2023/04/28 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR May 1 st - 7th
Street/Intersection From To Description Department Department Contact
1 Carroll Blvd SB Parkway Oak St W 05/08/23 08/14/23 1 Concrete Panel Repair Streets Roy San Miguel
2 Oak St Mounts Ave Fulton St 05/08/23 06/20/23 Wastewater Collections will be installing a new Wastewater Tiffany Sherrane
sewer main lines and services.
3 Ottawa or Great Bear Ln Wind River Ln 05/15/23 06/23/23 Street Panel and Sidewalk Repair Streets Roy San Miguel
Exported on April 28,2023 11:09:07 AM CDT
2 Street Closure Report: Current Closures smartsheet
-UWF,om Da"o- Closure End Description partment ff Department Contact
Street/Intersection tsure Start De
e Date
1 Angelina Bend Dr Angelina Bend Dr(1416) Sandy Creek Dr 03/13/23 05/05/23 Street Reconstruction Engineering Dustin Draper
2 Angelina Bend Dr San Gabriel Dr Angelina Bend Dr(1416) 01/17/23 05/05/23 Street Reconstruction Engineering Dustin Draper
3 Atlas Dr Hercules Ln Redstone Rd 10/17/22 05/05/23 Reconstruct Streets Jeremy Wilks
4 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
5 Avenue S Prairie St E Dead End South 03/06/23 05/20/23 Utility installations and Engineering Scott Fettig
pavement replacement.
6 Bailey St Willson St Dead End South 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
7 Bonnie Brae St Riney Rd Windsor Dr 03/10/23 07/31/23 Urbana at Bonnie Brae:Public Public Works Inspections Jeremiah Tillman-David
Paving
8 Bonnie Brae St N Riney Rd University Dr(HW 380) 04/24/23 05/31/23 (2)8x16 TSV&8"WL Private Development Public Jeremiah Tillman-David
Installation Works Inspections
9 Bradshaw St Hickory St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
10 Bradshaw St Wilson St Prairie St E 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
11 Bradshaw St Prairie St E Sycamore St 03/13/23 07/17/23 Utility installations and Engineering Scott Fettig
pavement replacement.
12 Brook Hollow Dr Greenway Dr Carriage Hill Rd 10/07/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
13 Brown Dr Roberts St Woodland St 03/28/23 05/19/23 Street Reconstruction Engineering Dustin Draper
Carroll Blvd Oak St Mckinney St 12/09/22 05/05/23 Wastewater Collections will be Wastewater Tiffany Sherrane
14 installing a new sewer main
line.
Clover Ln Robinwood Ln Glenwood Ln 12/09/22 06/01/23 Water Distribution will be Water Tiffany Sherrane
15 installing a new main line and
services.
16 Colonial Dr Thunderbird Dr Dead End South 07/11/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
17 Crawford St Hickory St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
18 Greenway Dr Thunderbird Dr Dead End South 07/11/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
19 Greenway Dr Thunderbird Dr Windsor Farms Dr 10/07/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
20 Hattie St Paisley St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
21 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper
22 Hickory St Elm St N Austin St 03/20/23 05/19/23 Installation of Diagonal Engineering Robin Davis
Crosswalks/Ramps
23 Hickory St Exposition St Ruddell St 05/02/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
24 Highland St Locust St Wainwright St 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
25 Jim Christal Rd Western Blvd Masch Branch Rd 04/18/22 05/18/23 Exeter PH2:Paving Jim Christal Private Development Public Kirk Winter
Works Inspections
26 Lakewood Dr Greenway Dr Carriage Hill Rd 10/07/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
27 Locust St Walnut St W Oak St 04/24/23 05/19/23 Installation of Diagonal Engineering Robin Davis
Crosswalks/Ramps
28 Maddox St Prairie St E Dead End 03/20/23 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
29 Mayhill Rd @ Spencer Rd 03/28/23 05/30/23 Water main tie-in and turn lane Public Works Inspections Ryan Cuba
addition
Exported on April 28,2023 11:09:18 AM CDT
Street/Intersection From To Closure Start Description Department Department Contact
Date
30 McKinney St Crawford Rd Audra Ln 05/19/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
31 Mill St Allen St Johnson St 01/17/23 05/26/23 Utility Replacement Engineering Seth Garcia
32 Mill St Allen St Robertson St 02/27/23 05/31/23 Utility installation and roadway Engineering Seth Garcia
reconstruction
Mistywood Ln Robinwood Ln Sherwood Ln 12/09/22 06/15/23 Water Distribution will be Water Tiffany Sherrane
33 installing a new main line and
services.
34 Myrtle St Eagle Dr Fort Worth Dr 04/05/23 06/09/23 Relocating gas main and Atmos Zabdiel Mote
service lines.
35 Oak St Crawford St Wood St 04/04/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
36 Park Access Rd Windsor Dr Riney Rd 12/15/22 07/31/23 Urbana Bonnie Brae Project: Private Development Public Jeremiah Tillman-David
Water,Sewer,Storm,Paving. Works Inspections
37 Riesling Dr Rhone Dr Merlot Dr 05/01/23 06/23/23 Concrete Panel and Sidewalk Streets Roy San Miguel
Repair
38 Smith St Johnson St Bell Ave 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
39 Smith St Dallas Dr(Hwy 77) Hill St 03/06/23 06/07/23 Utility installations and Engineering Scott Fettig
pavement replacement.
