2023/08/25 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Aug 28th - Sep 3rd Street/ From To . • . •- • 0- • • Department Department 1 Avenue C Eagle Drive Highland Street 08/28/23 09/29/23 Relocation of gas lines. Atmos Gregory McCutchen 2 Chestnut St&Ave D North Texas Blvd Avenue C 08/28/23 09/29/23 Relocation of gas lines. Atmos Gregory McCutchen 3 Leslie St Willowwood St Dudley St 08/31/23 01/08/24 Utility installations and pavement replacement. Engineering Scott Fettig Nicosia St Highway 77 Santos Dr 09/11/23 10/06/23 This work belongs to the Northwest Booster Other Colton Garrett Pump Station Project.The contractor will be excavating across Nicosia St.so that they may tie into the 42"water line in the center of the road way. The excavation along with roadway restoration and repairs will take approx 28 days 4 to complete but,has the possibility of being lesser if no issues are uncovered during excavation.A message board will be displayed 1 week prior to closure informing the residents who do not receive these updates.Detours will be provided and maintained throughout the construction. 5 Underwood St. North Texas Blvd. Kendolph Dr. 08/28/23 10/16/23 Pavement replacement. Engineering Scott Fettig Exported on August 25,2023 11:19:35 AM CDT 2 Street Closure Report: Current Closures smartsheet Street/Intersection From r To ulosure a Description Department Ir Department Contact Date I 1 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 2 Avenue S Prairie St Dead End South 03/06/23 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 3 Azalea St Parvin St Laurel St 05/30/23 09/30/23 Utility installations and Engineering Scott Fettig pavement replacement. 4 Bailey St Wilson St Dead End South 01/30/23 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 5 Bell Ave Sycamore St Prairie St 08/21/23 09/04/23 Utility installations and Engineering Scott Fettig pavement replacement. 6 Bernard St Acme St Roselawn Dr 05/30/23 09/01/23 Utility installations and Engineering Scott Fettig pavement replacement. 7 Bonnie Brae St Riney Rd University Dr(HW 380) 04/24/23 08/30/23 8"WL Utility Trench Repair Private Development Public Jeremiah Tillman-David Works Inspections 8 Bradshaw St Wilson St Prairie St 01/30/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 9 Bradshaw St Prairie St Sycamore St 03/13/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 10 Brook Hollow Dr Greenway Dr Carriage Hill Rd 10/07/22 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 11 Buena Vista Dr Montecito Dr Cul-De-Sac 08/14/23 09/15/23 re construct roadway Streets Jeff Jones 12 Camellia St Parvin St Laurel St 05/30/23 09/30/23 Utility installations and Engineering Scott Fettig pavement replacement. 13 Carriage Hill Rd Thunderbird Dr Brookhollow Dr 06/05/23 09/15/23 Pavement replacement. Engineering Scott Fettig Carroll Blvd Hickory St Eagle Dr 07/03/23 09/07/23 Atmos,Relocation Work for CIP Engineering Public Works Sheldon Gatewood 14 Projects.Restoration of Road Inspections Panels and SW Panels 15 Chaparral Ct Cooper Branch E Dead End 08/14/23 09/25/23 Utility Replacement Engineering Taylor Holt 16 Collins St Johnson St West to Dead End 08/22/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 17 Colonial Dr Thunderbird Dr Dead End South 07/11/22 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 18 Crawford St Hickory St McKinney St 03/21/22 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. FM 1173 IH 35 Kansas City Southern Railroad 07/17/23 08/28/23 Roadway will be lanes close Private Development TXDoT Kirk Winter 19 Tracks and traffic flagged each day for roadway. 