2023/08/11 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Aug 14th - 20th
T9W- Closure End Description Department Department Contact
Street/Intersection From To Date
1 Bell Ave Sycamore St Prairie St 08/21/23 09/04/23 Utility installations and pavement replacement. Engineering Scott Fettig
2 Collins St Johnson St West to Dead End 08/22/23 10/31/23 Utility installations and pavement replacement. Engineering Scott Fettig
3 Mulberry St E Bell Ave Industrial St 08/21/23 10/31/23 Utility installations and pavement replacement. Engineering Scott Fettig
Nicosia St Highway 77 Santos Dr 09/05/23 10/02/23 This work belongs to the Northwest Booster Other Colton Garrett
Pump Station Project.The contractor will be
excavating across Nicosia St.so that they may
tie into the 42"water line in the center of the
road way. The excavation along with roadway
restoration and repairs will take approx 28 days
4 to complete but,has the possibility of being
lesser if no issues are uncovered during
excavation.A message board will be displayed
1 week prior to closure informing the residents
who do not receive these updates.Detours will
be provided and maintained throughout the
construction.
5 Prairie St Lakey St To Cemetery/Halfway down 08/17/23 10/20/23 Narrow lane closure from Lakey up to Cemetary Public Works Inspections Stephany Trammell
Prairie before Bradshaw to install new storm drain.
B Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 10/20/23 Work on manholes and for Lang Railyard Public Works Inspections Stephany Trammell
Private Development
Exported on August 11,2023 11:32:27 AM CDT
2 Street Closure Report: Current Closures smartsheet
Street/Intersection From r To ulosure a Description Department Ir Department Contact
Date I
1 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 09/15/23 Utility installations and Engineering Scott Fettig
pavement replacement.
2 Avenue S Prairie St Dead End South 03/06/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
3 Azalea St Parvin St Laurel St 05/30/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
4 Bailey St Wilson St Dead End South 01/30/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
5 Bernard St Acme St Roselawn Dr 05/30/23 09/01/23 Utility installations and Engineering Scott Fettig
pavement replacement.
6 Bonnie Brae St Vintage Rd Ft Worth Dr(HW 377) 08/07/23 08/18/23 Water main install Water Jamie Bond
7 Bonnie Brae St Riney Rd University Dr(HW 380) 04/24/23 08/30/23 8"WL Utility Trench Repair Private Development Public Jeremiah Tillman-David
Works Inspections
8 Bradshaw St Hickory St McKinney St 03/21/22 08/18/23 Utility installations and Engineering Scott Fettig
pavement replacement.
9 Bradshaw St Wilson St Prairie St 01/30/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
10 Bradshaw St Prairie St Sycamore St 03/13/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
11 Brook Hollow Dr Greenway Dr Carriage Hill Rd 10/07/22 09/15/23 Utility installations and Engineering Scott Fettig
pavement replacement.
12 Buena Vista Dr Montecito Dr Cul-De-Sac 08/01/23 09/01/23 Two-inch mill and overlay Jeff Jones
13 Camellia St Parvin St Laurel St 05/30/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
14 Carriage Hill Rd Thunderbird Dr Brookhollow Dr 06/05/23 08/31/23 Pavement replacement. Engineering Scott Fettig
Carroll Hickory Eagle 07/03/23 09/07/23 Atmos,Relocation Work for CIP Engineering Public Works Sheldon Gatewood
15 Projects.Restoration of Road Inspections
Panels and SW Panels
16 Chaparral Ct Cooper Branch E Dead End 08/14/23 09/25/23 Utility Replacement Engineering Taylor Holt
17 Colonial Dr Thunderbird Dr Dead End South 07/11/22 09/15/23 Utility installations and Engineering Scott Fettig
pavement replacement.
18 Crawford St Hickory St McKinney St 03/21/22 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
Duchess Dr Loop 288 Mockingbird Ln 08/14/23 08/16/23 Water Department to make tap Public Works Inspections Stephany Trammell
on Duchess for the Pecan
Creek Business next to DATCU
Bank.(All businesses and
19 apartments will still have access
to their property.Contractor
only needs a 3-day closure to
complete restoration after city
makes the tap.)
