2023/08/04 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Aug 7th - Aug 13th 791111111 Street/Intersection From To Closure End Description Department Department Contact Date 1 Chaparral Ct Cooper Branch End 08/14/23 09/25/23 Utility Replacement Engineering Taylor Holt Nicosia St. Highway 77 Santos Dr. 09/05/23 10/02/23 This work belongs to the Northwest Booster Other Colton Garrett Pump Station Project.The contractor will be excavating across Nicosia St.so that they may tie into the 42"water line in the center of the road way. The excavation along with roadway restoration and repairs will take approx 28 days 2 to complete but,has the possibility of being lesser if no issues are uncovered during excavation.A message board will be displayed 1 week prior to closure informing the residents who do not receive these updates.Detours will be provided and maintained throughout the construction. 3 Oak St Mounts Ave Fulton St TBD TBD Wastewater Collections will be installing a new Wastewater Tiffany Sherrane sewer main lines and services. 4 Prairie Lakey Street To Cemetary/Halfway down 08/17/23 10/20/23 Narrow lane closure from Lakey up to Cemetery Public Works Inspections Stephany Trammell Prairie before Bradshaw to install new storm drain. Sycamore Expositon Railroad Tracks on Sycamore 08/17/23 10/20/23 Work on manholes and for Lang Railyard Public Works Inspections Stephany Trammell Private Development Exported on August 4,2023 11:45:32 AM CDT Page 1 of 1 2 Street Closure Report: Current Closures smartsheet Date Street/Intersection �1111 From �5111141WAW.M9 Closure End Description Department ff Department Contact 1 4045 S Bonnie Brea Vintage 377 08/07/23 08/11/23 Water main install Water Jamie Bond 2 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 3 Avenue S Prairie St Dead End South 03/06/23 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 4 Azalea St Parvin St Laurel St 05/30/23 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 5 Bailey St Willson St Dead End South 01/30/23 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 6 Bernard St Acme St Roselawn Dr 05/30/23 09/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 7 Bonnie Brae St Riney Rd University Dr(HW 380) 04/24/23 08/30/23 8"WL Utility Trench Repair Private Development Public Jeremiah Tillman-David Works Inspections 6 Bradshaw St Hickory St McKinney St 03/21/22 08/18/23 Utility installations and Engineering Scott Fettig pavement replacement. 9 Bradshaw St Wilson St Prairie St 01/30/23 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 10 Bradshaw St Prairie St Sycamore St 03/13/23 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 11 Brook Hollow Dr Greenway Dr Carriage Hill Rd 10/07/22 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 12 Buena Vista Montecito Cul-De-Sac 08/01/23 08/11/23 Two-inch mill and overlay Jeff Jones 13 Camellia St Parvin St Laurel St 05/30/23 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 14 Carriage Hill Thunderbird Dr Brookhollow Dr 06/05/23 08/31/23 Pavement replacement. Engineering Scott Fettig 15 Colonial Dr Thunderbird Dr Dead End South 07/11/22 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 16 Crawford St Hickory St McKinney St 03/21/22 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. FM 1173 IH 35 Kansas City Southern Railroad 07/17/23 08/28/23 Roadway will be lanes close Private Development TXDoT Kirk Winter 17 Tracks and traffic flagged each day for roadway. 18 Greenway Dr Thunderbird Dr Dead End South 07/11/22 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 19 Greenway Dr Thunderbird Dr Windsor Farms Dr 10/07/22 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 20 Hattie St Paisley St McKinney St 03/21/22 08/18/23 Utility installations and Engineering Scott Fettig pavement replacement. 21 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper 22 Hickory St Exposition St Ruddell St 05/02/22 08/18/23 Utility installations and Engineering Scott Fettig pavement replacement. 23 Highland St Locust St Wainwright St 01/30/23 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 24 Industrial St Bell St Mulberry St 07/05/23 08/29/23 Utility installation Engineering Seth Garcia 25 Inman St(201) Meadow St Centre Place Dr 07/31/23 08/18/23 Concrete Panel Repair Streets Roy San Miguel 26 Lakewood Dr Greenway Dr Carriage Hill Rd 10/07/22 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 27 Locust St Hickory St Oak St 07/20/23 08/17/23 Installation of Diagonal Engineering Robin Davis Crosswalk 28 Maddox St Prairie St Dead End 03/20/23 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 29 Maple St Carroll Blvd Elm St 07/05/23 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 30 Mayhill Rd @ Spencer Rd 03/28/23 08/30/23 Water main tie-in and turn lane Public Works Inspections Ryan Cuba addition Exported on August 4,2023 11:45:42 AM CDT Page 1 of 2 Street/Intersection From To Closure Start Description Department Department Contact Date 31 McKinney St Crawford Rd Audra Ln 05/19/22 08/18/23 Utility installations and Engineering Scott Fettig pavement replacement. 