2023/11/03 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Nov 6th - 12th Street/Intersection From To Description Department Department Contact 1 Cherry Tree Ln Clear River Ln dead end south 11/27/23 j 01/12/24 Sidewalk Repair Streets Roy San Miguel 2 Clear River Ln Montecito Dr Country Home Dr 11/27/23 01/12/24 Sidewalk Repair Streets Roy San Miguel 3 Crenshaw Ln Alderbrook or Hayling Way Intersection 11/20/23 01/19/24 Street Panels and Sidewalk Repair Streets Roy San Miguel 4 McKinney St E(301) Bell Ave Oakland St 11/13/23 11/30/23 Sidewalk and ADA repair Streets Roy San Miguel Exported on November 3,2023 11:25:17 AM CDT 2 Street Closure Report: Current Closures smartsheet - re Start Closure End Description Department ff Department Contact 17St Maple St Highland St 10/02/23 12/04/23 Atmos gas relocation Atmos Gavin Petner 2 Eagle Dr Highland St 09/18/23 12/12/23 Relocation of gas lines. Atmos Gavin Petner 3 Parvin St Laurel St 05/30/23 12/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 4 Bell Ave Sycamore St Prairie St 08/21/23 11/10/23 Utility installations and Engineering Scott Fettig pavement replacement. 5 Bernard St Acme St Roselawn Dr 05/30/23 11/30/23 Utility installations and Engineering Scott Fettig pavement replacement. Bonnie Brae St Scripture St Hickory St 10/23/23 11/20/23 installing conduit across Public Works Inspections Lee Thurmond roadway for dme substation. 6 closures will be rolling at times and full during work hours.work areas will be plated for traffic. Bonnie Brae St Scripture St Hickory St 10/23/23 11/20/23 installing conduit across Public Works Inspections Lee Thurmond roadway for dme substation. 7 closures will be rolling at times and full during work hours.work areas will be plated for traffic. Bonnie Brae St US 77(Elm St N) Bronco Way/Riney Rd 11/08/23 11/27/23 Contractor will be installing a 16 Engineering Jesus Perez 8 inch water line off of the new 36 water line along US77. 9 Bradshaw St Wilson St Prairie St 01/30/23 11/30/23 Utility installations and Engineering Scott Fettig pavement replacement. 10 Bradshaw St Prairie St Sycamore St 03/13/23 11/30/23 Utility installations and Engineering Scott Fettig pavement replacement. 11 Brightwood Terrace Wilsonwood Dr Longfellow Ln 09/11/23 11/20/23 Utility Installation Engineering Taylor Holt 12 Camellia St Parvin St Laurel St 05/30/23 12/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 13 Chaparral Ct Cooper Branch E Dead End 08/14/23 11/20/23 Utility Replacement Engineering Taylor Holt 14 College Park Dr Peach St Dead End 10/02/23 01/31/24 Street reconstruct Streets Jeff Jones 15 Collins St Johnson St Dead End West 08/22/23 01/05/24 Utility installations and Engineering Scott Fettig pavement replacement. 16 Crawford St Mulberry St Sycamore St 10/09/23 12/11/23 Utility installations and Engineering Scott Fettig pavement replacement. 17 Fowler Dr College Park Peach St 10/02/23 01/31/24 Street reconstruct Streets Jeff Jones 18 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper 19 Highland St Locust St Wainwright St 01/30/23 11/30/23 Utility installations and Engineering Scott Fettig pavement replacement. 20 Industrial St Bell St Mulberry St 07/05/23 12/29/23 Utility installation and roadway Engineering Seth Garcia work Katy Trail Edwards Rd DCTA MedPark Station 08/21/23 11/30/23 A small section of Katy Trail will Other Tracy L.Beck,PE,PMP have intermittent closures to 21 accommodate the construction of the new Mayhill Road Bridge over the DCTA 22 Leslie St Willowwood St Dudley St 08/31/23 01/08/24 Utility installations and Engineering Scott Fettig pavement replacement. 23 Lookout Ln Windsor Dr Westward Dr 10/16/23 11/24/23 Panel and Sidewalk Repair Streets Roy San Miguel 24 Maple St Carroll Blvd Elm St 07/05/23 11/30/23 Utility installations and Engineering Scott Fettig pavement replacement. 25 Maple St Elm St Carroll Blvd 09/15/23 12/31/23 Utility installations and Scott Fettig pavement replacement. 