2023/09/29 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Oct 2nd - 8th
Closure End
Street/Intersection From To Date Description Department Department Contact
1 Crawford St Mulberry St Sycamore St 10/09/23 12/11/23 Utility installations and pavement replacement. Engineering Scott Fettig
2 Lookout Ln Windsor Dr Westward Dr 10/16/23 11/24/23 Panel and Sidewalk Repair Streets Roy San Miguel
3 Mayhill Rd IH 35 Colorado Blvd 10/06/23 10/27/23 One land to be closed for staging construction Other Tracy L.Beck,PE,PMP
operations for new bridge
4 Mulberry St E Wood St Crawford St 10/09/23 12/12/23 Utility installations and pavement replacement. Engineering Scott Fettig
5 Sycamore St Wood St Crawford St 10/09/23 12/11/23 Utility installations and pavement replacement. Engineering Scott Fettig
6 Trinity Rd Mills Rd Cooper Rd 10/12/23 11/03/23 installation of force main and demo of old Public Works Inspections Ryan Cuba
system
Exported on September 29,2023 11:32:50 AM CDT
2 Street Closure Report: Current Closures smartsheet
Street/Intersection From .2,r To ulosure a Description Department Ir Department Contact
Date I
1 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 10/06/23 Utility installations and Engineering Scott Fettig
pavement replacement.
2 Ave H Hickory St Stella St 09/30/23 10/10/23 Pavement replacement for Public Works Inspections Lee Thurmond
electrical substation
3 Avenue C Eagle Dr Highland St 09/18/23 11/03/23 Relocation of gas lines. Atmos Gavin Petner
4 Avenue C Maple St Highland St 10/02/23 12/04/23 Atmos gas relocation Atmos Gavin Petner
5 Azalea St Parvin St Laurel St 05/30/23 10/16/23 Utility installations and Engineering Scott Fettig
pavement replacement.
6 Bell Ave Sycamore St Prairie St 08/21/23 10/20/23 Utility installations and Engineering Scott Fettig
pavement replacement.
7 Bernard St Acme St Roselawn Dr 05/30/23 10/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
8 Bradshaw St Wilson St Prairie St 01/30/23 10/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
9 Bradshaw St Prairie St Sycamore St 03/13/23 10/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
10 Brightwood Terrace Wilsonwood Dr Longfellow Ln 09/11/23 10/09/23 Utility Installation Engineering Taylor Holt
11 Camellia St Parvin St Laurel St 05/30/23 10/16/23 Utility installations and Engineering Scott Fettig
pavement replacement.
12 Carriage Hill Rd Thunderbird Dr Brookhollow Dr 06/05/23 10/06/23 Pavement replacement. Engineering Scott Fettig
13 Chaparral Ct Cooper Branch E Dead End 08/14/23 10/16/23 Utility Replacement Engineering Taylor Holt
14 Collins St Johnson St Dead End West 08/22/23 10/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
15 Colonial Dr Thunderbird Dr Dead End South 07/11/22 10/06/23 Utility installations and Engineering Scott Fettig
pavement replacement.
16 Greenway Dr Thunderbird Dr Dead End South 07/11/22 10/06/23 Utility installations and Engineering Scott Fettig
pavement replacement.
17 Greenway Dr Thunderbird Dr Windsor Farms Dr 10/07/22 10/06/23 Utility installations and Engineering Scott Fettig
pavement replacement.
18 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper
19 Highland St Locust St Wainwright St 01/30/23 10/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
20 Industrial St Bell St Mulberry St 07/05/23 12/29/23 Utility installation and roadway Engineering Seth Garcia
work
Katy Trail Edwards Rd DCTA MedPark Station 08/21/23 11/30/23 A small section of Katy Trail will Other Tracy L.Beck,PE,PMP
have intermittent closures to
21 accommodate the construction
of the new Mayhill Road Bridge
over the DCTA
22 Leslie St Willowwood St Dudley St 08/31/23 01/08/24 Utility installations and Engineering Scott Fettig
pavement replacement.
