2023/05/19 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR May 22nd - 28th
Street/Intersection From Department Contact
1 Oak St Mounts Ave Fulton St 06/30/23 07/28/23 Wastewater Collections will be installing a new Wastewater Tiffany Sherrane
sewer main lines and services.
2 Oak St Thomas St Bonnie Brae St 06/08/23 06/16/23 Work on the DIME substation Public Works Inspections Lee Thurmond
3 Ottawa Dr Great Bear Ln Wind River Ln 05/29/23 07/06/23 Street Panel and Sidewalk Repair Streets Roy San Miguel
Exported on May 19,2023 11:34:45 AM CDT
2 Street Closure Report: Current Closures smartsheet
_WWF,0M Da"o- Closure End Description partment ff Department Contact
Street/Intersection tsure Start De
e Date
1 Angelina Bend Dr Angelina Bend Dr(1416) Sandy Creek Dr 03/13/23 05/31/23 Street Reconstruction Engineering Dustin Draper
2 Angelina Bend Dr San Gabriel Dr Angelina Bend Dr(1416) 01/17/23 05/31/23 Street Reconstruction Engineering Dustin Draper
3 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
4 Avenue S Prairie St Dead End South 03/06/23 07/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
5 Bailey St Willson St Dead End South 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
6 Bonnie Brae St Riney Rd Windsor Dr 03/10/23 07/31/23 Urbana at Bonnie Brae:Public Public Works Inspections Jeremiah Tillman-David
Paving
7 Bonnie Brae St Riney Rd University Dr(HW 380) 04/24/23 05/31/23 (2)8x16 TSV&8"WL Private Development Public Jeremiah Tillman-David
Installation Works Inspections
8 Bradshaw St Hickory St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
9 Bradshaw St Wilson St Prairie St 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
10 Bradshaw St Prairie St Sycamore St 03/13/23 07/17/23 Utility installations and Engineering Scott Fettig
pavement replacement.
11 Brook Hollow Dr Greenway Dr Carriage Hill Rd 10/07/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
12 Brown Dr Roberts St Woodland St 03/28/23 05/23/23 Street Reconstruction Engineering Dustin Draper
13 Carroll Blvd SB Parkway St Oak St 05/08/23 08/14/23 Concrete Panel Repair Streets Roy San Miguel
14 Churchill Dr Nottingham Dr Burning Tree Ln 05/15/23 06/16/23 Pipe bursting sewer pipe Public Works Inspections Armando Beltran
Clover Ln Robinwood Ln Glenwood Ln 12/09/22 06/15/23 Water Distribution will be Water Tiffany Sherrane
15 installing a new main line and
services.
16 Colonial Dr Thunderbird Dr Dead End South 07/11/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
17 Crawford St Hickory St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
18 Crescent St @ Fulton St intersection 05/08/23 06/02/23 Replacing public utilities in Public Works Inspections Lee Thurmond
roadway/intersection
19 Fulton St Crescent St Cordell St 05/08/23 06/02/23 Replacing public utilities in Public Works Inspections Lee Thurmond
roadway/intersection
20 Greenway Dr Thunderbird Dr Dead End South 07/11/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
21 Greenway Dr Thunderbird Dr Windsor Farms Dr 10/07/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
22 Hattie St Paisley St McKinney St 03/21/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
23 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper
24 Hickory St Elm St N Austin St 03/20/23 05/26/23 Installation of Diagonal Engineering Robin Davis
Crosswalks/Ramps
25 Hickory St Exposition St Ruddell St 05/02/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
26 Highland St Locust St Wainwright St 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
27 Lakewood Dr Greenway Dr Carriage Hill Rd 10/07/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
28 Locust St Walnut St Oak St 04/24/23 05/26/23 Installation of Diagonal Engineering Robin Davis
Crosswalks/Ramps
29 Maddox St Prairie St Dead End 03/20/23 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
30 Mayhill Rd @ Spencer Rd 03/28/23 05/30/23 Water main tie-in and turn lane Public Works Inspections Ryan Cuba
addition
Exported on May 19,2023 11:34:53 AM CDT
I I Closure Start
Street/Intersection From Date Description Department Department Contact
31 McKinney St Crawford Rd Audra Ln 05/19/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
32 McKinney St Mayhill Rd Ryan Rd 05/04/23 06/22/23 Turn lane Public Works Inspections Ryan Cuba
33 Mill St Allen St Johnson St 01/17/23 05/26/23 Utility Replacement Engineering Seth Garcia
34 Mill St Allen St Robertson St 02/27/23 05/31/23 Utility installation and roadway Engineering Seth Garcia
reconstruction
Mistywood Ln Robinwood Ln Sherwood Ln 12/09/22 06/15/23 Water Distribution will be Water Tiffany Sherrane
35 installing a new main line and
services.
36 Myrtle St Eagle Dr Fort Worth Dr 04/05/23 06/09/23 Relocating gas main and Atmos Zabdiel Mote
service lines.