26 Mayhill Rd @ Colorado Blvd 10/06/23 11/13/23 One Turn Lane each direction Engineering Tracy L.Beck,PE,PMP closed to allow material staging. Mayhill Rd IH 35 Colorado Blvd 10/06/23 11/13/23 One lane to be closed for Other Tracy L.Beck,PE,PMP 27 staging construction operations for new bridge Exported on November 3,2023 11:25:29 AM CDT Street/Intersection From To Description Department Department Contact 28 Mayhill Rd @ Spencer Rd 03/28/23 11/17/23 Water main tie-in and turn lane Public Works Inspections Ryan Cuba addition 29 Mill Pond Rd Emerson Ln Old North Rd 09/11/23 11/13/23 Utility Installations Engineering Taylor Holt 30 Mingo Rd Mockingbird Ln Sirius Dr 09/25/23 11/10/23 Base Failures Streets Jeff Jones Mingo Rd Nottingham Dr Pertain St 10/25/23 11/30/23 pouring approach and turn lane Public Works Inspections Ryan Cuba 31 flaggers will be present during normal work hours 32 Mulberry St E Wood St Crawford St 10/09/23 12/12/23 Utility installations and Engineering Scott Fettig pavement replacement. 33 Mulberry St E Bell Ave Industrial St 08/21/23 03/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 34 Myrtle St Fort Worth Dr(HW377) Eagle Dr 06/05/23 11/30/23 Utility installations and Engineering Scott Fettig pavement replacement. 35 Myrtle St Maple St Highland St 07/05/23 12/31/23 Utility installations and Scott Fettig pavement replacement. 36 Myrtle St Eagle Dr Maple St 07/05/23 12/31/23 Utility installations and Engineering Scott Fettig pavement replacement. Nicosia St Elm St(HWY 77) Santos Dr 09/11/23 11/10/23 This work belongs to the Other Colton Garrett Northwest Booster Pump Station Project.The contractor will be excavating across Nicosia St.so that they may tie into the 42"water line in the center of the road way. The excavation along with roadway restoration and repairs will take 37 approx 28 days to complete but, has the possibility of being lesser if no issues are uncovered during excavation.A message board will be displayed 1 week prior to closure informing the residents who do not receive these updates.Detours will be provided and maintained throughout the construction. Oak St Thomas St Bonnie Brae St 10/23/23 11/21/23 installing conduit across Public Works Inspections Lee Thurmond roadway for dme substation. 38 closures will be rolling at times and full during work hours.work areas will be plated for traffic. Oak St Thomas St Bonnie Brae St 10/23/23 11/21/23 installing conduit across Public Works Inspections Lee Thurmond roadway for dme substation. 39 closures will be rolling at times and full during work hours.work areas will be plated for traffic. 40 Oakwood Dr McCormick St East Dead End 10/02/23 02/08/24 Utility installations and Engineering Scott Fettig pavement replacement. 41 Palo Verde Dr Brias Ct Montecito Dr 09/08/23 11/10/23 Reconstruct Jeff Jones 42 Parkside Dr Windsor Dr W Bowling Green St 10/16/23 12/31/23 Pavement replacement Engineering Scott Fettig 43 Peach St Bell St N Locust St N 10/02/23 01/31/24 Street reconstruct Streets Jeff Jones 44 Pheasant Hollow St Windbrook St Willow Stone St 10/23/23 11/20/23 Pavement Replacement Engineering Taylor Holt 45 Pheasant Hollow St Willow Stone St Sagewood Ln 10/23/23 11/20/23 Pavement Replacement Engineering Taylor Holt 46 Pickwick Ln Oxford Ln Windsor Dr 08/21/23 11/20/23 Utility Replacement Engineering Taylor Holt 47 Pierce St Maple St Highland St 07/05/23 11/30/23 Utility installations and Scott Fettig pavement replacement. 48 Plum Hollow Rd Locust St Pheasant Hollow St 10/23/23 11/20/23 Pavement Replacement Engineering Taylor Holt 49 Plum Hollow Rd Locust St Pheasant Hollow St 10/23/23 11/20/23 Pavement Replacement Engineering Taylor Holt Exported on November 3,2023 11:25:29 AM CDT Street/Intersection From N�3 I Description Department Department Contact Prairie St Lakey St To Cemetary/Halfway down Prairie 08/17/23 11/17/23 Narrow lane closure from Lakey Public Works Inspections Stephany Trammell 50 up to Cemetery before Bradshaw to install new storm drain. 