2023/03/24 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Mar 27th - Apr 2nd
Street/Intersection Ar From To Description Department Department Contact
1 Clubhouse or Tuscan Hills Cir Paint or 04/17/23 05/19/23 Street Panel and Sidewalk Repair Streets Roy San Miguel
2 Oak St Mounts Ave Fulton St 04/10/23 06/16/23 Wastewater Collections will be installing a new Wastewater Tiffany Sherrane
sewer main lines and services.
3 Ottawa or Great Bear Ln Wind River Ln 04/17/23 05/19/23 Street Panel and Sidewalk Repair Streets Roy San Miguel
Exported on March 24,2023 11:01:32 AM CDT
2 Street Closure Report: Current Closures smartsheet
_WWF,0M Da"o- Closure End Description partment ff Department Contact
Street/Intersection tsure Start De
e Date
1 Angelina Bend Dr Angelina Bend Dr(1416) Sandy Creek Dr 03/13/23 04/28/23 Street Reconstruction Engineering Dustin Draper
2 Angelina Bend Dr San Gabriel Dr Angelina Bend Dr(1416) 01/17/23 04/28/23 Street Reconstruction Engineering Dustin Draper
3 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig
pavement replacement.
4 Avenue S Prairie St E Dead End South 03/06/23 05/20/23 Utility installations and Engineering Scott Fettig
pavement replacement.
5 Bailey St Willson St Dead End South 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
Bonnie Brae St Scripture St(Roundabout) Oak St 03/27/23 04/07/23 Contractor is performing Engineering Robin Davis
subgrade and pavement
repairs,. Northbound traffic will
6 be moved to the inside
Southbound lane. Southbound
lanes will be converted to two-
way traffic until the northbound
lanes are repaired.
7 Bonnie Brae St Riney Rd Windsor Dr 03/10/23 07/31/23 Urbana at Bonnie Brae:Public Public Works Inspections Jeremiah Tillman-David
Paving
8 Boxwood Dr Plumbago Dr Daisy Dr 01/03/23 03/31/23 Street Panel and Sidewalk Streets Roy San Miguel
Repair
9 Bradshaw St Hickory St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
10 Bradshaw St Wilson St Prairie St E 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
11 Bradshaw St Prairie St E Sycamore St 03/13/23 07/17/23 Utility installations and Engineering Scott Fettig
pavement replacement.
12 Brook Hollow Dr Greenway Dr Carriage Hill Rd 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig
pavement replacement.
Carroll Dr Oak St Mckinney St 12/09/22 04/13/23 Wastewater Collections will be Wastewater Tiffany Sherrane
13 installing a new sewer main
line.
Carroll Dr Oak St Mckinney St 12/09/22 04/13/23 Wastewater Collections will be Wastewater Tiffany Sherrane
14 installing a new sewer main
line.
Clover Ln Robinwood Ln Glenwood Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane
15 installing a new main line and
services.
16 Colonial Dr Thunderbird Dr Dead End South 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig
pavement replacement.
17 Cordaro Ct Mira Vista Or End of cul-de-sac 03/20/23 04/07/23 Mill&overlay curb and Streets Jeff Jones
sidewalk
18 Crawford St Hickory St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
19 Crescent St Alice St Carroll Blvd 01/18/23 03/31/23 Street Reconstruction Engineering Dustin Draper
20 Elm Street Oak Street Hickory Street 03/20/23 04/07/23 Installation of Diagonal Engineering Robin Davis
Crosswalks/Ramps
21 Eufemia Dr Hermalinda Or Beatriz Dr 03/13/23 04/29/23 Sidewalk Repair Streets Roy San Miguel
22 Fannin St Welch St Beatty St 02/03/23 03/31/23 Steet Reconstruction Engineering Dustin Draper
23 Greenway Dr Thunderbird Dr Dead End South 07/11/22 04/03/23 Utility installations and Engineering Scott Fettig
pavement replacement.
