Loading...
2023/09/08 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Sep 11 th - 17th Street/Intersection . '• . . . . .. Department 1 Exported on September 8,2023 1:49:11 PM CDT 2 Street Closure Report: Current Closures smartsheet Street/Intersection From r To ulosure a Description Department Ir Department Contact Date I 1 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 2 Avenue C Eagle Drive Highland Street 09/18/23 11/03/23 Relocation of gas lines. Atmos Gavin Petner 3 Avenue S Prairie St Dead End South 03/06/23 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 4 Azalea St Parvin St Laurel St 05/30/23 09/30/23 Utility installations and Engineering Scott Fettig pavement replacement. 5 Bell Ave Sycamore St Prairie St 08/21/23 09/22/23 Utility installations and Engineering Scott Fettig pavement replacement. 6 Bernard St Acme St Roselawn Dr 05/30/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 7 Bolivar St(1611) Westway St College St W 09/12/23 09/18/23 Sidewalk and Drive Approach Streets Other Jeff Jones 6 Bradshaw St Wilson St Prairie St 01/30/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 9 Bradshaw St Prairie St Sycamore St 03/13/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 10 Brightwood Terrace Wilsonwood Dr Longfellow Ln 09/11/23 10/09/23 Utility Installation Engineering Taylor Holt 11 Brook Hollow Dr Greenway Dr Carriage Hill Rd 10/07/22 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 12 Buena Vista Dr Montecito Dr Cul-De-Sac 08/14/23 09/15/23 re construct roadway Streets Jeff Jones 13 Camellia St Parvin St Laurel St 05/30/23 09/30/23 Utility installations and Engineering Scott Fettig pavement replacement. 14 Carriage Hill Rd Thunderbird Dr Brookhollow Dr 06/05/23 09/15/23 Pavement replacement. Engineering Scott Fettig 15 Chaparral Ct Cooper Branch E Dead End 08/14/23 09/25/23 Utility Replacement Engineering Taylor Holt 16 Chestnut St&Ave D North Texas Blvd Avenue C 08/28/23 09/29/23 Relocation of gas lines. Atmos Gavin Petner 17 Collins St Johnson St West to Dead End 08/22/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 18 Colonial Dr Thunderbird Dr Dead End South 07/11/22 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 19 Greenway Dr Thunderbird Dr Dead End South 07/11/22 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 20 Greenway Dr Thunderbird Dr Windsor Farms Dr 10/07/22 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 21 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper 22 Hickory St W Bonnie Brae St Ave G 09/04/23 09/26/23 work associated with the DME Public Works Inspections Lee Thurmond substation 23 Highland St Locust St Wainwright St 01/30/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 24 Industrial St Bell St Mulberry St 07/05/23 09/29/23 Utility installation Engineering Seth Garcia Katy Trail Edwards Rd DCTA MedPark Station 08/21/23 11/30/23 A small section of Katy Trail will Other Tracy L.Beck,PE,PIMP have intermittent closures to 25 accommodate the construction of the new Mayhill Road Bridge over the DCTA 26 Lakewood Dr Greenway Dr Carriage Hill Rd 10/07/22 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 27 Leslie St Willowwood St Dudley St 08/31/23 01/08/24 Utility installations and Engineering Scott Fettig pavement replacement. 