2023/03/31 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Apr 3rd - 9th
Street/Intersection From To Description Department Department Contact
1 Clubhouse or Tuscan Hills Cir Paint Dr 04/17/23 05/19/23 Street Panel and Sidewalk Repair Streets Roy San Miguel
2 Oak St Mounts Ave Fulton St 04/18/23 0,131123 Wastewater Collections will be installing a new Wastewater Tiffany Sherrane
sewer main lines and services.
3 Oak St Thomas St Bonnie Brae St 04/10/23 04/14/23 Installing screen walls at the substation Public Works Inspections Lee Thurmond
4 Ottawa Dr Great Bear Ln Wind River Ln 04/17/23 05/19/23 Street Panel and Sidewalk Repair Streets Roy San Miguel
Exported on March 31,2023 11:21:56 AM CDT
2 Street Closure Report: Current Closures smartsheet
_WWF,0M Da"o- Closure End Description partment ff Department Contact
Street/Intersection tsure Start De
e Date
1 Angelina Bend Dr Angelina Bend Dr(1416) Sandy Creek Dr 03/13/23 04/28/23 Street Reconstruction Engineering Dustin Draper
2 Angelina Bend Dr San Gabriel Dr Angelina Bend Dr(1416) 01/17/23 04/28/23 Street Reconstruction Engineering Dustin Draper
3 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
4 Avenue S Prairie St E Dead End South 03/06/23 05/20/23 Utility installations and Engineering Scott Fettig
pavement replacement.
5 Bailey St Willson St Dead End South 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
Bonnie Brae St Scripture St(Roundabout) Oak St 03/27/23 04/07/23 Contractor is performing Engineering Robin Davis
subgrade and pavement
repairs,. Northbound traffic will
6 be moved to the inside
Southbound lane. Southbound
lanes will be converted to two-
way traffic until the northbound
lanes are repaired.
7 Bonnie Brae St Riney Rd Windsor Dr 03/10/23 07/31/23 Urbana at Bonnie Brae:Public Public Works Inspections Jeremiah Tillman-David
Paving
8 Bradshaw St Hickory St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
9 Bradshaw St Wilson St Prairie St E 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
10 Bradshaw St Prairie St E Sycamore St 03/13/23 07/17/23 Utility installations and Engineering Scott Fettig
pavement replacement.
11 Brook Hollow Dr Greenway Or Carriage Hill Rd 10/07/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
Carroll Dr Oak St Mckinney St 12/09/22 04/17/23 Wastewater Collections will be Wastewater Tiffany Sherrane
12 installing a new sewer main
line.
Carroll Dr Oak St Mckinney St 12/09/22 04/17/23 Wastewater Collections will be Wastewater Tiffany Sherrane
13 installing a new sewer main
line.
Clover Ln Robinwood Ln Glenwood Ln 12/09/22 06/01/23 Water Distribution will be Water Tiffany Sherrane
14 installing a new main line and
services.
15 Colonial Dr Thunderbird Dr Dead End South 07/11/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
16 Cordaro Ct Mira Vista Dr End of cul-de-sac 03/20/23 04/07/23 Mill&overlay curb and Streets Jeff Jones
sidewalk
17 Crawford St Hickory St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
18 Elm St Oak St Hickory St 03/20/23 04/07/23 Installation of Diagonal Engineering Robin Davis
Crosswalks/Ramps
19 Eufemia Dr Hermalinda Dr Beatriz Dr 03/13/23 04/29/23 Sidewalk Repair Streets Roy San Miguel
20 Greenway Or Thunderbird Dr Dead End South 07/11/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
21 Greenway Dr Thunderbird Dr Windsor Farms Dr 10/07/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
22 Hattie St Paisley St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
23 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper
24 Hickory St Locust St Pecan St 03/20/23 04/07/23 Installation of Diagonal Engineering Robin Davis
Crosswalks/Ramps
25 Hickory St Exposition St Ruddell St 05/02/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
26 Highland St Locust St Wainwright St 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on March 31,2023 11:22:07 AM CDT
Street/Intersection From To Description Department Department Contact
27 Industrial St Dead End Wye St 01/17/23 04/21/23 Utility replacement Engineering Seth Garcia
28 Jim Christal Rd Western Blvd Masch Branch Rd 04/18/22 04/21/23 Exeter PH2:Paving Jim Christal Private Development Public Kirk Winter
Works Inspections
29 Johnson St Dallas Dr Daughtry St 01/19/23 04/14/23 Atmos working on gas main on Atmos Public Works Stephany Trammell
Collins and Johnson Inspections
30 Johnson St Dallas Dr Wye St 01/17/23 04/21/23 Utility replacement Engineering Seth Garcia
31 Lakewood Dr Greenway Dr Carriage Hill Rd 10/07/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
32 Maddox St Prairie St E Dead End 03/20/23 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
33 May St Henderson Dr Autumn Oak Dr 02/27/23 04/28/23 Street Reconstruction Engineering Dustin Draper
34 Mayhill Rd @ Spencer Rd 03/28/23 04/30/23 Water main tie-in and turn lane Public Works Inspections Ryan Cuba
addition
35 McKinney St Crawford Rd Audra Ln 05/19/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
36 Mill St Allen St Johnson St 01/17/23 05/26/23 Utility Replacement Engineering Seth Garcia
37 Mill St Allen St Robertson St 02/27/23 05/31/23 Utility installation and roadway Engineering Seth Garcia
reconstruction
Mistywood Ln Robinwood Ln Sherwood Ln 12/09/22 06/15/23 Water Distribution will be Water Tiffany Sherrane
38 installing a new main line and
services.
