2023/10/27 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Oct 30th - Nov 5th Street/Intersection Department Contact 1 Bonnie Brae St US 77(Elm St N) Bronco Way/Riney Rd 11/06/23 11/27/23 Contractor will be installing a 16 inch water line Engineering Jesus Perez off of the new 36 water line along US77. 2 McKinney St E(301) Bell Ave Oakland St 11/13/23 11/30/23 Sidewalk and ADA repair Streets Roy San Miguel 3 Railroad Ave Hickory St McKinney St 11/06/23 11/30/23 Sidewalk repair in front or HR Streets Roy San Miguel 4 Windsor or(2700) Carriage Hill Rd Westgate Dr 11/06/23 11/30/23 Sidewalk/Curb Repair Streets Roy San Miguel Exported on October 27,2023 11:34:46 AM CDT 2 Street Closure Report: Current Closures smartsheet -M ulosure start Closure End Description Department ff Department Contact -MOMAM Date Date 17St Eagle Dr Highland St 09/18/23 11/03/23 Relocation of gas lines. Atmos Gavin Petner 2 Maple St Highland St 10/02/23 12/04/23 Atmos gas relocation Atmos Gavin Petner 3 Parvin St Laurel St 05/30/23 11/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 4 Bell Ave Sycamore St Prairie St 08/21/23 11/10/23 Utility installations and Engineering Scott Fettig pavement replacement. 5 Bernard St Acme St Roselawn Dr 05/30/23 11/30/23 Utility installations and Engineering Scott Fettig pavement replacement. Bonnie Brae St Scripture St Hickory St 10/23/23 11/20/23 installing conduit across Public Works Inspections Lee Thurmond roadway for dme substation. 6 closures will be rolling at times and full during work hours.work areas will be plated for traffic. Bonnie Brae St Scripture St Hickory St 10/23/23 11/20/23 installing conduit across Public Works Inspections Lee Thurmond roadway for dme substation. 7 closures will be rolling at times and full during work hours.work areas will be plated for traffic. 8 Bradshaw St Wilson St Prairie St 01/30/23 11/30/23 Utility installations and Engineering Scott Fettig pavement replacement. 9 Bradshaw St Prairie St Sycamore St 03/13/23 11/30/23 Utility installations and Engineering Scott Fettig pavement replacement. 10 Brightwood Terrace Wilsonwood Dr Longfellow Ln 09/11/23 11/20/23 Utility Installation Engineering Taylor Holt 11 Camellia St Parvin St Laurel St 05/30/23 11/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 12 Chaparral Ct Cooper Branch E Dead End 08/14/23 11/06/23 Utility Replacement Engineering Taylor Holt 13 College Park Dr Peach St Dead End 10/02/23 01/31/24 Street reconstruct Streets Jeff Jones 14 Collins St Johnson St Dead End West 08/22/23 01/05/24 Utility installations and Engineering Scott Fettig pavement replacement. 15 Crawford St Mulberry St Sycamore St 10/09/23 12/11/23 Utility installations and Engineering Scott Fettig pavement replacement. 16 Fowler Dr College Park Peach St 10/02/23 01/31/24 Street reconstruct Streets Jeff Jones 17 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper 18 Highland St Locust St Wainwright St 01/30/23 11/30/23 Utility installations and Engineering Scott Fettig pavement replacement. 19 Industrial St Bell St Mulberry St 07/05/23 12/29/23 Utility installation and roadway Engineering Seth Garcia work Katy Trail Edwards Rd DCTA MedPark Station 08/21/23 11/30/23 A small section of Katy Trail will Other Tracy L.Beck,PE,PMP have intermittent closures to 20 accommodate the construction of the new Mayhill Road Bridge over the DCTA 21 Leslie St Willowwood St Dudley St 08/31/23 01/08/24 Utility installations and Engineering Scott Fettig pavement replacement. 22 Lookout Ln Windsor Dr Westward Dr 10/16/23 11/24/23 Panel and Sidewalk Repair Streets Roy San Miguel 23 Maple St Elm St Carroll Blvd 09/15/23 11/03/23 Utility installations and Scott Fettig pavement replacement. 24 Maple St Carroll Blvd Elm St 07/05/23 11/30/23 Utility installations and Engineering Scott Fettig pavement replacement. 