2023/07/28 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR July 31 st - Aug 6th
Street/Intersection From Department Contact
1 Oak St Mounts Ave Fulton St TBD TBD Wastewater Collections will be installing a new Wastewater Tiffany Sherrane
sewer main lines and services.
2 Prairie Lakey Street To Cemetary/Halfway down 08/17/23 10/20/23 Narrow lane closure from Lakey up to Cemetary Public Works Inspections Stephany Trammell
Prairie before Bradshaw to install new storm drain.
3 Sycamore Expositon Railroad Tracks on Sycamore 08/17/23 10/20/23 Work on manholes and for Lang Railyard Public Works Inspections Stephany Trammell
Private Development
Exported on July 28,2023 11:17:46 AM CDT
2 Street Closure Report: Current Closures smartsheet
Street/Intersection From r To ulosure a Description Department Ir Department Contact
Date I
1 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 09/15/23 Utility installations and Engineering Scott Fettig
pavement replacement.
2 Avenue S Prairie St Dead End South 03/06/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
3 Azalea St Parvin St Laurel St 05/30/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
4 Bailey St Willson St Dead End South 01/30/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
5 Bernard St Acme St Roselawn Dr 05/30/23 09/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
6 Bonnie Brae St Riney Rd Windsor Dr 03/10/23 07/31/23 Urbana at Bonnie Brae:Public Public Works Inspections Jeremiah Tillman-David
Paving
7 Bonnie Brae St Riney Rd University Dr(HW 380) 04/24/23 08/30/23 8"WL Utility Trench Repair Private Development Public Jeremiah Tillman-David
Works Inspections
8 Bradshaw St Hickory St McKinney St 03/21/22 08/18/23 Utility installations and Engineering Scott Fettig
pavement replacement.
9 Bradshaw St Wilson St Prairie St 01/30/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
10 Bradshaw St Prairie St Sycamore St 03/13/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
11 Brook Hollow Dr Greenway Dr Carriage Hill Rd 10/07/22 09/15/23 Utility installations and Engineering Scott Fettig
pavement replacement.
12 Camellia St Parvin St Laurel St 05/30/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
13 Carriage Hill Thunderbird Dr Brookhollow Dr 06/05/23 08/31/23 Pavement replacement. Engineering Scott Fettig
14 Colonial Dr Thunderbird Dr Dead End South 07/11/22 09/15/23 Utility installations and Engineering Scott Fettig
pavement replacement.
15 Crawford St Hickory St McKinney St 03/21/22 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
FM 1173 IH 35 Kansas City Southern Railroad 07/17/23 08/28/23 Roadway will be lanes close Private Development TXDoT Kirk Winter
16 Tracks and traffic flagged each day for
roadway.
17 Greenway Dr Thunderbird Dr Dead End South 07/11/22 09/15/23 Utility installations and Engineering Scott Fettig
pavement replacement.
18 Greenway Dr Thunderbird Dr Windsor Farms Dr 10/07/22 09/15/23 Utility installations and Engineering Scott Fettig
pavement replacement.
19 Hattie St Paisley St McKinney St 03/21/22 08/18/23 Utility installations and Engineering Scott Fettig
pavement replacement.
20 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper
21 Hickory St Exposition St Ruddell St 05/02/22 08/18/23 Utility installations and Engineering Scott Fettig
pavement replacement.
22 Highland St Locust St Wainwright St 01/30/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
23 Industrial St Bell St Mulberry St 07/05/23 08/29/23 Utility installation Engineering Seth Garcia
24 Inman St(201) Meadow St Centre Place Dr 07/31/23 08/18/23 Concrete Panel Repair Streets Roy San Miguel
25 Lakewood Dr Greenway Dr Carriage Hill Rd 10/07/22 09/15/23 Utility installations and Engineering Scott Fettig
pavement replacement.
26 Locust St Hickory St Oak St 07/20/23 08/17/23 Installation of Diagonal Engineering Robin Davis
Crosswalk
27 Maddox St Prairie St Dead End 03/20/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
28 Maple St Carroll Blvd Elm St 07/05/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
29 Mayhill Rd @ Spencer Rd 03/28/23 08/30/23 Water main tie-in and turn lane Public Works Inspections Ryan Cuba
addition
Exported on July 28,2023 11:17:54 AM CDT
Street/Intersection From To Closure Start Description Department Department Contact
Date
30 McKinney St Crawford Rd Audra Ln 05/19/22 08/18/23 Utility installations and Engineering Scott Fettig
pavement replacement.
31 McKinney St Mayhill Rd Ryan Rd 05/04/23 08/31/23 Turn lane Public Works Inspections Ryan Cuba
32 McKinney St Loop 288 Mayhill Rd 07/20/23 08/31/23 Sidewalk demo and new Public Works Inspections ryan cuba
sidewalk
33 Mill St Allen St Johnson St 01/17/23 09/01/23 Utility Replacement Engineering Seth Garcia
34 Mill St Allen St Robertson St 02/27/23 09/01/23 Utility installation and roadway Engineering Seth Garcia
reconstruction
35 Myrtle St Maple St Highland St 07/05/23 08/31/23 Utility installations and Scott Fettig
pavement replacement.
36 Myrtle St Eagle Dr Maple St 07/05/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
37 Myrtle St Fort Worth Dr Eagle Dr 06/05/23 09/28/23 Utility installations and Engineering Scott Fettig
pavement replacement.
