Loading...
2023/12/29 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Jan 1 st - 7th Street/Intersection From To Description Department Department Contact 1 Brook Lake(5900) Trailside or At Intersection 01/22/24 02/16/24 ADA Sidewalk Repair Streets Roy San Miguel 2 Seven Oaks Ln Swan Park Dr Harvest Moon TO 01/15/24 02/23/24 Concrete Sidewalk Repair Streets Roy San Miguel 3 Spring Valley Dr Twilight or Momingside or 01/08/24 02/16/24 Concrete Curb and Gutter Repair Streets Roy San Miguel 4 Wind River Ln Union Lake Blvd Como Lake Rd 01/15/24 02/02/24 Concrete Sidewalk Repair Streets Roy San Miguel Exported on December 29,2023 9:40:52 AM CST 2 Street Closure Report: Current Closures smartsheet Intersection • Datesure a ti •- • DescriptionD-•, Ir Department 1 Azalea St Parvin St Laurel St 05/30/23 03/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 2 Bell Ave Sycamore St Prairie St 08/21/23 03/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 3 Bernard St Acme St Roselawn Dr 05/30/23 01/30/24 Utility installations and Engineering Scott Fettig pavement replacement. Bonnie Brae St S Walt Parker Dr Willowwood St 01/02/24 01/16/24 contractor installing duct bank Engineering Robin Davis 4 crossing(open cut)BB just south of Walt Parker 5 Bradshaw St Wilson St Prairie St 01/30/23 01/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 6 Bradshaw St Prairie St Sycamore St 03/13/23 01/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 7 Brightwood Terrace Wilsonwood Dr Longfellow Ln 09/11/23 01/15/24 Utility Installation&Street Engineering Taylor Holt Reconstruction 8 Camellia St Parvin St Laurel St 05/30/23 03/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 9 Carroll Blvd Oak Mulberry 12/26/23 01/03/24 Restoration Atmos Sheldon Gatewood 10 Chaparral Ct Cooper Branch E Dead End 08/14/23 01/15/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 11 Cherry Tree Ln Clear River Ln dead end south 11/27/23 01/12/24 Sidewalk Repair Streets Roy San Miguel 12 Chittamwood Ct Desert Willow Cul V Sac 01/02/24 02/02/24 Concrete Panel and Sidewalk Streets Roy San Miguel Repair 13 Churchill Dr Churchill Cir Windsor Dr 12/11/23 01/29/24 Utility installations and Engineering Taylor Holt pavement replacement 14 Clear River Ln Montecito Dr Country Home Dr 11/27/23 01/12/24 Sidewalk Repair Streets Roy San Miguel 15 College Park Dr Peach St Dead End 10/02/23 01/31/24 Street reconstruct Streets Jeff Jones 16 Collins St Johnson St Dead End West 08/22/23 01/05/24 Utility installations and Engineering Scott Fettig pavement replacement. 17 Crawford St Mulberry St Sycamore St 10/09/23 01/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 18 Crenshaw Ln Alderbrook Dr Hayling Way Intersection 11/20/23 01/19/24 Street Panels and Sidewalk Streets Roy San Miguel Repair 19 Fowler Dr College Park Peach St 10/02/23 01/31/24 Street reconstruct Streets Jeff Jones 20 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper 21 Highland St Locust St Wainwright St 01/30/23 01/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 22 Industrial St Bell St Mulberry St 07/05/23 01/26/24 Utility installation and roadway Engineering Seth Garcia work 23 Leslie St Willowwood St Dudley St 08/31/23 01/08/24 Utility installations and Engineering Scott Fettig pavement replacement. 24 Maple St Carroll Blvd Elm St 07/05/23 01/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 25 Maple St Elm St Carroll Blvd 09/15/23 03/31/24 Utility installations and Scott Fettig pavement replacement. 