37 Oak St Crawford St Wood St 04/04/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
38 Park Access Rd Windsor Dr Riney Rd 12/15/22 07/31/23 Urbana Bonnie Brae Project: Private Development Public Jeremiah Tillman-David
Water,Sewer,Storm,Paving. Works Inspections
39 Riesling Dr Rhone Dr Merlot Dr 05/01/23 06/23/23 Concrete Panel and Sidewalk Streets Roy San Miguel
Repair
Robinwood Ln Kayewood Dr Emerson Ln 12/09/22 06/15/23 Water Distribution will be Water Tiffany Sherrane
40 installing a new main line and
services.
41 Sandy Creek Angelina Bend Angelina Bend 05/18/23 06/23/23 Street Reconstruction Engineering Dustin Draper
42 Smith St Johnson St Bell Ave 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
43 Smith St Dallas Dr(Hwy 77) Hill St 03/06/23 06/07/23 Utility installations and Engineering Scott Fettig
pavement replacement.
44 Sycamore St Industrial St Wainwright St 04/24/23 07/11/23 Roadway&Utilities Engineering Seth Garcia
45 Sycamore St Exposition St Crawford St 03/13/23 07/17/23 Utility installations and Engineering Scott Fettig
pavement replacement.
46 Vista Verde St Montecito Rd Dead End West 04/06/23 06/02/23 Mill and Overlay Streets Jeff Jones
47 Wainwright St Highland St Prairie St 03/13/23 06/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
48 Wainwright St Prairie St Sycamore St 04/24/23 07/11/23 Roadway,utilities Engineering Seth Garcia
49 Wood St McKinney St Hickory St 04/11/22 05/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
50 Woodland St Brown Dr Cherrywood Ln 03/01/23 05/23/23 Street Reconstruction Engineering Dustin Draper
51 Woodrow Ln McKinney St Troy H Lagrone Dr 02/20/23 05/31/23 Water tie in Public Works Inspections Ryan Cuba
Exported on May 19,2023 11:34:53 AM CDT
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection From"r—W Closure Start Closure End Description Department Department Contact
Date Date
1 Atlas Dr Hercules Ln Redstone Rd 10/17/22 05/05/23 Reconstruct Streets Jeremy Wilks
2 Avenue H Stella St Hickory St 04/17/23 04/28/23 Installing underground utilities Public Works Inspections Lee Thurmond
open cut roadway
Carroll Blvd Oak St Mckinney St 12/09/22 05/05/23 Wastewater Collections will be Wastewater Tiffany Sherrane
3 installing a new sewer main
line.
Dallas Dr(Hwy 77) @ RR crossing bridge appx.300'south of Eagle Dr 05/17/23 05/17/23 Close HWY 77 to perform Joe Prado
4 maintenance to the railroad
bridge
5 Elm St Oak St Hickory St 03/20/23 04/21/23 Installation of Diagonal Engineering Robin Davis
Crosswalks/Ramps
6 Eufemia Dr Hermalinda Dr Beatriz Dr 03/13/23 04/25/23 Sidewalk Repair Streets Roy San Miguel
7 Industrial St Dead End Wye St 01/17/23 04/21/23 Utility replacement Engineering Seth Garcia
8 Jim Christal Rd Western Blvd Masch Branch Rd 04/18/22 05/10/23 Exeter PH2:Paving Jim Christal Private Development Public Kirk Winter
Works Inspections
9 Johnson St Dallas Dr Wye St 01/17/23 04/21/23 Utility replacement Engineering Seth Garcia
10 May St Henderson Dr Autumn Oak Dr 02/27/23 04/28/23 Street Reconstruction Engineering Dustin Draper
North Texas Blvd 1-35 E Service Road Highland Park Rd 02/17/23 04/28/23 Contractor will be working the Engineering Robin Davis
Traffic Signal Upgrade and
switchover. traffic from 135 will
11 need to use Bonnie Brae Street.
project is limited to one-way
traffic from Highland Park to
135E.
12 Oak St Thomas St Bonnie Brae St 04/17/23 04/28/23 Installing screen walls at the Public Works Inspections Lee Thurmond
substation
13 Panhandle St Malone St Aileen St 04/03/23 04/30/23 Driveway work and Street Engineering Dustin Draper
Resurfacing
14 Prairie St E Wainwright St Bell Ave D 04/24/23 04/28/23 Utility installations and Engineering Scott Fettig
pavement replacement.
15 Savannah Trl Whitney Ct Longridge Dr 02/02/23 04/28/23 Street Reconstruction Engineering Dustin Draper
16 State School Rd 1-35E Bowie St 03/06/23 05/19/23 Utilities relocation along East Engineering Aaron Skinner
side of State School Rd
17 Whitney Ct Savannah Trl Dead End East 02/02/23 04/28/23 Street Reconstruction Engineering Dustin Draper
Exported on May 19,2023 11:35:02 AM CDT