23 Maple St Carroll Blvd Elm St 07/05/23 10/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
24 Maple St Elm St Carroll Blvd 09/15/23 11/03/23 Utility installations and Scott Fettig
pavement replacement.
25 Masch Branch Rd Lovers Ln Darby Smith Rd 09/07/23 10/20/23 Base failure Streets Jeff Jones
26 Mayhill Rd @ Spencer Rd 03/28/23 10/28/23 Water main tie-in and turn lane Public Works Inspections Ryan Cuba
addition
27 McKinney St Mayhill Rd Ryan Rd 05/04/23 10/28/23 Turn lane Public Works Inspections Ryan Cuba
28 McKinney St Loop 288 Mayhill Rd 07/20/23 10/28/23 Sidewalk demo and new Public Works Inspections ryan cuba
sidewalk
29E Mill Pond Rd Emerson Ln Old North Rd 09/11/23 10/09/23 Utility Installations Engineering Taylor Holt
30 Mingo Rd Mockingbird Ln Sirius Dr 09/25/23 10/13/23 Base Failures Streets Jeff Jones
Exported on September 29,2023 11:33:01 AM CDT
Street/Intersection From To Description Department Department Contact
31 Mulberry St E Bell Ave Industrial St 08/21/23 10/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
32 Myrtle St Fort Worth Dr(HW377) Eagle Dr 06/05/23 10/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
33 Myrtle St Maple St Highland St 07/05/23 10/31/23 Utility installations and Scott Fettig
pavement replacement.
34 Myrtle St Eagle Dr Maple St 07/05/23 10/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
Nicosia St Elm St(HWY 77) Santos Dr 09/11/23 10/06/23 This work belongs to the Other Colton Garrett
Northwest Booster Pump
Station Project.The contractor
will be excavating across
Nicosia St.so that they may tie
into the 42"water line in the
center of the road way. The
excavation along with roadway
restoration and repairs will take
35 approx 28 days to complete but,
has the possibility of being
lesser if no issues are
uncovered during excavation.A
message board will be
displayed 1 week prior to
closure informing the residents
who do not receive these
updates.Detours will be
provided and maintained
throughout the construction.
36 Oak St Bonnie Brae St Thomas St 09/30/23 10/10/23 Pavement replacement for Public Works Inspections Lee Thurmond
electrical substation
37 Oakwood Dr McCormick St East Dead End 10/02/23 02/08/24 Utility installations and Engineering Scott Fettig
pavement replacement.
38 Palo Verde Dr Brias Ct Montecito Dr 09/08/23 10/27/23 Reconstruct Jeff Jones
Panhandle St Bonnie Brae St Eastpark Blvd 10/02/23 10/13/23 Water service taps,and street Private Development Zabdiel Mota
39 panel repairs for east bound
lane and turning lane.
40 Pheasant Hollow St Windbrook St Willow Stone St 09/11/23 10/23/23 Pavement Replacement Engineering Taylor Holt
41 Pickwick Ln Oxford Ln Windsor Dr 08/21/23 10/16/23 Utility Replacement Engineering Taylor Holt
42 Pierce St Maple St Highland St 07/05/23 10/31/23 Utility installations and Scott Fettig
pavement replacement.
Prairie St Lakey St To Cemetery/Halfway down Prairie 08/17/23 10/20/23 Narrow lane closure from Lakey Public Works Inspections Stephany Trammell
43 up to Cemetery before
Bradshaw to install new storm
drain.
44 Smith St Dallas Dr(Hwy 77) Hill St 03/06/23 10/16/23 Utility installations and Engineering Scott Fettig
pavement replacement.
45 Smith St Johnson St Bell Ave 01/30/23 10/16/23 Utility installations and Engineering Scott Fettig
pavement replacement.
46 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 10/20/23 Work on manholes and for Lang Public Works Inspections Stephany Trammell
Railyard Private Development
47 Sycamore St Exposition St Crawford St 03/13/23 10/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
48 Sycamore St Industrial St Wainwright St 04/24/23 12/29/23 Roadway&Utilities Engineering Seth Garcia
49 Tanglewood St Locust St Pheasant Hollow St 09/11/23 10/16/23 Pavement replacement Engineering Taylor Holt
50 Thunderbird Dr Colonial Dr Crestmeadow St 06/05/23 10/06/23 Utility installations and Engineering Scott Fettig
pavement replacement.
