Loading...
2023/04/28 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR May 1 st - 7th Street/Intersection From To Description Department Department Contact 1 Carroll Blvd SB Parkway Oak St W 05/08/23 08/14/23 1 Concrete Panel Repair Streets Roy San Miguel 2 Oak St Mounts Ave Fulton St 05/08/23 06/20/23 Wastewater Collections will be installing a new Wastewater Tiffany Sherrane sewer main lines and services. 3 Ottawa or Great Bear Ln Wind River Ln 05/15/23 06/23/23 Street Panel and Sidewalk Repair Streets Roy San Miguel Exported on April 28,2023 11:09:07 AM CDT 2 Street Closure Report: Current Closures smartsheet -UWF,om Da"o- Closure End Description partment ff Department Contact Street/Intersection tsure Start De e Date 1 Angelina Bend Dr Angelina Bend Dr(1416) Sandy Creek Dr 03/13/23 05/05/23 Street Reconstruction Engineering Dustin Draper 2 Angelina Bend Dr San Gabriel Dr Angelina Bend Dr(1416) 01/17/23 05/05/23 Street Reconstruction Engineering Dustin Draper 3 Atlas Dr Hercules Ln Redstone Rd 10/17/22 05/05/23 Reconstruct Streets Jeremy Wilks 4 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 07/10/23 Utility installations and Engineering Scott Fettig pavement replacement. 5 Avenue S Prairie St E Dead End South 03/06/23 05/20/23 Utility installations and Engineering Scott Fettig pavement replacement. 6 Bailey St Willson St Dead End South 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 7 Bonnie Brae St Riney Rd Windsor Dr 03/10/23 07/31/23 Urbana at Bonnie Brae:Public Public Works Inspections Jeremiah Tillman-David Paving 8 Bonnie Brae St N Riney Rd University Dr(HW 380) 04/24/23 05/31/23 (2)8x16 TSV&8"WL Private Development Public Jeremiah Tillman-David Installation Works Inspections 9 Bradshaw St Hickory St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 10 Bradshaw St Wilson St Prairie St E 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 11 Bradshaw St Prairie St E Sycamore St 03/13/23 07/17/23 Utility installations and Engineering Scott Fettig pavement replacement. 12 Brook Hollow Dr Greenway Dr Carriage Hill Rd 10/07/22 07/10/23 Utility installations and Engineering Scott Fettig pavement replacement. 13 Brown Dr Roberts St Woodland St 03/28/23 05/19/23 Street Reconstruction Engineering Dustin Draper Carroll Blvd Oak St Mckinney St 12/09/22 05/05/23 Wastewater Collections will be Wastewater Tiffany Sherrane 14 installing a new sewer main line. Clover Ln Robinwood Ln Glenwood Ln 12/09/22 06/01/23 Water Distribution will be Water Tiffany Sherrane 15 installing a new main line and services. 16 Colonial Dr Thunderbird Dr Dead End South 07/11/22 07/10/23 Utility installations and Engineering Scott Fettig pavement replacement. 17 Crawford St Hickory St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 18 Greenway Dr Thunderbird Dr Dead End South 07/11/22 07/10/23 Utility installations and Engineering Scott Fettig pavement replacement. 19 Greenway Dr Thunderbird Dr Windsor Farms Dr 10/07/22 07/10/23 Utility installations and Engineering Scott Fettig pavement replacement. 20 Hattie St Paisley St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 21 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper 22 Hickory St Elm St N Austin St 03/20/23 05/19/23 Installation of Diagonal Engineering Robin Davis Crosswalks/Ramps 23 Hickory St Exposition St Ruddell St 05/02/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 24 Highland St Locust St Wainwright St 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 25 Jim Christal Rd Western Blvd Masch Branch Rd 04/18/22 05/18/23 Exeter PH2:Paving Jim Christal Private Development Public Kirk Winter Works Inspections 26 Lakewood Dr Greenway Dr Carriage Hill Rd 10/07/22 07/10/23 Utility installations and Engineering Scott Fettig pavement replacement. 27 Locust St Walnut St W Oak St 04/24/23 05/19/23 Installation of Diagonal Engineering Robin Davis Crosswalks/Ramps 28 Maddox St Prairie St E Dead End 03/20/23 07/10/23 Utility installations and Engineering Scott Fettig pavement replacement. 29 Mayhill Rd @ Spencer Rd 03/28/23 05/30/23 Water main tie-in and turn lane Public Works Inspections Ryan Cuba addition Exported on April 28,2023 11:09:18 AM CDT Street/Intersection From To Closure Start Description Department Department Contact Date 30 McKinney St Crawford Rd Audra Ln 05/19/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 31 Mill St Allen St Johnson St 01/17/23 05/26/23 Utility Replacement Engineering Seth Garcia 32 Mill St Allen St Robertson St 02/27/23 05/31/23 Utility installation and roadway Engineering Seth Garcia reconstruction Mistywood Ln Robinwood Ln Sherwood Ln 12/09/22 06/15/23 Water Distribution will be Water Tiffany Sherrane 33 installing a new main line and services. 