20 Greenway Dr Thunderbird Dr Dead End South 07/11/22 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 21 Greenway Dr Thunderbird Dr Windsor Farms Dr 10/07/22 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 22 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper 23 Highland St Locust St Wainwright St 01/30/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 24 Industrial St Bell St Mulberry St 07/05/23 09/29/23 Utility installation Engineering Seth Garcia Katy Trail Edwards Rd DCTA MedPark Station 08/21/23 11/30/23 A small section of Katy Trail will Other Tracy L.Beck,PE,PMP have intermittent closures to 25 accommodate the construction of the new Mayhill Road Bridge over the DCTA 26 Lakewood Dr Greenway Dr Carriage Hill Rd 10/07/22 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 27 Maddox St Prairie St Dead End 03/20/23 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 28 Maple St Carroll Blvd Elm St 07/05/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. Exported on August 25,2023 11:19:44 AM CDT Street/Intersection From To N�3 escription Department Department Contact 29 Mayhill Rd @ Spencer Rd 03/28/23 09/14/23 Water main tie-in and turn lane Public Works Inspections Ryan Cuba addition 30 McKinney St Mayhill Rd Ryan Rd 05/04/23 09/14/23 Turn lane Public Works Inspections Ryan Cuba 31 McKinney St Loop 288 Mayhill Rd 07/20/23 09/14/23 Sidewalk demo and new Public Works Inspections ryan cuba sidewalk 32 Mill St Allen St Johnson St 01/17/23 09/01/23 Utility Replacement Engineering Seth Garcia 33 Mill St Allen St Robertson St 02/27/23 09/01/23 Utility installation and roadway Engineering Seth Garcia reconstruction 34 Mulberry St E Bell Ave Industrial St 08/21/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 35 Myrtle St Fort Worth Dr(HW377) Eagle Dr 06/05/23 09/28/23 Utility installations and Engineering Scott Fettig pavement replacement. 36 Myrtle St Maple St Highland St 07/05/23 10/31/23 Utility installations and Scott Fettig pavement replacement. 37 Myrtle St Eagle Dr Maple St 07/05/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. Pear Tree PI Pheasant Hollow St Shadow Trail 07/31/23 09/06/23 This work includes road Other Taylor Holt 38 reconstruction with subgrade stabilization,asphalt paving, and concrete curb and gutter. 39 Pickwick Ln Oxford Ln Windsor Dr 08/21/23 09/25/23 Utility Replacement Engineering Taylor Holt 40 Pierce St Maple St Highland St 07/05/23 10/31/23 Utility installations and Scott Fettig pavement replacement. Prairie St Lakey St To Cemetary/Halfway down Prairie 08/17/23 10/20/23 Narrow lane closure from Lakey Public Works Inspections Stephany Trammell 41 up to Cemetary before Bradshaw to install new storm drain. 42 Smith St Johnson St Bell Ave 01/30/23 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 43 Smith St Dallas Dr(Hwy 77) Hill St 03/06/23 09/30/23 Utility installations and Engineering Scott Fettig pavement replacement. 44 Sycamore St Industrial St Wainwright St 04/24/23 09/08/23 Roadway&Utilities Engineering Seth Garcia 45 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 10/20/23 Work on manholes and for Lang Public Works Inspections Stephany Trammell Railyard Private Development 46 Sycamore St Exposition St Crawford St 03/13/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 47 Thunderbird Dr Colonial Dr Crestmeadow St 06/05/23 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 48 Wainwright St Prairie St Sycamore St 04/24/23 09/29/23 Roadway,utilities Engineering Seth Garcia 49 Wainwright St Highland St Prairie St 03/13/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. Windbrook Ct Windbrook St Dead End 07/31/23 09/29/23 This work includes road Other Taylor Holt 50 reconstruction with subgrade stabilization,asphalt paving, and concrete curb and gutter. Windbrook St Pheasant Hollow St Shadow Trl 08/21/23 09/25/23 This work includes road Engineering Taylor Holt 51 reconstruction with subgrade stabilization,asphalt paving, and concrete curb and gutter. 