51 Underwood St North Texas Blvd Kendolph Dr 08/28/23 10/16/23 Pavement replacement. Engineering Scott Fettig
52 Vista Verde Rd Montecito Dr dead end east 09/11/23 10/16/23 Street Reconstruct Streets Jeff Jones
53 Wainwright St Highland St Prairie St 03/13/23 10/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
54 Wainwright St Prairie St Sycamore St 04/24/23 11/17/23 Roadway,utilities Engineering Seth Garcia
Exported on September 29,2023 11:33:01 AM CDT
Street/Intersection From To Description Department Department Contact
Windbrook St Pheasant Hollow St Shadow Trl 08/21/23 10/02/23 This work includes road Engineering Taylor Holt
55 reconstruction with subgrade
stabilization,asphalt paving,
and concrete curb and gutter.
56 Wisteria St Parvin St Laurel St 05/30/23 10/16/23 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on September 29,2023 11:33:01 AM CDT
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection From Closure Start Closure End
Date Date Description Department Department Contact
1 Avenue S Prairie St Dead End South 03/06/23 09/15/23 Utility installations and Engineering Scott Fettig
pavement replacement.
2 Bailey St Wilson St Dead End South 01/30/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
3 Bolivar St(1611) Westway St College St W 09/12/23 09/22/23 Sidewalk and Drive Approach Streets Other Jeff Jones
4 Bonnie Brae St Riney Rd University Dr(HW 380) 04/24/23 08/30/23 8"WL Utility Trench Repair Private Development Public Jeremiah Tillman-David
Works Inspections
5 Brook Hollow Dr Greenway Dr Carriage Hill Rd 10/07/22 09/15/23 Utility installations and Engineering Scott Fettig
pavement replacement.
6 Buena Vista Dr Montecito Dr Cul-De-Sac 08/14/23 09/15/23 re construct roadway Streets Jeff Jones
Carroll Blvd Hickory St Eagle Dr 07/03/23 08/31/23 Atmos,Relocation Work for CIP Engineering Public Works Sheldon Gatewood
7 Projects.Restoration of Road Inspections
Panels and SW Panels
8 Chestnut St&Ave D North Texas Blvd Avenue C 08/28/23 09/26/23 Relocation of gas lines. Atmos Gavin Petner
9 Crawford St Hickory St McKinney St 03/21/22 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
10 Hickory St W Bonnie Brae St Ave G 09/04/23 09/29/23 work associated with the DME Public Works Inspections Lee Thurmond
substation
11 Lakewood Dr Greenway Dr Carriage Hill Rd 10/07/22 09/15/23 Utility installations and Engineering Scott Fettig
pavement replacement.
12 Maddox St Prairie St Dead End 03/20/23 08/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
13 Mill St Allen St Robertson St 02/27/23 09/01/23 Utility installation and roadway Engineering Seth Garcia
reconstruction
14 Mill St Allen St Johnson St 01/17/23 09/22/23 Utility Replacement Engineering Seth Garcia
15 Mounts Ave Oak St W Gregg St 09/05/23 09/29/23 Relocating gas main Atmos Gregory McCutchen
Pear Tree PI Pheasant Hollow St Shadow Trl 07/31/23 09/06/23 This work includes road Other Taylor Holt
16 reconstruction with subgrade
stabilization,asphalt paving,
and concrete curb and gutter.
17 Syracuse Dr Depaul 3705 Syracuse 09/21/23 09/26/23 Drive approach and sidewalk Streets Jeff Jones
Windbrook Ct Windbrook St Dead End 07/31/23 09/29/23 This work includes road Other Taylor Holt
18 reconstruction with subgrade
stabilization,asphalt paving,
and concrete curb and gutter.
191 Woodrow Ln McKinney St Troy H Lagrone Dr 02/20/23 09/29/23 Water tie in Public Works Inspections Ryan Cuba
Exported on September 29,2023 11:33:10 AM CDT