32 McKinney St Mayhill Rd Ryan Rd 05/04/23 08/31/23 Turn lane Public Works Inspections Ryan Cuba 33 McKinney St Loop 288 Mayhill Rd 07/20/23 08/31/23 Sidewalk demo and new Public Works Inspections ryan cuba sidewalk 34 Mill St Allen St Johnson St 01/17/23 09/01/23 Utility Replacement Engineering Seth Garcia 35 Mill St Allen St Robertson St 02/27/23 09/01/23 Utility installation and roadway Engineering Seth Garcia reconstruction 36 Myrtle St Maple St Highland St 07/05/23 08/31/23 Utility installations and Scott Fettig pavement replacement. 37 Myrtle St Eagle Dr Maple St 07/05/23 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 38 Myrtle St Fort Worth Dr Eagle Dr 06/05/23 09/28/23 Utility installations and Engineering Scott Fettig pavement replacement. 39 Oak St Crawford St Wood St 04/04/22 08/18/23 Utility installations and Engineering Scott Fettig pavement replacement. Pear Tree PI Pheasant Hollow St Shadow Trail 07/31/23 09/06/23 This work includes road Other Taylor Holt 40 reconstruction with subgrade stabilization,asphalt paving, and concrete curb and gutter. 41 Peninsula Trl Sea Cove Ln Marina Dr 07/24/23 08/18/23 Sidewalk Panel Replacement Streets Roy San Miguel 42 Pierce St Maple St Highland St 07/05/23 08/31/23 Utility installations and Scott Fettig pavement replacement. 43 Smith St Dallas Dr(Hwy 77) Hill St 03/06/23 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 44 Smith St Johnson St Bell Ave 01/30/23 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 45 Sycamore St Industrial St Wainwright St 04/24/23 08/25/23 Roadway&Utilities Engineering Seth Garcia 46 Sycamore St Exposition St Crawford St 03/13/23 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 47 Thunderbird Dr Colonial Dr Crestmeadow St 06/05/23 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 48 Wainwright St Prairie St Sycamore St 04/24/23 08/25/23 Roadway,utilities Engineering Seth Garcia 49 Wainwright St Highland St Prairie St 03/13/23 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. Windbrook Ct Windbrook St End 07/31/23 09/29/23 This work includes road Other Taylor Holt 50 reconstruction with subgrade stabilization,asphalt paving, and concrete curb and gutter. 51 Wisteria St Parvin St Laurel St 05/30/23 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 52 Wood St McKinney St Hickory St 04/11/22 08/18/23 Utility installations and Engineering Scott Fettig pavement replacement. 53 Woodrow Ln McKinney St Troy H Lagrone Dr 02/20/23 08/11/23 Water tie in Public Works Inspections Ryan Cuba Exported on August 4,2023 11:45:42 AM CDT Page 2 of 2 3 Street Closure Report: Completed Closures smartsheet Intersection1 Street/ • • r031101=23 . •_ • D- • Department1 Bonnie Brae St Riney Rd Windsor Dr 07/31/23 Urbana at Bonnie Brae:Public Public Works Inspections Jeremiah Tillman-David Paving 2 Brookfield Ln(2603) Woodhaven St Emerson Ln 06/20/23 07/07/23 Curb an Valley Gutter repair Streets Roy San Miguel 3 Carroll Blvd SIB Parkway St Oak St 05/08/23 07/28/23 Concrete Panel Repair Streets Roy San Miguel 4 Churchill Dr Nottingham Dr Burning Tree Ln 06/30/23 07/28/23 Pipe bursting sewer pipe Public Works Inspections Armando Beltran Clover Ln Robinwood Ln Glenwood Ln 12/09/22 07/10/23 Water Distribution will be Water Tiffany Sherrane 5 installing a new main line and services. 6 Cordell St(1229) Fulton St Crescent St 06/26/23 07/06/23 Curb and Road repair Streets Roy San Miguel 7 Green Oaks St(2300) Dunes St Cooper Branch 07/05/23 07/21/23 Valley Gutter Repair Streets Roy San Miguel 8 Locust St Hickory St Oak St 06/05/23 07/14/23 Installation of Diagonal Engineering Robin Davis Crosswalks 9 Mingo Rd Mockingbird Ln Sirius Dr 06/30/23 07/28/23 Utility and road work Public Works Inspections Armando Beltran 10 Mingo St Sirius Dr Mockingbird Ln 07/27/23 07/28/23 Paving Mingo Public Works Inspections Armando Beltran 11 Oak bonnie brae thomas 08/04/23 07/04/23 poring back curb and gutter Public Works Inspections Lee Thurmond 12 Oak St Locust St Austin St 06/05/23 07/14/23 Installation of Diagonal Engineering Robin Davis Crosswalks 13 Oak St Thomas St Bonnie Brae St 07/07/23 07/14/23 Work on the DME substation Public Works Inspections Lee Thurmond 14 Oak St Bonnie Brae St Thomas St 07/21/23 07/31/23 Working on curb and gutter Public Works Inspections Armando Beltran 15 Ottawa Dr Great Bear Ln Wind River Ln 05/29/23 07/06/23 Street Panel and Sidewalk Streets Roy San Miguel Repair 16 Park Access Rd Windsor Dr Riney Rd 12/15/22 07/31/23 Urbana Bonnie Brae Project: Private Development Public Jeremiah Tillman-David Water,Sewer,Storm,Paving. Works Inspections Plum Hollow St Sagewood St Shadow Trl 05/30/23 07/15/23 This work includes road Other Taylor Holt 17 reconstruction with subgrade stabilization,asphalt paving, and concrete curb and gutter. Robinwood Ln Kayewood Dr Emerson Ln 12/09/22 07/10/23 Water Distribution will be Water Tiffany Sherrane 18 installing a new main line and services. 19 Stallion St Lakeview Blvd Oak Creek Ln 07/03/23 07/28/23 Street Concrete Panel Repair Streets Roy San Miguel 20 Val Verde Ct Montecito Rd Dead End East 05/19/23 07/31/23 Mill and Overlay Streets Jeff Jones Willow Stone St Pheasant Hollow St Shadow Trl 05/30/23 07/15/23 This work includes road Other Taylor Holt 21 reconstruction with subgrade stabilization,asphalt paving, and concrete curb and gutter. 22 Windsor Dr Burning Tree Ln Nottingham Dr 06/30/23 07/28/23 Pipe bursting sewer pipe& Public Works Inspections Armando Beltran Road restoration Exported on August 4,2023 11:53:52 AM CDT Page 1 of 1