52 Wisteria St Parvin St Laurel St 05/30/23 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 53 Woodrow Ln McKinney St Troy H Lagrone Dr 02/20/23 09/01/23 Water tie in Public Works Inspections Ryan Cuba Exported on August 25,2023 11:19:44 AM CDT 3 Street Closure Report: Completed Closures smartsheet Intersection • • Date Date • Description Department Department 1 Bonnie Brae St Riney Rd Windsor Dr 03/10/23 07/31/23 Urbana at Bonnie Brae:Public Public Works Inspections Jeremiah Tillman-David Paving 2 Bonnie Brae St Vintage Rd Ft Worth Dr(HW 377) 08/07/23 08/21/23 Water main install Water Jamie Bond 3 Bradshaw St Hickory St McKinney St 03/21/22 08/18/23 Utility installations and Engineering Scott Fettig pavement replacement. 4 Carroll Blvd SB Parkway St Oak St 05/08/23 07/28/23 Concrete Panel Repair Streets Roy San Miguel 5 Churchill Dr Nottingham Dr Burning Tree Ln 06/30/23 07/28/23 Pipe bursting sewer pipe Public Works Inspections Armando Beltran Duchess Dr Loop 288 Mockingbird Ln 08/14/23 08/16/23 Water Department to make tap Public Works Inspections Stephany Trammell on Duchess for the Pecan Creek Business next to DATCU Bank.(All businesses and 6 apartments will still have access to their property.Contractor only needs a 3-day closure to complete restoration after city makes the tap.) Elm St Oak St Hickory St 08/14/23 08/17/23 Striping of recently installed Engineering Robin Davis 7 diagonal cross-walks around the Square. Short term lane closures 8 Hettie St Paisley St McKinney St 03/21/22 08/18/23 Utility installations and Engineering Scott Fettig pavement replacement. Hickory St Elm St Locust St 08/14/23 08/17/23 Striping of recently installed Engineering Robin Davis 9 diagonal cross-walks around the Square. Short term lane closures 10 Hickory St Exposition St Ruddell St 05/02/22 08/18/23 Utility installations and Engineering Scott Fettig pavement replacement. 11 Inman St(201) Meadow St Centre Place Dr 07/31/23 08/18/23 Concrete Panel Repair Streets Roy San Miguel 12 Locust St Hickory St Oak St 07/20/23 08/04/23 Installation of Diagonal Engineering Robin Davis Crosswalk Locust St Oak St Hickory St 08/14/23 08/17/23 Striping of recently installed Engineering Robin Davis 13 diagonal cross-walks around the Square. Short term lane closures 14 McKinney St Crawford Rd Audra Ln 05/19/22 08/18/23 Utility installations and Engineering Scott Fettig pavement replacement. 15 Mingo Rd Mockingbird Ln Sirius Dr 06/30/23 07/28/23 Utility and road work Public Works Inspections Armando Beltran 16 Mingo St Sirius Dr Mockingbird Ln 07/27/23 07/28/23 Paving Mingo Public Works Inspections Armando Beltran 17 Oak St Bonnie Brae St Thomas St 07/21/23 07/31/23 Working on curb and gutter Public Works Inspections Armando Beltran Oak St Elm St Locust St 08/14/23 08/17/23 Striping of recently installed Engineering Robin Davis 18 diagonal cross-walks around the Square. Short term lane closures 19 Oak St Crawford St Wood St 04/04/22 08/18/23 Utility installations and Engineering Scott Fettig pavement replacement. 20 Park Access Rd Windsor Dr Riney Rd 12/15/22 07/31/23 Urbana Bonnie Brae Project: Private Development Public Jeremiah Tillman-David Water,Sewer,Storm,Paving. Works Inspections 21 Peninsula Trl Sea Cove Ln Marina Dr 07/24/23 08/18/23 Sidewalk Panel Replacement Streets Roy San Miguel 22 Stallion St Lakeview Blvd Oak Creek Ln 07/03/23 07/28/23 Street Concrete Panel Repair Streets Roy San Miguel 23 Val Verde Ct Montecito Rd Dead End East 05/19/23 07/31/23 Mill and Overlay Streets Jeff Jones 24 Windsor Dr Burning Tree Ln Nottingham Dr 06/30/23 07/28/23 Pipe bursting sewer pipe& Public Works Inspections Armando Beltran Road restoration Exported on August 25,2023 11:19:54 AM CDT Street/Intersection From To Closure Start Closure End Description Department Department Contact Date Date 25 Wood St McKinney St Hickory St 04/11/22 08/18/23 Utility installations and Engineering Scott Fettig pavement replacement. Exported on August 25,2023 11:19:54 AM CDT