Elm Street Oak Hickory 08/14/23 08/17/23 Striping of recently installed Engineering Robin Davis
20 diagonal cross-walks around
the Square. Short term lane
closures
FM 1173 IH 35 Kansas City Southern Railroad 07/17/23 08/28/23 Roadway will be lanes close Private Development TXDoT Kirk Winter
21 Tracks and traffic flagged each day for
roadway.
22 Greenway Dr Thunderbird Dr Dead End South 07/11/22 09/15/23 Utility installations and Engineering Scott Fettig
pavement replacement.
23 Greenway Dr Thunderbird Dr Windsor Farms Dr 10/07/22 09/15/23 Utility installations and Engineering Scott Fettig
pavement replacement.
24 Hattie St Paisley St McKinney St 03/21/22 08/18/23 Utility installations and Engineering Scott Fettig
pavement replacement.
25 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper
26 Hickory St Exposition St Ruddell St 05/02/22 08/18/23 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on August 11,2023 11:32:42 AM CDT
Street/Intersection From To Description Department Department Contact
Hickory Street Elm Locust 08/14/23 08/17/23 Striping of recently installed Engineering Robin Davis
27 diagonal cross-walks around
the Square. Short term lane
closures
28 Highland St Locust St Wainwright St 01/30/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
29 Industrial St Bell St Mulberry St 07/05/23 08/29/23 Utility installation Engineering Seth Garcia
30 Inman St(201) Meadow St Centre Place Dr 07/31/23 08/18/23 Concrete Panel Repair Streets Roy San Miguel
31 Lakewood Dr Greenway Dr Carriage Hill Rd 10/07/22 09/15/23 Utility installations and Engineering Scott Fettig
pavement replacement.
Locust Steet Oak Hickory 08/14/23 08/17/23 Striping of recently installed Engineering Robin Davis
32 diagonal cross-walks around
the Square. Short term lane
closures
33 Maddox St Prairie St Dead End 03/20/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
34 Maple St Carroll Blvd Elm St 07/05/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
35 Mayhill Rd @ Spencer Rd 03/28/23 08/30/23 Water main tie-in and turn lane Public Works Inspections Ryan Cuba
addition
36 McKinney St Crawford Rd Audra Ln 05/19/22 08/18/23 Utility installations and Engineering Scott Fettig
pavement replacement.
37 McKinney St Mayhill Rd Ryan Rd 05/04/23 08/31/23 Turn lane Public Works Inspections Ryan Cuba
38 McKinney St Loop 288 Mayhill Rd 07/20/23 08/31/23 Sidewalk demo and new Public Works Inspections ryan cuba
sidewalk
39 Mill St Allen St Johnson St 01/17/23 09/01/23 Utility Replacement Engineering Seth Garcia
40 Mill St Allen St Robertson St 02/27/23 09/01/23 Utility installation and roadway Engineering Seth Garcia
reconstruction
41 Myrtle St Maple St Highland St 07/05/23 08/31/23 Utility installations and Scott Fettig
pavement replacement.
42 Myrtle St Eagle Dr Maple St 07/05/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
43 Myrtle St Fort Worth Dr(HW377) Eagle Dr 06/05/23 09/28/23 Utility installations and Engineering Scott Fettig
pavement replacement.
44 Oak St Crawford St Wood St 04/04/22 08/18/23 Utility installations and Engineering Scott Fettig
pavement replacement.
Oak Steet Elm Locust 08/14/23 08/17/23 Striping of recently installed Engineering Robin Davis
45 diagonal cross-walks around
the Square. Short term lane
closures
Pear Tree PI Pheasant Hollow St Shadow Trail 07/31/23 09/06/23 This work includes road Other Taylor Holt
46 reconstruction with subgrade
stabilization,asphalt paving,
and concrete curb and gutter.
47 Peninsula Trl Sea Cove Ln Marina Dr 07/24/23 08/18/23 Sidewalk Panel Replacement Streets Roy San Miguel
48 Pierce St Maple St Highland St 07/05/23 08/31/23 Utility installations and Scott Fettig
pavement replacement.
49 Smith St Dallas Dr(Hwy 77) Hill St 03/06/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
50 Smith St Johnson St Bell Ave 01/30/23 09/15/23 Utility installations and Engineering Scott Fettig
pavement replacement.