25 Masch Branch Rd Lovers Ln Darby Smith Rd 09/07/23 11/03/23 Base failure Streets Jeff Jones Mayhill Rd IH 35 Colorado Blvd 10/06/23 10/27/23 One lane to be closed for Other Tracy L.Beck,PE,PMP 26 staging construction operations for new bridge 27 Mayhill Rd @ Colorado Blvd 10/06/23 10/31/23 One Turn Lane each direction Engineering Tracy L.Beck,PE,PMP closed to allow material staging. Exported on October 27,2023 11:35:01 AM CDT Street/Intersection From To N�3 escription Department Department Contact 28 Mayhill Rd @ Spencer Rd 03/28/23 11/17/23 Water main tie-in and turn lane Public Works Inspections Ryan Cuba addition 29 McKinney St Mayhill Rd Ryan Rd 05/04/23 10/28/23 Turn lane Public Works Inspections Ryan Cuba 30 McKinney St Loop 288 Mayhill Rd 07/20/23 10/28/23 Sidewalk demo and new Public Works Inspections Ryan Cuba sidewalk 31 Mill Pond Rd Emerson Ln Old North Rd 09/11/23 11/13/23 Utility Installations Engineering Taylor Holt 32 Mingo Rd Mockingbird Ln Sirius Dr 09/25/23 11/10/23 Base Failures Streets Jeff Jones Mingo Rd Nottingham Dr Pertain St 10/25/23 11/30/23 pouring approach and turn lane Public Works Inspections Ryan Cuba 33 flaggers will be present during normal work hours 34 Mulberry St E Wood St Crawford St 10/09/23 12/12/23 Utility installations and Engineering Scott Fettig pavement replacement. 35 Mulberry St E Bell Ave Industrial St 08/21/23 03/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 36 Myrtle St Fort Worth Dr(HW377) Eagle Dr 06/05/23 11/30/23 Utility installations and Engineering Scott Fettig pavement replacement. 37 Myrtle St Maple St Highland St 07/05/23 12/31/23 Utility installations and Scott Fettig pavement replacement. 38 Myrtle St Eagle Dr Maple St 07/05/23 12/31/23 Utility installations and Engineering Scott Fettig pavement replacement. Nicosia St Elm St(HWY 77) Santos Dr 09/11/23 11/10/23 This work belongs to the Other Colton Garrett Northwest Booster Pump Station Project.The contractor will be excavating across Nicosia St.so that they may tie into the 42"water line in the center of the road way. The excavation along with roadway restoration and repairs will take 39 approx 28 days to complete but, has the possibility of being lesser if no issues are uncovered during excavation.A message board will be displayed 1 week prior to closure informing the residents who do not receive these updates.Detours will be provided and maintained throughout the construction. Oak St Thomas St Bonnie Brae St 10/23/23 11/21/23 installing conduit across Public Works Inspections Lee Thurmond roadway for dme substation. 40 closures will be rolling at times and full during work hours.work areas will be plated for traffic. Oak St Thomas St Bonnie Brae St 10/23/23 11/21/23 installing conduit across Public Works Inspections Lee Thurmond roadway for dme substation. 41 closures will be rolling at times and full during work hours.work areas will be plated for traffic. 42 Oakwood Dr McCormick St East Dead End 10/02/23 02/08/24 Utility installations and Engineering Scott Fettig pavement replacement. 43 Palo Verde Dr Brias Ct Montecito Dr 09/08/23 11/10/23 Reconstruct Jeff Jones Panhandle St Bonnie Brae St Eastpark Blvd 10/02/23 10/27/23 Water service taps,and street Private Development Zabdiel Mota 44 panel repairs for east bound lane and turning lane. 45 Parkside Dr Windsor Dr W Bowling Green St 10/16/23 11/03/23 Pavement replacement Engineering Scott Fettig 46 Peach St Bell St N Locust St N 10/02/23 01/31/24 Street reconstruct Streets Jeff Jones 47 Pheasant Hollow St Windbrook St Willow Stone St 10/23/23 11/20/23 Pavement Replacement Engineering Taylor Holt 48 Pheasant Hollow St Willow Stone St Sagewood Ln 10/23/23 11/20/23 Pavement Replacement Engineering Taylor Holt 49F Pickwick Ln Oxford Ln Windsor Dr 08/21/23 11/06/23 Utility Replacement Engineering Taylor Holt Exported on October 27,2023 11:35:01 AM CDT Street/Intersection From To Description Department Department Contact 50 Pierce St Maple St Highland St 07/05/23 11/30/23 Utility installations and Scott Fettig pavement replacement. 