2023/09/29 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Oct 2nd - 8th Closure End Street/Intersection From To Date Description Department Department Contact 1 Crawford St Mulberry St Sycamore St 10/09/23 12/11/23 Utility installations and pavement replacement. Engineering Scott Fettig 2 Lookout Ln Windsor Dr Westward Dr 10/16/23 11/24/23 Panel and Sidewalk Repair Streets Roy San Miguel 3 Mayhill Rd IH 35 Colorado Blvd 10/06/23 10/27/23 One land to be closed for staging construction Other Tracy L.Beck,PE,PMP operations for new bridge 4 Mulberry St E Wood St Crawford St 10/09/23 12/12/23 Utility installations and pavement replacement. Engineering Scott Fettig 5 Sycamore St Wood St Crawford St 10/09/23 12/11/23 Utility installations and pavement replacement. Engineering Scott Fettig 6 Trinity Rd Mills Rd Cooper Rd 10/12/23 11/03/23 installation of force main and demo of old Public Works Inspections Ryan Cuba system Exported on September 29,2023 11:32:50 AM CDT 2 Street Closure Report: Current Closures smartsheet Street/Intersection From .2,r To ulosure a Description Department Ir Department Contact Date I 1 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 10/06/23 Utility installations and Engineering Scott Fettig pavement replacement. 2 Ave H Hickory St Stella St 09/30/23 10/10/23 Pavement replacement for Public Works Inspections Lee Thurmond electrical substation 3 Avenue C Eagle Dr Highland St 09/18/23 11/03/23 Relocation of gas lines. Atmos Gavin Petner 4 Avenue C Maple St Highland St 10/02/23 12/04/23 Atmos gas relocation Atmos Gavin Petner 5 Azalea St Parvin St Laurel St 05/30/23 10/16/23 Utility installations and Engineering Scott Fettig pavement replacement. 6 Bell Ave Sycamore St Prairie St 08/21/23 10/20/23 Utility installations and Engineering Scott Fettig pavement replacement. 7 Bernard St Acme St Roselawn Dr 05/30/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 8 Bradshaw St Wilson St Prairie St 01/30/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 9 Bradshaw St Prairie St Sycamore St 03/13/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 10 Brightwood Terrace Wilsonwood Dr Longfellow Ln 09/11/23 10/09/23 Utility Installation Engineering Taylor Holt 11 Camellia St Parvin St Laurel St 05/30/23 10/16/23 Utility installations and Engineering Scott Fettig pavement replacement. 12 Carriage Hill Rd Thunderbird Dr Brookhollow Dr 06/05/23 10/06/23 Pavement replacement. Engineering Scott Fettig 13 Chaparral Ct Cooper Branch E Dead End 08/14/23 10/16/23 Utility Replacement Engineering Taylor Holt 14 Collins St Johnson St Dead End West 08/22/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 15 Colonial Dr Thunderbird Dr Dead End South 07/11/22 10/06/23 Utility installations and Engineering Scott Fettig pavement replacement. 16 Greenway Dr Thunderbird Dr Dead End South 07/11/22 10/06/23 Utility installations and Engineering Scott Fettig pavement replacement. 17 Greenway Dr Thunderbird Dr Windsor Farms Dr 10/07/22 10/06/23 Utility installations and Engineering Scott Fettig pavement replacement. 18 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper 19 Highland St Locust St Wainwright St 01/30/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 20 Industrial St Bell St Mulberry St 07/05/23 12/29/23 Utility installation and roadway Engineering Seth Garcia work Katy Trail Edwards Rd DCTA MedPark Station 08/21/23 11/30/23 A small section of Katy Trail will Other Tracy L.Beck,PE,PMP have intermittent closures to 21 accommodate the construction of the new Mayhill Road Bridge over the DCTA 22 Leslie St Willowwood St Dudley St 08/31/23 01/08/24 Utility installations and Engineering Scott Fettig pavement replacement. 