2023/05/26 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR May 29th - June 4th
Street/Intersection From To Description Department Department Contact
1 Oak St Thomas St Bonnie Brae St 06/08/23 06/16/23 1 Work on the DME substation Public Works Inspections Lee Thurmond
2 Oak St Mounts Ave Fulton St 06/30/23 07/28/23 Wastewater Collections will be installing a new Wastewater Tiffany Shamans
sewer main lines and services.
Exported on May 26,2023 11:29:58 AM CDT
2 Street Closure Report: Current Closures smartsheet
_WWF,0M Da"o- Closure End Description partment ff Department Contact
Street/Intersection tsure Start De
e Date
1 Angelina Bend Dr Angelina Bend Dr(1416) Sandy Creek Dr 03/13/23 05/31/23 Street Reconstruction Engineering Dustin Draper
2 Angelina Bend Dr San Gabriel Dr Angelina Bend Dr(1416) 01/17/23 05/31/23 Street Reconstruction Engineering Dustin Draper
3 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
4 Avenue S Prairie St Dead End South 03/06/23 07/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
5 Azalea St Parvin St Laurel St 05/30/23 08/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
6 Bailey St Willson St Dead End South 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
7 Bernard St Acme St Roselawn Dr 05/30/23 09/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
8 Bonnie Brae St Riney Rd University Dr(HW 380) 04/24/23 06/30/23 (2)8x16 TSV&8"WL Private Development Public Jeremiah Tillman-David
Installation Works Inspections
9 Bonnie Brae St Riney Rd Windsor Dr 03/10/23 07/31/23 Urbana at Bonnie Brae:Public Public Works Inspections Jeremiah Tillman-David
Paving
10 Bradshaw St Wilson St Prairie St 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
11 Bradshaw St Hickory St McKinney St 03/21/22 06/30/23 Utility installations and Engineering Scott Fettig
pavement replacement.
12 Bradshaw St Prairie St Sycamore St 03/13/23 07/17/23 Utility installations and Engineering Scott Fettig
pavement replacement.
13 Brook Hollow Dr Greenway Dr Carriage Hill Rd 10/07/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
14 Camellia St Parvin St Laurel.St 05/30/23 08/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
15 Carroll Blvd SB Parkway St Oak St 05/08/23 08/14/23 Concrete Panel Repair Streets Roy San Miguel
16 Churchill Dr Nottingham Dr Burning Tree Ln 05/15/23 06/16/23 Pipe bursting sewer pipe Public Works Inspections Armando Beltran
Clover Ln Robinwood Ln Glenwood Ln 12/09/22 06/15/23 Water Distribution will be Water Tiffany Sherrane
17 installing a new main line and
services.
18 Colonial Dr Thunderbird Dr Dead End South 07/11/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
19 Crawford St Hickory St McKinney St 03/21/22 06/30/23 Utility installations and Engineering Scott Fettig
pavement replacement.
20 Crescent St @ Fulton St intersection 05/08/23 06/02/23 Replacing public utilities in Public Works Inspections Lee Thurmond
roadway/intersection
21 Fulton St Crescent St Cordell St 05/08/23 06/02/23 Replacing public utilities in Public Works Inspections Lee Thurmond
roadway/intersection
22 Greenway Dr Thunderbird Dr Dead End South 07/11/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
23 Greenway Dr Thunderbird Dr Windsor Farms Dr 10/07/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
24 Hattie St Paisley St McKinney St 03/21/22 06/30/23 Utility installations and Engineering Scott Fettig
pavement replacement.
25 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper
26 Hickory St Exposition St Ruddell St 05/02/22 06/30/23 Utility installations and Engineering Scott Fettig
pavement replacement.
27 Highland St Locust St Wainwright St 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
28 Lakewood Dr Greenway Dr Carriage Hill Rd 10/07/22 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
29 Maddox St Prairie St Dead End 03/20/23 07/10/23 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on May 26,2023 11:30:37 AM CDT
Street/Intersection From To N�3 escription Department Department Contact
30 Mayhill Rd @ Spencer Rd 03/28/23 06/30/23 Water main tie-in and turn lane Public Works Inspections Ryan Cuba
addition
31 McKinney St Mayhill Rd Ryan Rd 05/04/23 06/22/23 Turn lane Public Works Inspections Ryan Cuba
32 McKinney St Crawford Rd Audra Ln 05/19/22 06/30/23 Utility installations and Engineering Scott Fettig
pavement replacement.
33 Mill St Allen St Johnson St 01/17/23 07/28/23 Utility Replacement Engineering Seth Garcia
34 Mill St Allen St Robertson St 02/27/23 07/28/23 Utility installation and roadway Engineering Seth Garcia
reconstruction
Mistywood Ln Robinwood Ln Sherwood Ln 12/09/22 06/15/23 Water Distribution will be Water Tiffany Sherrane
35 installing a new main line and
services.
36 Myrtle St Eagle Dr Fort Worth Dr 04/05/23 06/09/23 Relocating gas main and Atmos Zabdiel Mote
service lines.
37 Oak St Crawford St Wood St 04/04/22 06/30/23 Utility installations and Engineering Scott Fettig
pavement replacement.
38 Ottawa Dr Great Bear Ln Wind River Ln 05/29/23 07/06/23 Street Panel and Sidewalk Streets Roy San Miguel
Repair
39 Park Access Rd Windsor Dr Riney Rd 12/15/22 07/31/23 Urbana Bonnie Brae Project: Private Development Public Jeremiah Tillman-David
Water,Sewer,Storm,Paving. Works Inspections
Plum Hallow St Sagewood St Shadow Trl 05/30/23 07/15/23 This work includes road Other Taylor Holt
40 reconstruction with subgrade
stabilization,asphalt paving,
and concrete curb and gutter.