24 Greenway Or Thunderbird Dr Windsor Farms Dr 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig
pavement replacement.
25 Hattie St Paisley St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
26 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper
27 Hickory St Locust St Pecan St 03/20/23 04/07/23 Installation of Diagonal Engineering Robin Davis
Crosswalks/Ramps
Exported on March 24,2023 11:01:42 AM CDT
Street/Intersection From To Closure Start Description Department Department Contact
Date
28 Hickory St Exposition St Ruddell St 05/02/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
29 Highland St Locust St Wainwright St 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
30 Industrial St Dead End Wye St 01/17/23 03/31/23 Utility replacement Engineering Seth Garcia
31 Jim Christal Rd Western Blvd Masch Branch Rd 04/18/22 04/21/23 Exeter PH2:Paving Jim Christal Private Development Public Kirk Winter
Works Inspections
32 Johnson St Dallas Dr Wye St 01/17/23 03/31/23 Utility replacement Engineering Seth Garcia
33 Johnson St Dallas Dr Daughtry St 01/19/23 04/14/23 Atmos working on gas main on Atmos Public Works Stephany Trammell
Collins and Johnson Inspections
34 Lakewood Dr Greenway Dr Carriage Hill Rd 10/07/22 04/03/23 Utility installations and Engineering Scott Fettig
pavement replacement.
35 Maddox St. E.Prairie St. Dead End 03/20/23 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
36 Masch Branch Rd Lovers Ln Hampton Rd 06/24/22 03/31/23 Bridge collapse at 3288 N. Drainage Gabriel Rodriguez
Masch Branch Rd
37 May St Henderson Dr Autumn Oak Dr 02/27/23 04/28/23 Street Reconstruction Engineering Dustin Draper
38 Mayhill Rd @ Spencer Rd 03/28/23 04/30/23 Water main tie-in and turn lane Public Works Inspections Ryan Cuba
addition
39 McKinney St Crawford Rd Audra Ln 05/19/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
40 Mill St Allen St Johnson St 01/17/23 03/31/23 Utility Replacement Engineering Seth Garcia
41 Mill St Allen St Robertson St 02/27/23 05/31/23 Utility installation and roadway Engineering Seth Garcia
reconstruction
Mistywood Ln Robinwood Ln Sherwood Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane
42 installing a new main line and
services.
North Texas Blvd 1-35 E Service Road Highland Park Rd 02/17/23 04/14/23 Widening&Reconstruction, Engineering Robin Davis
Traffic Signal Upgrade. traffic
43 from 135 will need to use Bonnie
Brae Street. project is limited to
one-way traffic from Highland
Park to 135E.
44 Oak St Crawford St Wood St 04/04/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
45 Palamino Ct Mustang Dr Dead End West 03/06/23 03/31/23 Sidewalk Repair Streets Roy San Miguel
46 Park Access Rd Windsor Dr Riney Rd 12/15/22 07/31/23 Urbana Bonnie Brae Project: Private Development Public Jeremiah Tillman-David
Water,Sewer,Storm,Paving. Works Inspections
47 Riesling Dr Rhone Dr Merlot Dr 03/27/23 05/12/23 Concrete Panel and Sidewalk Streets Roy San Miguel
Repair
Robinwood Ln Kayewood Dr Emerson Ln 12/09/22 04/05/23 Water Distribution will be Water Tiffany Sherrane
48 installing a new main line and
services.
49 Savannah Trl Whitney Ct Longridge Dr 02/02/23 04/28/23 Street Reconstruction Engineering Dustin Draper
50 Smith St Johnson St Bell Ave 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
51 Smith St Dallas Dr(Hwy 77) Hill St 03/06/23 06/07/23 Utility installations and Engineering Scott Fettig
pavement replacement.
52 State School Rd 1-35E Bowie St 03/06/23 04/06/23 Utilities relocation along East Engineering Aaron Skinner
side of State School Rd
53 Sycamore St Exposition St Crawford St S 03/13/23 07/17/23 Utility installations and Engineering Scott Fettig
pavement replacement.