23 Maple St Carroll Blvd Elm St 07/05/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 24 Maple St Elm St Carroll Blvd 09/15/23 11/03/23 Utility installations and Scott Fettig pavement replacement. 25 Masch Branch Rd Lovers Ln Darby Smith Rd 09/07/23 10/20/23 Base failure Streets Jeff Jones 26 Mayhill Rd @ Spencer Rd 03/28/23 10/28/23 Water main tie-in and turn lane Public Works Inspections Ryan Cuba addition 27 McKinney St Mayhill Rd Ryan Rd 05/04/23 10/28/23 Turn lane Public Works Inspections Ryan Cuba 28 McKinney St Loop 288 Mayhill Rd 07/20/23 10/28/23 Sidewalk demo and new Public Works Inspections ryan cuba sidewalk 29E Mill Pond Rd Emerson Ln Old North Rd 09/11/23 10/09/23 Utility Installations Engineering Taylor Holt 30 Mingo Rd Mockingbird Ln Sirius Dr 09/25/23 10/13/23 Base Failures Streets Jeff Jones Exported on September 29,2023 11:33:01 AM CDT Street/Intersection From To Description Department Department Contact 31 Mulberry St E Bell Ave Industrial St 08/21/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 32 Myrtle St Fort Worth Dr(HW377) Eagle Dr 06/05/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 33 Myrtle St Maple St Highland St 07/05/23 10/31/23 Utility installations and Scott Fettig pavement replacement. 34 Myrtle St Eagle Dr Maple St 07/05/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. Nicosia St Elm St(HWY 77) Santos Dr 09/11/23 10/06/23 This work belongs to the Other Colton Garrett Northwest Booster Pump Station Project.The contractor will be excavating across Nicosia St.so that they may tie into the 42"water line in the center of the road way. The excavation along with roadway restoration and repairs will take 35 approx 28 days to complete but, has the possibility of being lesser if no issues are uncovered during excavation.A message board will be displayed 1 week prior to closure informing the residents who do not receive these updates.Detours will be provided and maintained throughout the construction. 36 Oak St Bonnie Brae St Thomas St 09/30/23 10/10/23 Pavement replacement for Public Works Inspections Lee Thurmond electrical substation 37 Oakwood Dr McCormick St East Dead End 10/02/23 02/08/24 Utility installations and Engineering Scott Fettig pavement replacement. 38 Palo Verde Dr Brias Ct Montecito Dr 09/08/23 10/27/23 Reconstruct Jeff Jones Panhandle St Bonnie Brae St Eastpark Blvd 10/02/23 10/13/23 Water service taps,and street Private Development Zabdiel Mota 39 panel repairs for east bound lane and turning lane. 40 Pheasant Hollow St Windbrook St Willow Stone St 09/11/23 10/23/23 Pavement Replacement Engineering Taylor Holt 41 Pickwick Ln Oxford Ln Windsor Dr 08/21/23 10/16/23 Utility Replacement Engineering Taylor Holt 42 Pierce St Maple St Highland St 07/05/23 10/31/23 Utility installations and Scott Fettig pavement replacement. Prairie St Lakey St To Cemetery/Halfway down Prairie 08/17/23 10/20/23 Narrow lane closure from Lakey Public Works Inspections Stephany Trammell 43 up to Cemetery before Bradshaw to install new storm drain. 44 Smith St Dallas Dr(Hwy 77) Hill St 03/06/23 10/16/23 Utility installations and Engineering Scott Fettig pavement replacement. 45 Smith St Johnson St Bell Ave 01/30/23 10/16/23 Utility installations and Engineering Scott Fettig pavement replacement. 46 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 10/20/23 Work on manholes and for Lang Public Works Inspections Stephany Trammell Railyard Private Development 47 Sycamore St Exposition St Crawford St 03/13/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 48 Sycamore St Industrial St Wainwright St 04/24/23 12/29/23 Roadway&Utilities Engineering Seth Garcia 49 Tanglewood St Locust St Pheasant Hollow St 09/11/23 10/16/23 Pavement replacement Engineering Taylor Holt 50 Thunderbird Dr Colonial Dr Crestmeadow St 06/05/23 10/06/23 Utility installations and Engineering Scott Fettig pavement replacement. 