia 33 Johnson St Dallas Dr Daughtry St 01/19/23 04/14/23 Atmos working on gas main on Atmos Public Works Stephany Trammell Collins and Johnson Inspections 34 Lakewood Dr Greenway Dr Carriage Hill Rd 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 35 Maddox St. E.Prairie St. Dead End 03/20/23 07/10/23 Utility installations and Engineering Scott Fettig pavement replacement. 36 Masch Branch Rd Lovers Ln Hampton Rd 06/24/22 03/31/23 Bridge collapse at 3288 N. Drainage Gabriel Rodriguez Masch Branch Rd 37 May St Henderson Dr Autumn Oak Dr 02/27/23 04/28/23 Street Reconstruction Engineering Dustin Draper 38 Mayhill Rd @ Spencer Rd 03/28/23 04/30/23 Water main tie-in and turn lane Public Works Inspections Ryan Cuba addition 39 McKinney St Crawford Rd Audra Ln 05/19/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 40 Mill St Allen St Johnson St 01/17/23 03/31/23 Utility Replacement Engineering Seth Garcia 41 Mill St Allen St Robertson St 02/27/23 05/31/23 Utility installation and roadway Engineering Seth Garcia reconstruction Mistywood Ln Robinwood Ln Sherwood Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane 42 installing a new main line and services. North Texas Blvd 1-35 E Service Road Highland Park Rd 02/17/23 04/14/23 Widening&Reconstruction, Engineering Robin Davis Traffic Signal Upgrade. traffic 43 from 135 will need to use Bonnie Brae Street. project is limited to one-way traffic from Highland Park to 135E. 44 Oak St Crawford St Wood St 04/04/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 45 Palamino Ct Mustang Dr Dead End West 03/06/23 03/31/23 Sidewalk Repair Streets Roy San Miguel 46 Park Access Rd Windsor Dr Riney Rd 12/15/22 07/31/23 Urbana Bonnie Brae Project: Private Development Public Jeremiah Tillman-David Water,Sewer,Storm,Paving. Works Inspections 47 Riesling Dr Rhone Dr Merlot Dr 03/27/23 05/12/23 Concrete Panel and Sidewalk Streets Roy San Miguel Repair Robinwood Ln Kayewood Dr Emerson Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane 48 installing a new main line and services. 49 Savannah Trl Whitney Ct Longridge Dr 02/02/23 04/28/23 Street Reconstruction Engineering Dustin Draper 50 Smith St Johnson St Bell Ave 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 51 Smith St Dallas Dr(Hwy 77) Hill St 03/06/23 06/07/23 Utility installations and Engineering Scott Fettig pavement replacement. 52 State School Rd 1-35E Bowie St 03/06/23 04/06/23 Utilities relocation along East Engineering Aaron Skinner side of State School Rd 53 Sycamore St Exposition St Crawford St S 03/13/23 07/17/23 Utility installations and Engineering Scott Fettig pavement replacement. 54 Wainwright St Highland St E Prairie St E 03/13/23 04/07/23 Utility installations and Engineering Scott Fettig pavement replacement. 55 Whitney Ct Savannah Trl Dead End East 02/02/23 04/28/23 Street Reconstruction Engineering Dustin Draper 56 Wood St McKinney St Hickory St 04/11/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. Exported on March 24,2023 11:01:42 AM CDT Street/Intersection From To Description Department Department Contact 57 Woodland St Brown Dr Cherrywood Ln 01/17/23 03/31/23 Street Reconstruction Engineering Dustin Draper 58 Woodrow Ln McKinney St E Troy H Lagrone Dr 02/20/23 03/31/23 Water tie in Public Works Inspections Ryan Cuba Exported on March 24,2023 11:01:42 AM CDT 3 Street Closure Report: Completed Closures smartsheet Street/Intersection From MINEW-T Closure Start Closure End W Date Date Description Department Department Contact 1 Allen St Mill St Wye St 12/12/22 03/17/23 Utility replacement and roadway Engineering Seth Garcia reconstruction 2 Atlas Dr Hercules Ln Redstone Rd 10/17/22 03/24/23 Reconstruct Streets Jeremy Wilks 3 Ave A Ave A Greenlee St 11/08/22 03/10/23 Street Reconstruction Engineering Dustin Draper 4 Barthold Rd railroad crossing @ Masch Branch Rd 02/25/23 02/25/23 Railroad maintenance for KCS Darryl Ware 5 Bell Ave Mingo Rd 300'North 02/20/23 02/22/23 Mill and Overlay of Senior Jeff Jones Center parking along bell 6 Castle Pines Ln Burr Oak Dr @ Intersection 02/27/23 03/16/23 Concrete Street Panel repair Streets Roy San Miguel 7 Crescent St Fulton St Cordell St 01/16/23 03/10/23 installing new storm line along Private Development Lee Thurmond crescent 8 Dixon Ln Comer St Cope St 01/23/23 03/02/23 Sidewalk Repair Streets Roy San Miguel 9 Eagle Dr Bernard St Beatty St 02/20/23 03/02/23 Concrete Retaining Wall Repair Streets Roy San Miguel 10 Elm Bottom Cir Sherman Dr city limits 02/23/23 02/28/23 Overlay Streets Jeff Jones Elm St Pecan St Oak St 01/23/23 03/17/23 Contractor continues work on Engineering Robin Davis the pedestrian ramps and 11 diagonal crossings improvements.-All Way Crossing 12 Gober St Broadway St Panhandle St 01/02/23 02/24/23 Mill and Overlay Streets Jeff Jones 13 Kingfisher Ln(325) Meadowlark Ln Oriole Ln 02/20/23 03/02/23 Valley Gutter Repair Streets Roy San Miguel 14 McCormick St Eagle Dr Fannin St 12/27/22 03/10/23 Street Reconstruction Engineering Dustin Draper Oak St Elm St Cedar St 02/13/23 03/17/23 Contractor is working on the Engineering Robin Davis 15 diagonal crossing on the NE corner of Oak&Elm. -All Way Crossing Project 16 Oak St W railroad crossing by Precision Dr 02/25/23 02/25/23 Railroad maintenance for KCS Darryl Ware 17 Peach St Locust St Bell Ave 02/14/23 03/01/23 Mill&Overlay Streets Jeff Jones 18 Uland St Rose St Railroad Ave 04/25/22 03/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 19 Wayne St Boyd St Mozingo Rd 11/14/22 03/24/23 Street Reconstruction Engineering Dustin Draper 20 Westward Dr Crestmeadow St Lookout Ln 01/23/23 03/22/23 water line tie in.open cut Private Development Public Lee Thurmond roadway. Works Inspections 21 Wye St Crosstimbers St Mill St 12/05/22 02/24/23 Water/wastewater replacement Engineering Seth Garcia and full street reconstruction Exported on March 24,2023 11:01:52 AM CDT