38 Oak St Crawford St Wood St 04/04/22 08/18/23 Utility installations and Engineering Scott Fettig
pavement replacement.
39 Oak St Bonnie Brae St Thomas St 07/21/23 07/31/23 Working on curb and gutter Public Works Inspections Armando Beltran
40 Park Access Rd Windsor Dr Riney Rd 12/15/22 07/31/23 Urbana Bonnie Brae Project: Private Development Public Jeremiah Tillman-David
Water,Sewer,Storm,Paving. Works Inspections
41 Peninsula Trl Sea Cove Ln Marina Dr 07/24/23 08/18/23 Sidewalk Panel Replacement Streets Roy San Miguel
42 Pierce St Maple St Highland St 07/05/23 08/31/23 Utility installations and Scott Fettig
pavement replacement.
43 Smith St Dallas Dr(Hwy 77) Hill St 03/06/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
44 Smith St Johnson St Bell Ave 01/30/23 09/15/23 Utility installations and Engineering Scott Fettig
pavement replacement.
45 Sycamore St Industrial St Wainwright St 04/24/23 08/25/23 Roadway&Utilities Engineering Seth Garcia
46 Sycamore St Exposition St Crawford St 03/13/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
47 Thunderbird Dr Colonial Dr Crestmeadow St 06/05/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
48 Val Verde Ct Montecito Rd Dead End East 05/19/23 07/31/23 Mill and Overlay Streets Jeff Jones
49 Wainwright St Prairie St Sycamore St 04/24/23 08/25/23 Roadway,utilities Engineering Seth Garcia
50 Wainwright St Highland St Prairie St 03/13/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
51 Wisteria St Parvin St Laurel St 05/30/23 09/15/23 Utility installations and Engineering Scott Fettig
pavement replacement.
52 Wood St McKinney St Hickory St 04/11/22 08/18/23 Utility installations and Engineering Scott Fettig
pavement replacement.
53 Woodrow Ln McKinney St Troy H Lagrone Dr 02/20/23 08/11/23 Water tie in Public Works Inspections Ryan Cuba
Exported on July 28,2023 11:17:54 AM CDT
3 Street Closure Report: Completed Closures smartsheet
0 Closure End
Street/Intersection From A� Date Description Department Department Contact
1 Brookfield Ln(2603) Woodhaven St 49—mEmerson Ln 06/20/23 07/07/23 Curb an Valley Gutter repair Streets Roy San Miguel
2 Carroll Blvd SB Parkway St Oak St 05/08/23 07/28/23 Concrete Panel Repair Streets Roy San Miguel
3 Churchill Dr Nottingham Dr Burning Tree Ln 06/30/23 07/28/23 Pipe bursting sewer pipe Public Works Inspections Armando Beltran
Clover Ln Robinwood Ln Glenwood Ln 12/09/22 07/10/23 Water Distribution will be Water Tiffany Sherrane
4 installing a new main line and
services.
5 Cordell St(1229) Fulton St Crescent St 06/26/23 07/06/23 Curb and Road repair Streets Roy San Miguel
6 Green Oaks St(2300) Dunes St Cooper Branch 07/05/23 07/21/23 Valley Gutter Repair Streets Roy San Miguel
7 Locust St Hickory St Oak St 06/05/23 07/14/23 Installation of Diagonal Engineering Robin Davis
Crosswalks
8 Mingo Rd Mockingbird Ln Sirius Dr 06/30/23 07/28/23 Utility and road work Public Works Inspections Armando Beltran
9 Mingo St Sirius Dr Mockingbird Ln 07/27/23 07/28/23 Paving Mingo Public Works Inspections Armando Beltran
10 Oak St Thomas St Bonnie Brae St 06/16/23 06/30/23 installing underground utilities Public Works Inspections Lee Thurmond
open cut roadway
11 Oak St Locust St Austin St 06/05/23 07/14/23 Installation of Diagonal Engineering Robin Davis
Crosswalks
12 Oak St Thomas St Bonnie Brae St 07/07/23 07/14/23 Work on the DME substation Public Works Inspections Lee Thurmond
13 Ottawa Dr Great Bear Ln Wind River Ln 05/29/23 07/06/23 Street Panel and Sidewalk Streets Roy San Miguel
Repair
Plum Hollow St Sagewood St Shadow Trl 05/30/23 07/15/23 This work includes road Other Taylor Holt
14 reconstruction with subgrade
stabilization,asphalt paving,
and concrete curb and gutter.
Robinwood Ln Kayewood Dr Emerson Ln 12/09/22 07/10/23 Water Distribution will be Water Tiffany Sherrane
15 installing a new main line and
services.
16 Roselawn St Bernard St Fort Worth Dr 06/20/23 06/28/23 Utility work Engineering Seth Garcia
17 Stallion St Lakeview Blvd Oak Creek Ln 07/03/23 07/28/23 Street Concrete Panel Repair Streets Roy San Miguel
Willow Stone St Pheasant Hollow St Shadow Trl 05/30/23 07/15/23 This work includes road Other Taylor Holt
18 reconstruction with subgrade
stabilization,asphalt paving,
and concrete curb and gutter.
19 Windsor Dr Burning Tree Ln Nottingham Dr 06/30/23 07/28/23 Pipe bursting sewer pipe& Public Works Inspections Armando Beltran
Road restoration
Exported on July 28,2023 11:18:02 AM CDT