39 Myrtle St Eagle Dr Fort Worth Dr 04/05/23 04/26/23 Relocating gas main and Atmos Zabdiel Mota
service lines.
North Texas Blvd 1-35 E Service Road Highland Park Rd 02/17/23 04/14/23 Widening&Reconstruction, Engineering Robin Davis
Traffic Signal Upgrade. traffic
40 from 135 will need to use Bonnie
Brae Street. project is limited to
one-way traffic from Highland
Park to 135E.
41 Oak St Crawford St Wood St 04/04/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
42 Panhandle St Malone St Aileen St 04/03/23 04/30/23 Driveway work and Street Engineering Dustin Draper
Resurfacing
43 Park Access Rd Windsor Dr Riney Rd 12/15/22 07/31/23 Urbana Bonnie Brae Project: Private Development Public Jeremiah Tillman-David
Water,Sewer,Storm,Paving. Works Inspections
Robinwood Ln Kayewood Dr Emerson Ln 12/09/22 04/28/23 Water Distribution will be Water Tiffany Sherrane
44 installing a new main line and
services.
45 Savannah Trl Whitney Ct Longridge Dr 02/02/23 04/28/23 Street Reconstruction Engineering Dustin Draper
46 Smith St Johnson St Bell Ave 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
47 Smith St Dallas Dr(Hwy 77) Hill St 03/06/23 06/07/23 Utility installations and Engineering Scott Fettig
pavement replacement.
48 State School Rd 1-35E Bowie St 03/06/23 04/06/23 Utilities relocation along East Engineering Aaron Skinner
side of State School Rd
49 Sycamore St Exposition St Crawford St S 03/13/23 07/17/23 Utility installations and Engineering Scott Fettig
pavement replacement.
50 Wainwright St Highland St E Prairie St E 03/13/23 04/07/23 Utility installations and Engineering Scott Fettig
pavement replacement.
51 Whitney Ct Savannah Trl Dead End East 02/02/23 04/28/23 Street Reconstruction Engineering Dustin Draper
52 Wood St McKinney St Hickory St 04/11/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
53 Woodrow Ln McKinney St E Troy H Lagrone Dr 02/20/23 04/22/23 Water tie in Public Works Inspections Ryan Cuba
Exported on March 31,2023 11:22:07 AM CDT
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection From MINEW-T Closure Start Closure End
W Date Date Description Department Department Contact
1 Allen St Mill St Wye St 12/12/22 03/17/23TReconstru
placement and roadway Engineering Seth Garcia
ruction
2 Atlas Dr Hercules Ln Redstone Rd 10/17/22 03/24/23ct Streets Jeremy Wilks
3 Ave A Ave A Greenlee St 11/08/22 03/10/23econstruction Engineering Dustin Draper
4 Boxwood Dr Plumbago Dr Daisy Dr 01/03/23 03/31/23anel and Sidewalk Streets Roy San Miguel
5 Castle Pines Ln Burr Oak Dr @ Intersection 02/27/23 03/16/23 Concrete Street Panel repair Streets Roy San Miguel
6 Crescent St Fulton St Cordell St 01/16/23 03/10/23 installing new storm line along Private Development Lee Thurmond
crescent
7 Crescent St Alice St Carroll Blvd 01/18/23 03/31/23 Street Reconstruction Engineering Dustin Draper
8 Dixon Ln Comer St Cope St 01/23/23 03/02/23 Sidewalk Repair Streets Roy San Miguel
9 Eagle Dr Bernard St Beatty St 02/20/23 03/02/23 Concrete Retaining Wall Repair Streets Roy San Miguel
Elm St Pecan St Oak St 01/23/23 03/17/23 Contractor continues work on Engineering Robin Davis
the pedestrian ramps and
10 diagonal crossings
improvements.-All Way
Crossing
11 Fannin St Welch St Beatty St 02/03/23 03/31/23 Steel Reconstruction Engineering Dustin Draper
12 Kingfisher Ln(325) Meadowlark Ln Oriole Ln 02/20/23 03/02/23 Valley Gutter Repair Streets Roy San Miguel
13 Masch Branch Rd Lovers Ln Hampton Rd 06/24/22 03/31/23 Bridge collapse at 3288 N. Drainage Gabriel Rodriguez
Masch Branch Rd
14 McCormick St Eagle Dr Fannin St 12/27/22 03/10/23 Street Reconstruction Engineering Dustin Draper
Oak St Elm St Cedar St 02/13/23 03/17/23 Contractor is working on the Engineering Robin Davis
15 diagonal crossing on the NE
corner of Oak&Elm. -All Way
Crossing Project
16 Palamino Ct Mustang Dr Dead End West 03/06/23 03/31/23 Sidewalk Repair Streets Roy San Miguel
17 Peach St Locust St Bell Ave 02/14/23 03/01/23 Mill&Overlay Streets Jeff Jones
18 Uland St Rose St Railroad Ave 04/25/22 03/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
19 Wayne St Boyd St Mozingo Rd 11/14/22 03/24/23 Street Reconstruction Engineering Dustin Draper
20 Westward Dr Crestmeadow St Lookout Ln 01/23/23 03/22/23 water line tie in.open cut Private Development Public Lee Thurmond
roadway. Works Inspections
21 Woodland St Brown Dr Cherrywood Ln 01/17/23 03/31/23 Street Reconstruction Engineering Dustin Draper
Exported on March 31,2023 11:22:14 AM CDT