41 Riesling Dr Rhone Dr Merlot Dr 05/01/23 06/23/23 Concrete Panel and Sidewalk Streets Roy San Miguel
Repair
Robinwood Ln Kayewood Dr Emerson Ln 12/09/22 06/15/23 Water Distribution will be Water Tiffany Sherrane
42 installing a new main line and
services.
43 Sandy Creek Dr Angelina Bend Dr Angelina Bend Dr 05/18/23 06/23/23 Street Reconstruction Engineering Dustin Draper
44 Smith St Johnson St Bell Ave 01/30/23 06/02/23 Utility installations and Engineering Scott Fettig
pavement replacement.
45 Smith St Dallas Dr(Hwy 77) Hill St 03/06/23 06/07/23 Utility installations and Engineering Scott Fettig
pavement replacement.
46 Sycamore St Industrial St Wainwright St 04/24/23 07/11/23 Roadway&Utilities Engineering Seth Garcia
47 Sycamore St Exposition St Crawford St 03/13/23 07/17/23 Utility installations and Engineering Scott Fettig
pavement replacement.
48 Vista Verde St Montecito Rd Dead End West 04/06/23 06/02/23 Mill and Overlay Streets Jeff Jones
49 Wainwright St Prairie St Sycamore St 04/24/23 07/11/23 Roadway,utilities Engineering Seth Garcia
50 Wainwright St Highland St Prairie St 03/13/23 07/14/23 Utility installations and Engineering Scott Fettig
pavement replacement.
Willow Stone St Pheasant Hollow St Shadow Trl 05/30/23 07/15/23 This work includes road Other Taylor Holt
51 reconstruction with subgrade
stabilization,asphalt paving,
and concrete curb and gutter.
52 Wisteria St Parvin St Laurel St 05/30/23 08/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
53 Wood St McKinney St Hickory St 04/11/22 06/30/23 Utility installations and Engineering Scott Fettig
pavement replacement.
54 Woodrow Ln McKinney St Troy H Lagrone Dr 02/20/23 06/07/23 Water tie in Public Works Inspections Ryan Cuba
Exported on May 26,2023 11:30:37 AM CDT
3 Street Closure Report: Completed Closures smartsheet
Closure Start Closure End
Street/Intersection From"r—W Date Date Description Department Department Contact
1 Atlas Dr Hercules Ln Redstone Rd 10/17/22 05/05/23 Reconstruct Streets Jeremy Wilks
2 Avenue H Stella St Hickory St 04/17/23 04/28/23 Installing underground utilities Public Works Inspections Lee Thurmond
open cut roadway
3[_ Brown Or Roberts St Woodland St 03/28/23 05/23/23 Street Reconstruction Engineering Dustin Draper
Carroll Blvd Oak St Mckinney St 12/09/22 05/05/23 Wastewater Collections will be Wastewater Tiffany Sherrane
4 installing a new sewer main
line.
Dallas Dr(Hwy 77) @ RR crossing bridge appx.300'south of Eagle Dr 05/17/23 05/17/23 Close HWY 77 to perform Joe Prado
5 maintenance to the railroad
bridge
6 Hickory St Elm St N Austin St 03/20/23 05/26/23 Installation of Diagonal Engineering Robin Davis
Crosswalks/Ramps
7 Jim Christal Rd Western Blvd Masch Branch Rd 04/18/22 05/10/23 Exeter PH2:Paving Jim Christal Private Development Public Kirk Winter
Works Inspections
8 Locust St Walnut St Oak St 04/24/23 05/26/23 Installation of Diagonal Engineering Robin Davis
Crosswalks/Ramps
9 May St Henderson Dr Autumn Oak Or 02/27/23 04/28/23 Street Reconstruction Engineering Dustin Draper
North Texas Blvd 1-35 E Service Road Highland Park Rd 02/17/23 04/28/23 Contractor will be working the Engineering Robin Davis
Traffic Signal Upgrade and
switchover. traffic from 135 will
10 need to use Bonnie Brae Street.
project is limited to one-way
traffic from Highland Park to
135E.
11 Oak St Thomas St Bonnie Brae St 04/17/23 04/28/23 Installing screen walls at the Public Works Inspections Lee Thurmond
substation
12 Panhandle St Malone St Aileen St 04/03/23 04/30/23 Driveway work and Street Engineering Dustin Draper
Resurfacing
13 Prairie St E Wainwright St Bell Ave D 04/24/23 04/28/23 Utility installations and Engineering Scott Fettig
pavement replacement.
14 Savannah Trl Whitney Ct Longridge Dr 02/02/23 04/28/23 Street Reconstruction Engineering Dustin Draper
15 State School Rd I-35E Bowie St 03/06/23 05/19/23 Utilities relocation along East Engineering Aaron Skinner
side of State School Rd
16 State School Rd I-35E Bowie St. 03/06/23 05/24/23 Utilities Relocations Engineering Aaron Skinner
17 Whitney Ct Savannah Trl Dead End East 02/02/23 04/28/23 Street Reconstruction Engineering Dustin Draper
18 Woodland St Brown Dr Cherrywood Ln 03/01/23 05/23/23 Street Reconstruction Engineering Dustin Draper
Exported on May 26,2023 11:30:46 AM CDT