51 Plum Hollow Rd Locust St Pheasant Hollow St 10/23/23 11/20/23 Pavement Replacement Engineering Taylor Holt 52 Plum Hollow Rd Locust St Pheasant Hollow St 10/23/23 11/20/23 Pavement Replacement Engineering Taylor Holt Prairie St Lakey St To Cemetery/Halfway down Prairie 08/17/23 11/17/23 Narrow lane closure from Lakey Public Works Inspections Stephany Trammell 53 up to Cemetary before Bradshaw to install new storm drain. 54 Smith St Johnson St Bell Ave 01/30/23 11/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 55 Smith St Dallas Dr(Hwy 77) Hill St 03/06/23 11/03/23 Utility installations and Engineering Scott Fettig pavement replacement. 56 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 11/17/23 Work on manholes and for Lang Public Works Inspections Stephany Trammell Railyard Private Development 57 Sycamore St Wood St Crawford St 10/09/23 12/11/23 Utility installations and Engineering Scott Fettig pavement replacement. 58 Sycamore St Industrial St Wainwright St 04/24/23 12/29/23 Roadway&Utilities Engineering Seth Garcia 59 Sycamore St Exposition St Crawford St 03/13/23 12/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 60 Tanglewood St Locust St Pheasant Hollow St 09/11/23 11/06/23 Pavement replacement Engineering Taylor Holt 61 Trinity Rd Mills Rd Cooper Rd 10/12/23 11/03/23 Installation of force main and Public Works Inspections Ryan Cuba demo of old system 62 Underwood St North Texas Blvd Kendolph Dr 08/28/23 11/03/23 Pavement replacement. Engineering Scott Fettig 63 Wainwright St Prairie St Sycamore St 04/24/23 11/17/23 Roadway,utilities Engineering Seth Garcia 64 Wainwright St Highland St Prairie St 03/13/23 12/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 65 Westwood Dr Dudley St Parvin St 10/30/23 12/08/23 Curb/Sidewalk/Valley Gutter Streets Roy San Miguel repair 66 Wisteria St Parvin St Laurel St 05/30/23 11/03/23 Utility installations and Engineering Scott Fettig pavement replacement. Exported on October 27,2023 11:35:01 AM CDT 3 Street Closure Report: Completed Closures smartsheet • • • Date . •_ • D- • Department Department 1 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 10/06/23 Utility installations and Engineering Scott Fettig pavement replacement. 2 Ave H Hickory St Stella St 09/30/23 10/10/23 Pavement replacement for Public Works Inspections Lee Thurmond electrical substation 3 Carriage Hill Rd Thunderbird Dr Brookhollow Dr 06/05/23 10/06/23 Pavement replacement. Engineering Scott Fettig 4 Colonial Dr Thunderbird Dr Dead End South 07/11/22 10/06/23 Utility installations and Engineering Scott Fettig pavement replacement. 5 Greenway Dr Thunderbird Dr Dead End South 07/11/22 10/06/23 Utility installations and Engineering Scott Fettig pavement replacement. 6 Greenway Dr Thunderbird Dr Windsor Farms Dr 10/07/22 10/06/23 Utility installations and Engineering Scott Fettig pavement replacement. 7 Hickory St W Bonnie Brae St Ave G 09/04/23 09/29/23 work associated with the DME Public Works Inspections Lee Thurmond substation 8 Mounts Ave Oak St W Gregg St 09/05/23 09/29/23 Relocating gas main Atmos Gregory McCutchen 9 Oak St Bonnie Brae St Thomas St 09/30/23 10/10/23 Pavement replacement for Public Works Inspections Lee Thurmond electrical substation 10 Pheasant Hollow St Windbrook St Willow Stone St 09/11/23 10/23/23 Pavement Replacement Engineering Taylor Holt 11 Thomas St Emery St Bellmead Dr 10/09/23 10/13/23 Relocating gas main Atmos Gregory McCutchen 12 Thunderbird Dr Colonial Dr Crestmeadow St 06/05/23 10/06/23 Utility installations and Engineering Scott Fettig pavement replacement. 13 Vista Verde Rd Montecito Dr Dead End East 09/11/23 10/20/23 Street Reconstruct Streets Jeff Jones Windbrook Ct Windbrook St Dead End 07/31/23 09/29/23 This work includes road Other Taylor Holt 14 reconstruction with subgrade stabilization,asphalt paving, and concrete curb and gutter. Windbrook St Pheasant Hollow St Shadow Trl 08/21/23 10/02/23 This work includes road Engineering Taylor Holt 15 reconstruction with subgrade stabilization,asphalt paving, and concrete curb and gutter. 16 Woodrow Ln McKinney St Troy H Lagrone Dr 02/20/23 09/29/23 Water tie in Public Works Inspections Ryan Cuba Exported on October 27,2023 11:35:11 AM CDT