Loading...
2023/05/12 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR May 15th - 21 st Street/Intersection Department Contact Oak St Mounts Ave Fulton St 06/30/23 07/28/23 Wastewater Collections will be installing a new Wastewater Tiffany Sherrane sewer main lines and services. 2 Ottawa or Great Bear Ln Wind River Ln 05/29/23 07/06/23 Street Panel and Sidewalk Repair Streets Roy San Miguel Exported on May 12,2023 11:22:33 AM CDT 2 Street Closure Report: Current Closures smartsheet _WWF,0M Da"o- Closure End Description partment ff Department Contact Street/Intersection tsure Start De e Date 1 Angelina Bend Dr Angelina Bend Dr(1416) Sandy Creek Dr 03/13/23 05/31/23 Street Reconstruction Engineering Dustin Draper 2 Angelina Bend Dr San Gabriel Dr Angelina Bend Dr(1416) 01/17/23 05/31/23 Street Reconstruction Engineering Dustin Draper 3 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 07/10/23 Utility installations and Engineering Scott Fettig pavement replacement. 4 Avenue S Prairie St E Dead End South 03/06/23 05/20/23 Utility installations and Engineering Scott Fettig pavement replacement. 5 Bailey St Willson St Dead End South 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 6 Bonnie Brae St Riney Rd Windsor Dr 03/10/23 07/31/23 Urbana at Bonnie Brae:Public Public Works Inspections Jeremiah Tillman-David Paving 7 Bonnie Brae St N Riney Rd University Dr(HW 380) 04/24/23 05/31/23 (2)8x16 TSV&8"WL Private Development Public Jeremiah Tillman-David Installation Works Inspections 8 Bradshaw St Hickory St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 9 Bradshaw St Wilson St Prairie St E 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 10 Bradshaw St Prairie St E Sycamore St 03/13/23 07/17/23 Utility installations and Engineering Scott Fettig pavement replacement. 11 Brook Hollow Dr Greenway Dr Carriage Hill Rd 10/07/22 07/10/23 Utility installations and Engineering Scott Fettig pavement replacement. 12 Brown Dr Roberts St Woodland St 03/28/23 05/19/23 Street Reconstruction Engineering Dustin Draper 13 Carroll Blvd SB Parkway Oak St W 05/08/23 08/14/23 Concrete Panel Repair Streets Roy San Miguel 14 Churchill Dr Nottingham Burning Tree Ln 05/15/23 06/16/23 Pipe bursting sewer pipe Public Works Inspections Armando Beltran Clover Ln Robinwood Ln Glenwood Ln 12/09/22 06/15/23 Water Distribution will be Water Tiffany Sherrane 15 installing a new main line and services. 16 Colonial Dr Thunderbird Dr Dead End South 07/11/22 07/10/23 Utility installations and Engineering Scott Fettig pavement replacement. 17 Crawford St Hickory St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 18 Crescent St @ Fulton St intersection 05/08/23 05/19/23 Replacing public utilities in Public Works Inspections Lee Thurmond roadway/intersection Dallas Dr(Hwy 77) @ RR crossing bridge appx.300'south of Eagle Dr 05/17/23 05/17/23 Close HWY 77 to perform Joe Prado 19 maintenance to the railroad bridge 20 Fulton St Crescent St Cordell St 05/08/23 05/19/23 Replacing public utilities in Public Works Inspections Lee Thurmond roadway/intersection 21 Greenway Dr Thunderbird Dr Dead End South 07/11/22 07/10/23 Utility installations and Engineering Scott Fettig pavement replacement. 22 Greenway Dr Thunderbird Dr Windsor Farms Dr 10/07/22 07/10/23 Utility installations and Engineering Scott Fettig i pavement replacement. 23 Hattie St Paisley St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 24 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper 25 Hickory St Elm St N Austin St 03/20/23 05/19/23 Installation of Diagonal Engineering Robin Davis Crosswalks/Ramps 26 Hickory St Exposition St Ruddell St 05/02/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 27 Highland St Locust St Wainwright St 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 28 Lakewood Dr Greenway Dr Carriage Hill Rd 10/07/22 07/10/23 Utility installations and Engineering Scott Fettig pavement replacement. 29 Locust St Walnut St W Oak St 04/24/23 05/19/23 Installation of Diagonal Engineering Robin Davis Crosswalks/Ramps Exported on May 12,2023 11:22:45 AM CDT Street/Intersection From To Description Department Department Contact 30 Maddox St Prairie St E Dead End 03/20/23 07/10/23 Utility installations and Engineering Scott Fettig pavement replacement. 