51 Railroad Ave Hickory St McKinney St 11/06/23 11/30/23 Sidewalk repair in front or HR Streets Roy San Miguel 52 Smith St Johnson St Bell Ave 01/30/23 12/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 53 Smith St Dallas Dr(Hwy 77) Hill St 03/06/23 12/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 54 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 11/17/23 Work on manholes and for Lang Public Works Inspections Stephany Trammell Railyard Private Development 55 Sycamore St Wood St Crawford St 10/09/23 12/11/23 Utility installations and Engineering Scott Fettig pavement replacement. 56 Sycamore St Industrial St Wainwright St 04/24/23 12/29/23 Roadway&Utilities Engineering Seth Garcia 57 Sycamore St Exposition St Crawford St 03/13/23 12/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 58 Tanglewood St Locust St Pheasant Hollow St 09/11/23 11/06/23 Pavement replacement Engineering Taylor Holt 59 Trinity Rd Mills Rd Cooper Rd 10/12/23 12/01/23 Installation of force main and Public Works Inspections Ryan Cuba demo of old system 60 Underwood St North Texas Blvd Kendolph Dr 08/28/23 12/31/23 Pavement replacement. Engineering Scott Fettig 61 Wainwright St Prairie St Sycamore St 04/24/23 11/17/23 Roadway,utilities Engineering Seth Garcia 62 Wainwright St Highland St Prairie St 03/13/23 12/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 63 Westwood Dr Dudley St Parvin St 10/30/23 12/08/23 Curb/Sidewalk/Valley Gutter Streets Roy San Miguel repair 64 Windsor Dr(2700) Carriage Hill Rd Westgate Dr 11/06/23 11/30/23 Sidewalk/Curb Repair Streets Roy San Miguel 65 Wisteria St Parvin St Laurel St 05/30/23 12/31/23 Utility installations and Engineering Scott Fettig pavement replacement. Exported on November 3,2023 11:25:29 AM CDT 3 Street Closure Report: Completed Closures smartsheet • • • Date . •_ • D- • Department Department 1 Augusta Dr Colonial Dr Augusta Dr(2900) 07/11/22 10/06/23 Utility installations and Engineering Scott Fettig pavement replacement. 2 Ave H Hickory St Stella St 09/30/23 10/10/23 Pavement replacement for Public Works Inspections Lee Thurmond electrical substation 3 Carriage Hill Rd Thunderbird Dr Brookhollow Dr 06/05/23 10/06/23 Pavement replacement. Engineering Scott Fettig 4 Colonial Dr Thunderbird Dr Dead End South 07/11/22 10/06/23 Utility installations and Engineering Scott Fettig pavement replacement. 5 Greenway Dr Thunderbird Dr Dead End South 07/11/22 10/06/23 Utility installations and Engineering Scott Fettig pavement replacement. 6 Greenway Dr Thunderbird Dr Windsor Farms Dr 10/07/22 10/06/23 Utility installations and Engineering Scott Fettig pavement replacement. 7 Masch Branch Rd Lovers Ln Darby Smith Rd 09/07/23 11/03/23 Base failure Streets Jeff Jones 8 McKinney St Mayhill Rd Ryan Rd 05/04/23 10/28/23 Turn lane Public Works Inspections Ryan Cuba 9 McKinney St Loop 288 Mayhill Rd 07/20/23 10/28/23 Sidewalk demo and new Public Works Inspections Ryan Cuba sidewalk 10 Oak St Bonnie Brae St Thomas St 09/30/23 10/10/23 Pavement replacement for Public Works Inspections Lee Thurmond electrical substation Panhandle St Bonnie Brae St Eastpark Blvd 10/02/23 10/27/23 Water service taps,and street Private Development Zabdiel Mota 11 panel repairs for east bound lane and turning lane. 12 Pheasant Hollow St Windbrook St Willow Stone St 09/11/23 10/23/23 Pavement Replacement Engineering Taylor Holt 13 Thomas St Emery St Bellmead Dr 10/09/23 10/13/23 Relocating gas main Atmos Gregory McCutchen 14 Thunderbird Dr Colonial Dr Crestmeadow St 06/05/23 10/06/23 Utility installations and Engineering Scott Fettig pavement replacement. 15 Vista Verde Rd Montecito Dr Dead End East 09/11/23 10/20/23 Street Reconstruct Streets Jeff Jones Exported on November 3,2023 11:25:41 AM CDT