40 State School Rd 1-35E Bowie St 03/06/23 05/04/23 Utilities relocation along East Engineering Aaron Skinner
side of State School Rd
41 Sycamore St Industrial St Wainwright St 04/24/23 07/11/23 Roadway&Utilities Engineering Seth Garcia
42 Sycamore St Exposition St Crawford St S 03/13/23 07/17/23 Utility installations and Engineering Scott Fettig
pavement replacement.
43 Vista Verde St Montecito Rd West to dead end 04/06/23 05/05/23 Will and Overlay Streets Jeff Jones
44 Wainwright St Highland St E Prairie St E 03/13/23 05/12/23 Utility installations and Engineering Scott Fettig
pavement replacement.
45 Wainwright St Prairie St Sycamore St 04/24/23 07/11/23 Roadway,utilities Engineering Seth Garcia
46 Wood St McKinney St Hickory St 04/11/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
47 Woodland St Brown Dr Cherrywood Ln 03/01/23 05/19/23 Street Reconstruction Engineering Dustin Draper
48 Woodrow Ln McKinney St E Troy H Lagrone Dr 02/20/23 05/31/23 Water tie in Public Works Inspections Ryan Cuba
Exported on April 28,2023 11:09:18 AM CDT
3 Street Closure Report: Completed Closures smartsheet
Intersection • • Date
Date
Closure End Description Department Department
1 Avenue H Stella St Hickory St 04/17/23 04/28/23 Installing underground utilities Public Works Inspections Lee Thurmond
open cut roadway
Bonnie Brae St Scripture St(Roundabout) Oak St 03/27/23 04/07/23 Contractor is performing Engineering Robin Davis
subgrade and pavement
repairs,. Northbound traffic will
2 be moved to the inside
Southbound lane. Southbound
lanes will be converted to two-
way traffic until the northbound
lanes are repaired.
3 Boxwood Dr Plumbago Dr Daisy Dr 01/03/23 03/31/23 Street Panel and Sidewalk Streets Roy San Miguel
Repair
4 Cordero Ct Mira Vista Dr End of cul-de-sac 03/20/23 04/07/23 Mill&overlay curb and Streets Jeff Jones
sidewalk
5 Crescent St Alice St Carroll Blvd 01/18/23 03/31/23 Street Reconstruction Engineering Dustin Draper
6 Elm St Oak St Hickory St 03/20/23 04/21/23 Installation of Diagonal Engineering Robin Davis
Crosswalks/Ramps
7 Eufemia Dr Hermalinda Dr Beatriz Dr 03/13/23 04/25/23 Sidewalk Repair Streets Roy San Miguel
8 Fannin St Welch St Beatty St 02/03/23 03/31/23 Steet Reconstruction Engineering Dustin Draper
9 Industrial St Dead End Wye St 01/17/23 04/21/23 Utility replacement Engineering Seth Garcia
10 Johnson St Dallas Dr Daughtry St 01/19/23 04/14/23 Atmos working on gas main on Atmos Public Works Stephany Trammell
Collins and Johnson Inspections
11 Johnson St Dallas Dr Wye St 01/17/23 04/21/23 Utility replacement Engineering Seth Garcia
12 Masch Branch Rd Lovers Ln Hampton Rd 06/24/22 03/31/23 Bridge collapse at 3288 N. Drainage Gabriel Rodriguez
Masch Branch Rd
13 May St Henderson Dr Autumn Oak Dr 02/27/23 04/28/23 Street Reconstruction Engineering Dustin Draper
North Texas Blvd 1-35 E Service Road Highland Park Rd 02/17/23 04/28/23 Contractor will be working the Engineering Robin Davis
Traffic Signal Upgrade and
switchover. traffic from 135 will
14 need to use Bonnie Brae Street.
project is limited to one-way
traffic from Highland Park to
135E.
15 Oak St Thomas St Bonnie Brae St 04/17/23 04/28/23 Installing screen walls at the Public Works Inspections Lee Thurmond
substation
16 Palamino Ct Mustang Dr Dead End West 03/06/23 03/31/23 Sidewalk Repair Streets Roy San Miguel
17 Panhandle St Malone St Aileen St 04/03/23 04/30/23 Driveway work and Street Engineering Dustin Draper
Resurfacing
18 Prairie St E Wainwright St Bell Ave D 04/24/23 04/28/23 Utility installations and Engineering Scott Fettig
pavement replacement.
Robinwood Ln Kayewood Dr Emerson Ln 12/09/22 04/28/23 Water Distribution will be Water Tiffany Sherrane
19 installing a new main line and
services.
20 Savannah Trl Whitney Ct Longridge Dr 02/02/23 04/28/23 Street Reconstruction Engineering Dustin Draper
21 Whitney Ct Savannah Trl Dead End East 02/02/23 04/28/23 Street Reconstruction Engineering Dustin Draper
22 Woodland St Brown Dr Cherrywood Ln 01/17/23 03/31/23 Street Reconstruction Engineering Dustin Draper
Exported on April 28,2023 11:09:28 AM CDT