28 Maple St Carroll Blvd Elm St 07/05/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 29 Mayhill Rd @ Spencer Rd 03/28/23 10/28/23 Water main tie-in and turn lane Public Works Inspections Ryan Cuba addition 30 McKinney St Mayhill Rd Ryan Rd 05/04/23 10/28/23 Turn lane Public Works Inspections Ryan Cuba Exported on September 8,2023 1:49:27 PM CDT Street/Intersection From To Description Department Department Contact 31 McKinney St Loop 288 Mayhill Rd 07/20/23 10/28/23 Sidewalk demo and new Public Works Inspections ryan cuba sidewalk 32 Mill Pond Rd Emerson Ln Old North Rd 09/11/23 10/09/23 Utility Installations Engineering Taylor Holt 33 Mounts Ave Oak St W Gregg St 09/05/23 09/29/23 Relocating gas main Atmos Gregory McCutchen 34 Mulberry St E Bell Ave Industrial St 08/21/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 35 Myrtle St Fort Worth Dr(HW377) Eagle Dr 06/05/23 09/28/23 Utility installations and Engineering Scott Fettig pavement replacement. 36 Myrtle St Maple St Highland St 07/05/23 10/31/23 Utility installations and Scott Fettig pavement replacement. 37 Myrtle St Eagle Dr Maple St 07/05/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. Nicosia St Elm St(HWY 77) Santos Dr 09/11/23 10/06/23 This work belongs to the Other Colton Garrett Northwest Booster Pump Station Project.The contractor will be excavating across Nicosia St.so that they may tie into the 42"water line in the center of the road way. The excavation along with roadway restoration and repairs will take 38 approx 28 days to complete but, has the possibility of being lesser if no issues are uncovered during excavation.A message board will be displayed 1 week prior to closure informing the residents who do not receive these updates.Detours will be provided and maintained throughout the construction. 39 Pheasant Hollow St Windbrook St Willow Stone St 09/11/23 10/23/23 Pavement Replacement Engineering Taylor Holt 40 Pickwick Ln Oxford Ln Windsor Dr 08/21/23 09/25/23 Utility Replacement Engineering Taylor Holt 41 Pierce St Maple St Highland St 07/05/23 10/31/23 Utility installations and Scott Fettig pavement replacement. Prairie St Lakey St To Cemetery/Halfway down Prairie 08/17/23 10/20/23 Narrow lane closure from Lakey Public Works Inspections Stephany Trammell 42 up to Cemetery before Bradshaw to install new storm drain. 43 Smith St Johnson St Bell Ave 01/30/23 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 44 Smith St Dallas Dr(Hwy 77) Hill St 03/06/23 09/30/23 Utility installations and Engineering Scott Fettig pavement replacement. 45 Sycamore St Industrial St Wainwright St 04/24/23 09/29/23 Roadway&Utilities Engineering Seth Garcia 46 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 10/20/23 Work on manholes and for Lang Public Works Inspections Stephany Trammell Railyard Private Development 47 Sycamore St Exposition St Crawford St 03/13/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 48 Tanglewood St Locust St Pheasant Hollow St 09/11/23 10/16/23 Pavement replacement Engineering Taylor Holt 49 Thunderbird Dr Colonial Dr Crestmeadow St 06/05/23 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 50 Underwood St. North Texas Blvd. Kendolph Dr. 08/28/23 10/16/23 Pavement replacement. Engineering Scott Fettig 51 Vista Verde Rd Montecito Dr dead end east 09/11/23 10/16/23 Street Reconstruct Streets Jeff Jones 52 Wainwright St Prairie St Sycamore St 04/24/23 09/29/23 Roadway,utilities Engineering Seth Garcia 53 Wainwright St Highland St Prairie St 03/13/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. Windbrook Ct Windbrook St Dead End 07/31/23 09/29/23 This work includes road Other Taylor Holt 54 reconstruction with subgrade stabilization,asphalt paving, and concrete curb and gutter. Exported on September 8,2023 1:49:27 PM CDT Street/Intersection From To Description Department Department Contact Windbrook St Pheasant Hollow St Shadow Trl 08/21/23 09/25/23 This work includes road Engineering Taylor Holt 55 reconstruction with subgrade stabilization,asphalt paving, and concrete curb and gutter. 