34 Myrtle St Eagle Dr Fort Worth Dr 04/05/23 06/09/23 Relocating gas main and Atmos Zabdiel Mote service lines. 35 Oak St Crawford St Wood St 04/04/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 36 Park Access Rd Windsor Dr Riney Rd 12/15/22 07/31/23 Urbana Bonnie Brae Project: Private Development Public Jeremiah Tillman-David Water,Sewer,Storm,Paving. Works Inspections 37 Riesling Dr Rhone Dr Merlot Dr 05/01/23 06/23/23 Concrete Panel and Sidewalk Streets Roy San Miguel Repair 38 Smith St Johnson St Bell Ave 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 39 Smith St Dallas Dr(Hwy 77) Hill St 03/06/23 06/07/23 Utility installations and Engineering Scott Fettig pavement replacement. 40 State School Rd 1-35E Bowie St 03/06/23 05/04/23 Utilities relocation along East Engineering Aaron Skinner side of State School Rd 41 Sycamore St Industrial St Wainwright St 04/24/23 07/11/23 Roadway&Utilities Engineering Seth Garcia 42 Sycamore St Exposition St Crawford St S 03/13/23 07/17/23 Utility installations and Engineering Scott Fettig pavement replacement. 43 Vista Verde St Montecito Rd West to dead end 04/06/23 05/05/23 Will and Overlay Streets Jeff Jones 44 Wainwright St Highland St E Prairie St E 03/13/23 05/12/23 Utility installations and Engineering Scott Fettig pavement replacement. 45 Wainwright St Prairie St Sycamore St 04/24/23 07/11/23 Roadway,utilities Engineering Seth Garcia 46 Wood St McKinney St Hickory St 04/11/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 47 Woodland St Brown Dr Cherrywood Ln 03/01/23 05/19/23 Street Reconstruction Engineering Dustin Draper 48 Woodrow Ln McKinney St E Troy H Lagrone Dr 02/20/23 05/31/23 Water tie in Public Works Inspections Ryan Cuba Exported on April 28,2023 11:09:18 AM CDT 3 Street Closure Report: Completed Closures smartsheet Intersection • • Date Date Closure End Description Department Department 1 Avenue H Stella St Hickory St 04/17/23 04/28/23 Installing underground utilities Public Works Inspections Lee Thurmond open cut roadway Bonnie Brae St Scripture St(Roundabout) Oak St 03/27/23 04/07/23 Contractor is performing Engineering Robin Davis subgrade and pavement repairs,. Northbound traffic will 2 be moved to the inside Southbound lane. Southbound lanes will be converted to two- way traffic until the northbound lanes are repaired. 3 Boxwood Dr Plumbago Dr Daisy Dr 01/03/23 03/31/23 Street Panel and Sidewalk Streets Roy San Miguel Repair 4 Cordero Ct Mira Vista Dr End of cul-de-sac 03/20/23 04/07/23 Mill&overlay curb and Streets Jeff Jones sidewalk 5 Crescent St Alice St Carroll Blvd 01/18/23 03/31/23 Street Reconstruction Engineering Dustin Draper 6 Elm St Oak St Hickory St 03/20/23 04/21/23 Installation of Diagonal Engineering Robin Davis Crosswalks/Ramps 7 Eufemia Dr Hermalinda Dr Beatriz Dr 03/13/23 04/25/23 Sidewalk Repair Streets Roy San Miguel 8 Fannin St Welch St Beatty St 02/03/23 03/31/23 Steet Reconstruction Engineering Dustin Draper 9 Industrial St Dead End Wye St 01/17/23 04/21/23 Utility replacement Engineering Seth Garcia 10 Johnson St Dallas Dr Daughtry St 01/19/23 04/14/23 Atmos working on gas main on Atmos Public Works Stephany Trammell Collins and Johnson Inspections 11 Johnson St Dallas Dr Wye St 01/17/23 04/21/23 Utility replacement Engineering Seth Garcia 12 Masch Branch Rd Lovers Ln Hampton Rd 06/24/22 03/31/23 Bridge collapse at 3288 N. Drainage Gabriel Rodriguez Masch Branch Rd 13 May St Henderson Dr Autumn Oak Dr 02/27/23 04/28/23 Street Reconstruction Engineering Dustin Draper North Texas Blvd 1-35 E Service Road Highland Park Rd 02/17/23 04/28/23 Contractor will be working the Engineering Robin Davis Traffic Signal Upgrade and switchover. traffic from 135 will 14 need to use Bonnie Brae Street. project is limited to one-way traffic from Highland Park to 135E. 15 Oak St Thomas St Bonnie Brae St 04/17/23 04/28/23 Installing screen walls at the Public Works Inspections Lee Thurmond substation 16 Palamino Ct Mustang Dr Dead End West 03/06/23 03/31/23 Sidewalk Repair Streets Roy San Miguel 17 Panhandle St Malone St Aileen St 04/03/23 04/30/23 Driveway work and Street Engineering Dustin Draper Resurfacing 18 Prairie St E Wainwright St Bell Ave D 04/24/23 04/28/23 Utility installations and Engineering Scott Fettig pavement replacement. Robinwood Ln Kayewood Dr Emerson Ln 12/09/22 04/28/23 Water Distribution will be Water Tiffany Sherrane 19 installing a new main line and services. 20 Savannah Trl Whitney Ct Longridge Dr 02/02/23 04/28/23 Street Reconstruction Engineering Dustin Draper 21 Whitney Ct Savannah Trl Dead End East 02/02/23 04/28/23 Street Reconstruction Engineering Dustin Draper 22 Woodland St Brown Dr Cherrywood Ln 01/17/23 03/31/23 Street Reconstruction Engineering Dustin Draper Exported on April 28,2023 11:09:28 AM CDT