31 Mayhill Rd @ Spencer Rd 03/28/23 05/30/23 Water main tie-in and turn lane Public Works Inspections Ryan Cuba addition 32 McKinney St Crawford Rd Audra Ln 05/19/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 33 McKinney St Mayhill Rd Ryan Rd 05/04/23 06/22/23 Turn lane Public Works Inspections Ryan Cuba 34 Mill St Allen St Johnson St 01/17/23 05/26/23 Utility Replacement Engineering Seth Garcia 35 Mill St Allen St Robertson St 02/27/23 05/31/23 Utility installation and roadway Engineering Seth Garcia reconstruction Mistywood Ln Robinwood Ln Sherwood Ln 12/09/22 06/15/23 Water Distribution will be Water Tiffany Sherrane 36 installing a new main line and services. 37 Myrtle St Eagle Dr Fort Worth Dr 04/05/23 06/09/23 Relocating gas main and Atmos Zabdiel Mota service lines. 38 Oak St Crawford St Wood St 04/04/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 39 Park Access Rd Windsor Dr Riney Rd 12/15/22 07/31/23 Urbana Bonnie Brae Project: Private Development Public Jeremiah Tillman-David Water,Sewer,Storm,Paving. Works Inspections 40 Riesling Dr Rhone Dr Merlot Dr 05/01/23 06/23/23 Concrete Panel and Sidewalk Streets Roy San Miguel Repair Robinwood Ln Kayewood Dr Emerson Ln 12/09/22 06/15/23 Water Distribution will be Water Tiffany Sherrane 41 installing a new main line and services. 42 Sandy Creek Angelina Bend Angelina Bend 05/18/23 06/23/23 Street Reconstruction Engineering Dustin Draper 43 Smith St Johnson St Bell Ave 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig pavement replacement. 44 Smith St Dallas Dr(Hwy 77) Hill St 03/06/23 06/07/23 Utility installations and Engineering Scott Fettig pavement replacement. 45 State School Rd 1-35E Bowie St 03/06/23 05/19/23 Utilities relocation along East Engineering Aaron Skinner side of State School Rd 46 Sycamore St Industrial St Wainwright St 04/24/23 07/11/23 Roadway&Utilities Engineering Seth Garcia 47 Sycamore St Exposition St Crawford St S 03/13/23 07/17/23 Utility installations and Engineering Scott Fettig pavement replacement. 48 Vista Verde St Montecito Rd West to dead end 04/06/23 05/19/23 Mill and Overlay Streets Jeff Jones 49 Wainwright St Highland St E Prairie St E 03/13/23 06/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 50 Wainwright St Prairie St Sycamore St 04/24/23 07/11/23 Roadway,utilities Engineering Seth Garcia 51 Wood St McKinney St Hickory St 04/11/22 05/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 52 Woodland St Brown Dr Cherrywood Ln 03/01/23 05/19/23 Street Reconstruction Engineering Dustin Draper 53 Woodrow Ln McKinney St E Troy H Lagrone Dr 02/20/23 05/31/23 Water tie in Public Works Inspections Ryan Cuba Exported on May 12,2023 11:22:45 AM CDT 3 Street Closure Report: Completed Closures smartsheet Street/Intersection From"r—W Closure Start Closure End Description Department Department Contact Date Date 1 Atlas Dr Hercules Ln Redstone Rd 10/17/22 05/05/23 Reconstruct Streets Jeremy Wilks 2 Avenue H Stella St Hickory St 04/17/23 04/28/23 Installing underground utilities Public Works Inspections Lee Thurmond open cut roadway Carroll Blvd Oak St Mckinney St 12/09/22 05/05/23 Wastewater Collections will be Wastewater Tiffany Sherrane installing a new sewer main line. 4 Elm St Oak St Hickory St 03/20/23 04/21/23 Installation of Diagonal Engineering Robin Davis Crosswalks/Ramps 5 Eufemia Dr Hermalinda Or Beatriz Dr 03/13/23 04/25/23 Sidewalk Repair Streets Roy San Miguel 6 Industrial St Dead End Wye St 01/17/23 04/21/23 Utility replacement Engineering Seth Garcia 7 Jim Christal Rd Western Blvd Masch Branch Rd 04/18/22 05/10/23 Exeter PH2:Paving Jim Christal Private Development Public Kirk Winter Works Inspections 8 Johnson St Dallas Dr Daughtry St 01/19/23 04/14/23 Atmos working on gas main on Atmos Public Works Stephany Trammell Collins and Johnson Inspections 9 Johnson St Dallas Dr Wye St 01/17/23 04/21/23 Utility replacement Engineering Seth Garcia 10 May St Henderson Dr Autumn Oak Dr 02/27/23 04/28/23 Street Reconstruction Engineering Dustin Draper North Texas Blvd 1-35 E Service Road Highland Park Rd 02/17/23 04/28/23 Contractor will be working the Engineering Robin Davis Traffic Signal Upgrade and switchover. traffic from 135 will 11 need to use Bonnie Brae Street. project is limited to one-way traffic from Highland Park to 135E. 12 Oak St Thomas St Bonnie Brae St 04/17/23 04/28/23 Installing screen walls at the Public Works Inspections Lee Thurmond substation 13 Panhandle St Malone St Aileen St 04/03/23 04/30/23 Driveway work and Street Engineering Dustin Draper Resurfacing 14 Prairie St E Wainwright St Bell Ave D 04/24/23 04/28/23 Utility installations and Engineering Scott Fettig pavement replacement. 15 Savannah Trl Whitney Ct Longridge Dr 02/02/23 04/28/23 Street Reconstruction Engineering Dustin Draper 16 Whitney Ct Savannah Trl Dead End East 02/02/23 04/28/23 Street Reconstruction Engineering Dustin Draper Exported on May 12,2023 11:23:19 AM CDT