56 Wisteria St Parvin St Laurel St 05/30/23 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 57 Woodrow Ln McKinney St Troy H Lagrone Dr 02/20/23 09/29/23 Water tie in Public Works Inspections Ryan Cuba Exported on September 8,2023 1:49:27 PM CDT 3 Street Closure Report: Completed Closures smartsheet I I Closure Sta7 Closure End Department Contact To t Description Department street/Intersection From W Date Da e 1 Bailey St Wilson St Dead End South 01/30/23 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 2 Bonnie Brae St Vintage Rd Ft Worth Dr(HW 377) 08/07/23 08/21/23 Water main install Water Jamie Bond 3 Bonnie Brae St Riney Rd University Dr(HW 380) 04/24/23 08/30/23 8"WL Utility Trench Repair Private Development Public Jeremiah Tillman-David Works Inspections 4 Bradshaw St Hickory St McKinney St 03/21/22 08/18/23 Utility installations and Engineering Scott Fettig pavement replacement. Carroll Blvd Hickory St Eagle Dr 07/03/23 08/31/23 Atmos,Relocation Work for CIP Engineering Public Works Sheldon Gatewood 5 Projects.Restoration of Road Inspections Panels and SW Panels 6 Crawford St Hickory St McKinney St 03/21/22 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. Duchess Dr Loop 288 Mockingbird Ln 08/14/23 08/16/23 Water Department to make tap Public Works Inspections Stephany Trammell on Duchess for the Pecan Creek Business next to DATCU Bank.(All businesses and 7 apartments will still have access to their property.Contractor only needs a 3-day closure to complete restoration after city makes the tap.) Elm St Oak St Hickory St 08/14/23 08/17/23 Striping of recently installed Engineering Robin Davis diagonal cross-walks around the Square. Short term lane closures FM 1173 IH 35 Kansas City Southern Railroad 07/17/23 08/28/23 Roadway will be lanes close Private Development TXDoT Kirk Winter 9 Tracks and traffic flagged each day for roadway. 10 Hattie St Paisley St McKinney St 03/21/22 08/18/23 Utility installations and Engineering Scott Fettig pavement replacement. Hickory St Elm St Locust St 08/14/23 08/17/23 Striping of recently installed Engineering Robin Davis 11 diagonal cross-walks around the Square. Short term lane closures 12 Hickory St Exposition St Ruddell St 05/02/22 08/18/23 Utility installations and Engineering Scott Fettig pavement replacement. 13 Inman St(201) Meadow St Centre Place Dr 07/31/23 08/18/23 Concrete Panel Repair Streets Roy San Miguel Locust St Oak St Hickory St 08/14/23 08/17/23 Striping of recently installed Engineering Robin Davis 14 diagonal cross-walks around the Square. Short term lane closures 15 Maddox St Prairie St Dead End 03/20/23 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 16 McKinney St Crawford Rd Audra Ln 05/19/22 08/18/23 Utility installations and Engineering Scott Fettig pavement replacement. 17 Mill St Allen St Robertson St 02/27/23 09/01/23 Utility installation and roadway Engineering Seth Garcia reconstruction 18 Mill St Allen St Johnson St 01/17/23 09/22/23 Utility Replacement Engineering Seth Garcia Oak St Elm St Locust St 08/14/23 08/17/23 Striping of recently installed Engineering Robin Davis 19 diagonal cross-walks around the Square. Short term lane closures 20 Oak St Crawford St Wood St 04/04/22 08/18/23 Utility installations and Engineering Scott Fettig pavement replacement. Exported on September 8,2023 1:49:43 PM CDT Street/Intersection From Closure Start Closure End Description Department Department Contact Date Date Pear Tree PI Pheasant Hollow St Shadow Trail 07/31/23 09/06/23 This work includes road Other Taylor Holt 21 reconstruction with subgrade stabilization,asphalt paving, and concrete curb and gutter. 22 Peninsula Trl Sea Cove Ln Marina Dr 07/24/23 08/18/23 Sidewalk Panel Replacement Streets Roy San Miguel 23 Wood St McKinney St Hickory St 04/11/22 08/18/23 Utility installations and Engineering Scott Fettig pavement replacement. Exported on September 8,2023 1:49:43 PM CDT