51 Sycamore St Industrial St Wainwright St 04/24/23 08/25/23 Roadway&Utilities Engineering Seth Garcia
52 Sycamore St Exposition St Crawford St 03/13/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
53 Thunderbird Dr Colonial Dr Crestmeadow St 06/05/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
54 Wainwright St Prairie St Sycamore St 04/24/23 08/25/23 Roadway,utilities Engineering Seth Garcia
Exported on August 11,2023 11:32:42 AM CDT
Street/Intersection From lmmm�Description Department Department Contact
55 Wainwright St Highland St Prairie St 03/13/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
Windbrook Ct Windbrook St Dead End 07/31/23 09/29/23 This work includes road Other Taylor Holt
56 reconstruction with subgrade
stabilization,asphalt paving,
and concrete curb and gutter.
57 Wisteria St Parvin St Laurel St 05/30/23 09/15/23 Utility installations and Engineering Scott Fettig
pavement replacement.
58 Wood St McKinney St Hickory St 04/11/22 08/18/23 Utility installations and Engineering Scott Fettig
pavement replacement.
59 Woodrow Ln McKinney St Troy H Lagrone Dr 02/20/23 09/01/23 Water tie in Public Works Inspections Ryan Cuba
Exported on August 11,2023 11:32:42 AM CDT
3 Street Closure Report: Completed Closures smartsheet
Intersection • • Date
Date
• Description Department Department
1 Bonnie Brae St Riney Rd Windsor Dr 03/10/23 07/31/23 Urbana at Bonnie Brae:Public Public Works Inspections Jeremiah Tillman-David
Paving
2 Carroll Blvd SIB Parkway St Oak St 05/08/23 07/28/23 Concrete Panel Repair Streets Roy San Miguel
3 Churchill Dr Nottingham Dr Burning Tree Ln 06/30/23 07/28/23 Pipe bursting sewer pipe Public Works Inspections Armando Beltran
4 Green Oaks St(2300) Dunes St Cooper Branch 07/05/23 07/21/23 Valley Gutter Repair Streets Roy San Miguel
5 Locust St Hickory St Oak St 06/05/23 07/14/23 Installation of Diagonal Engineering Robin Davis
Crosswalks
6 Locust St Hickory St Oak St 07/20/23 08/04/23 Installation of Diagonal Engineering Robin Davis
Crosswalk
7 Mingo Rd Mockingbird Ln Sirius Dr 06/30/23 07/28/23 Utility and road work Public Works Inspections Armando Beltran
8 Mingo St Sirius Dr Mockingbird Ln 07/27/23 07/28/23 Paving Mingo Public Works Inspections Armando Beltran
9 Oak St Locust St Austin St 06/05/23 07/14/23 Installation of Diagonal Engineering Robin Davis
Crosswalks
10 Oak St Thomas St Bonnie Brae St 07/07/23 07/14/23 Work on the DIME substation Public Works Inspections Lee Thurmond
11 Oak St Bonnie Brae St Thomas St 07/21/23 07/31/23 Working on curb and gutter Public Works Inspections Armando Beltran
12 Park Access Rd Windsor Dr Riney Rd 12/15/22 07/31/23 Urbana Bonnie Brae Project: Private Development Public Jeremiah Tillman-David
Water,Sewer,Storm,Paving. Works Inspections
Plum Hollow St Sagewood St Shadow Trl 05/30/23 07/15/23 This work includes road Other Taylor Holt
13 reconstruction with subgrade
stabilization,asphalt paving,
and concrete curb and gutter.
14 Stallion St Lakeview Blvd Oak Creek Ln 07/03/23 07/28/23 Street Concrete Panel Repair Streets Roy San Miguel
15 Val Verde Ct Montecito Rd Dead End East 05/19/23 07/31/23 Mill and Overlay Streets Jeff Jones
Willow Stone St Pheasant Hollow St Shadow Trl 05/30/23 07/15/23 This work includes road Other Taylor Holt
16 reconstruction with subgrade
stabilization,asphalt paving,
and concrete curb and gutter.
17 Windsor Dr Burning Tree Ln Nottingham Dr 06/30/23 07/28/23 Pipe bursting sewer pipe& Public Works Inspections Armando Beltran
Road restoration
Exported on August 11,2023 11:32:59 AM CDT