54 Wainwright St Highland St E Prairie St E 03/13/23 04/07/23 Utility installations and Engineering Scott Fettig
pavement replacement.
55 Whitney Ct Savannah Trl Dead End East 02/02/23 04/28/23 Street Reconstruction Engineering Dustin Draper
56 Wood St McKinney St Hickory St 04/11/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on March 24,2023 11:01:42 AM CDT
Street/Intersection From To Description Department Department Contact
57 Woodland St Brown Dr Cherrywood Ln 01/17/23 03/31/23 Street Reconstruction Engineering Dustin Draper
58 Woodrow Ln McKinney St E Troy H Lagrone Dr 02/20/23 03/31/23 Water tie in Public Works Inspections Ryan Cuba
Exported on March 24,2023 11:01:42 AM CDT
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection From MINEW-T Closure Start Closure End
W Date Date Description Department Department Contact
1 Allen St Mill St Wye St 12/12/22 03/17/23 Utility replacement and roadway Engineering Seth Garcia
reconstruction
2 Atlas Dr Hercules Ln Redstone Rd 10/17/22 03/24/23 Reconstruct Streets Jeremy Wilks
3 Ave A Ave A Greenlee St 11/08/22 03/10/23 Street Reconstruction Engineering Dustin Draper
4 Barthold Rd railroad crossing @ Masch Branch Rd 02/25/23 02/25/23 Railroad maintenance for KCS Darryl Ware
5 Bell Ave Mingo Rd 300'North 02/20/23 02/22/23 Mill and Overlay of Senior Jeff Jones
Center parking along bell
6 Castle Pines Ln Burr Oak Dr @ Intersection 02/27/23 03/16/23 Concrete Street Panel repair Streets Roy San Miguel
7 Crescent St Fulton St Cordell St 01/16/23 03/10/23 installing new storm line along Private Development Lee Thurmond
crescent
8 Dixon Ln Comer St Cope St 01/23/23 03/02/23 Sidewalk Repair Streets Roy San Miguel
9 Eagle Dr Bernard St Beatty St 02/20/23 03/02/23 Concrete Retaining Wall Repair Streets Roy San Miguel
10 Elm Bottom Cir Sherman Dr city limits 02/23/23 02/28/23 Overlay Streets Jeff Jones
Elm St Pecan St Oak St 01/23/23 03/17/23 Contractor continues work on Engineering Robin Davis
the pedestrian ramps and
11 diagonal crossings
improvements.-All Way
Crossing
12 Gober St Broadway St Panhandle St 01/02/23 02/24/23 Mill and Overlay Streets Jeff Jones
13 Kingfisher Ln(325) Meadowlark Ln Oriole Ln 02/20/23 03/02/23 Valley Gutter Repair Streets Roy San Miguel
14 McCormick St Eagle Dr Fannin St 12/27/22 03/10/23 Street Reconstruction Engineering Dustin Draper
Oak St Elm St Cedar St 02/13/23 03/17/23 Contractor is working on the Engineering Robin Davis
15 diagonal crossing on the NE
corner of Oak&Elm. -All Way
Crossing Project
16 Oak St W railroad crossing by Precision Dr 02/25/23 02/25/23 Railroad maintenance for KCS Darryl Ware
17 Peach St Locust St Bell Ave 02/14/23 03/01/23 Mill&Overlay Streets Jeff Jones
18 Uland St Rose St Railroad Ave 04/25/22 03/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
19 Wayne St Boyd St Mozingo Rd 11/14/22 03/24/23 Street Reconstruction Engineering Dustin Draper
20 Westward Dr Crestmeadow St Lookout Ln 01/23/23 03/22/23 water line tie in.open cut Private Development Public Lee Thurmond
roadway. Works Inspections
21 Wye St Crosstimbers St Mill St 12/05/22 02/24/23 Water/wastewater replacement Engineering Seth Garcia
and full street reconstruction
Exported on March 24,2023 11:01:52 AM CDT