51 Underwood St North Texas Blvd Kendolph Dr 08/28/23 10/16/23 Pavement replacement. Engineering Scott Fettig 52 Vista Verde Rd Montecito Dr dead end east 09/11/23 10/16/23 Street Reconstruct Streets Jeff Jones 53 Wainwright St Highland St Prairie St 03/13/23 10/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 54 Wainwright St Prairie St Sycamore St 04/24/23 11/17/23 Roadway,utilities Engineering Seth Garcia Exported on September 29,2023 11:33:01 AM CDT Street/Intersection From To Description Department Department Contact Windbrook St Pheasant Hollow St Shadow Trl 08/21/23 10/02/23 This work includes road Engineering Taylor Holt 55 reconstruction with subgrade stabilization,asphalt paving, and concrete curb and gutter. 56 Wisteria St Parvin St Laurel St 05/30/23 10/16/23 Utility installations and Engineering Scott Fettig pavement replacement. Exported on September 29,2023 11:33:01 AM CDT 3 Street Closure Report: Completed Closures smartsheet Street/Intersection From Closure Start Closure End Date Date Description Department Department Contact 1 Avenue S Prairie St Dead End South 03/06/23 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 2 Bailey St Wilson St Dead End South 01/30/23 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 3 Bolivar St(1611) Westway St College St W 09/12/23 09/22/23 Sidewalk and Drive Approach Streets Other Jeff Jones 4 Bonnie Brae St Riney Rd University Dr(HW 380) 04/24/23 08/30/23 8"WL Utility Trench Repair Private Development Public Jeremiah Tillman-David Works Inspections 5 Brook Hollow Dr Greenway Dr Carriage Hill Rd 10/07/22 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 6 Buena Vista Dr Montecito Dr Cul-De-Sac 08/14/23 09/15/23 re construct roadway Streets Jeff Jones Carroll Blvd Hickory St Eagle Dr 07/03/23 08/31/23 Atmos,Relocation Work for CIP Engineering Public Works Sheldon Gatewood 7 Projects.Restoration of Road Inspections Panels and SW Panels 8 Chestnut St&Ave D North Texas Blvd Avenue C 08/28/23 09/26/23 Relocation of gas lines. Atmos Gavin Petner 9 Crawford St Hickory St McKinney St 03/21/22 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 10 Hickory St W Bonnie Brae St Ave G 09/04/23 09/29/23 work associated with the DME Public Works Inspections Lee Thurmond substation 11 Lakewood Dr Greenway Dr Carriage Hill Rd 10/07/22 09/15/23 Utility installations and Engineering Scott Fettig pavement replacement. 12 Maddox St Prairie St Dead End 03/20/23 08/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 13 Mill St Allen St Robertson St 02/27/23 09/01/23 Utility installation and roadway Engineering Seth Garcia reconstruction 14 Mill St Allen St Johnson St 01/17/23 09/22/23 Utility Replacement Engineering Seth Garcia 15 Mounts Ave Oak St W Gregg St 09/05/23 09/29/23 Relocating gas main Atmos Gregory McCutchen Pear Tree PI Pheasant Hollow St Shadow Trl 07/31/23 09/06/23 This work includes road Other Taylor Holt 16 reconstruction with subgrade stabilization,asphalt paving, and concrete curb and gutter. 17 Syracuse Dr Depaul 3705 Syracuse 09/21/23 09/26/23 Drive approach and sidewalk Streets Jeff Jones Windbrook Ct Windbrook St Dead End 07/31/23 09/29/23 This work includes road Other Taylor Holt 18 reconstruction with subgrade stabilization,asphalt paving, and concrete curb and gutter. 191 Woodrow Ln McKinney St Troy H Lagrone Dr 02/20/23 09/29/23 Water tie in Public Works Inspections Ryan Cuba Exported on September 29,2023 11:33:10 AM CDT