26 Matthew Ave Thistle Hill Intersection Andrew Ave 12/18/23 01/12/24 ADA Repair Streets Roy San Miguel 27 Mayhill Rd @ Spencer Rd 03/28/23 01/12/24 Water main tie-in and turn lane Public Works Inspections Ryan Cuba addition 28 Meadow Ln Sagewood St Shadow Trail 11/29/23 01/08/24 Street Reconstruction Engineering Taylor Holt 29 Mill Pond Rd Emerson Ln Old North Rd 09/11/23 01/08/24 Utility Installations&Pavement Engineering Taylor Holt Reconstruction Mingo Rd Nottingham Dr Pertain St 10/25/23 01/16/24 pouring approach and turn lane Public Works Inspections Ryan Cuba 30 flaggers will be present during normal work hours Exported on December 29,2023 3:09:53 PM CST Street/Intersection From To Description Department Department Contact 31 Mulberry St Wood St Crawford St 10/09/23 01/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 32 Mulberry St Bell Ave Industrial St 08/21/23 03/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 33 Myrtle St Fort Worth Dr(HW377) Eagle Dr 06/05/23 01/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 34 Myrtle St Maple St Highland St 07/05/23 04/01/24 Utility installations and Scott Fettig pavement replacement. 35 Myrtle St Eagle Dr Maple St 07/05/23 04/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 36 Oakwood Dr McCormick St East Dead End 10/02/23 02/08/24 Utility installations and Engineering Scott Fettig pavement replacement. 37 Peach St Bell St N Locust St N 10/02/23 01/31/24 Street reconstruct Streets Jeff Jones 38 Pickwick Ln Oxford Ln Windsor Dr 08/21/23 01/15/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 39 Pierce St Maple St Highland St 07/05/23 03/01/24 Utility installations and Scott Fettig pavement replacement. Prairie St Lakey St To Cemetery/Halfway down Prairie 08/17/23 01/19/24 Narrow lane closure from Lakey Public Works Inspections Stephany Trammell 40 up to Cemetery before Bradshaw to install new storm drain. 41 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 01/19/24 Paving improvements from Public Works Inspections Stephany Trammell Exposition to Railroad 42 Sycamore St Industrial St Wainwright St 04/24/23 01/26/24 Roadway&Utilities Engineering Seth Garcia 43 Sycamore St Wood St Crawford St 10/09/23 01/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 44 Sycamore St Exposition St Crawford St 03/13/23 04/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 45 Trinity Rd Mills Rd Cooper Rd 10/12/23 01/05/24 Installation of force main and Public Works Inspections Ryan Cuba demo of old system 46 Underwood St North Texas Blvd Kendolph Dr 08/28/23 03/31/24 Pavement replacement. Engineering Scott Fettig 47 Wainwright St Highland St Prairie St 03/13/23 03/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 48 Wellington Dr Just North of Heather Ln Churchill Dr 12/11/23 01/29/24 Utility installations and Engineering Taylor Holt pavement replacement 49 Willowwood St Bernard St Jacqueline Dr 12/27/23 01/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 50 Wind River Ln Como Lake Rd Shoreline Dr 12/11/23 01/26/24 Concrete Panel Repair Streets Roy San Miguel 51 Wisteria St Parvin St Laurel St 05/30/23 03/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 52 Woodrow Ln McKinney St Morse Rd 10/12/23 01/12/24 remove and replace turn lane at Public Works Inspections Ryan Cuba duchess dr Exported on December 29,2023 3:09:53 PM CST 3 Street Closure Report: Completed Closures smartsheet Street/Intersection From Closure Start losure End Description Departmen-L ., Department Contact Date 7Date 1 Avenue C Eagle Dr Highland St 09/18/23 12/12/23 Relocation of gas lines. Atmos Gavin Petner 2 Avenue C Maple St Highland St 10/02/23 12/30/23 Atmos gas relocation Atmos Gavin Petner 3 Barcelona St N 1-35 Service Rd Mesa Dr 12/07/23 12/12/23 Atmos gas relocation Atmos Gavin Petner 4 Barcelona St N 1-35 Service Rd Mesa Dr 12/07/23 12/22/23 Atmos gas relocation Atmos Gavin Petner Bonnie Brae St Elm St(US 77) Bronco Way/Riney Rd 11/13/23 12/28/23 Contractor will be installing a 16 Engineering Jesus Perez 5 inch water line off of the new 36 water line along US77. 6 Buena Vista Dr Montecito Rd Mira Vista Dr 11/06/23 12/29/23 Street reconstruct Streets Jeff Jones Katy Trail Edwards Rd DCTA MedPark Station 08/21/23 11/30/23 A small section of Katy Trail will Other Tracy L.Beck,PE,PMP have intermittent closures to 7 accommodate the construction of the new Mayhill Road Bridge over the DCTA 8 Lookout Ln Windsor Dr Westward Dr 10/16/23 12/08/23 Panel and Sidewalk Repair Streets Roy San Miguel 9 McKinney St E Bell Ave Oakland St 11/13/23 11/30/23 Sidewalk and ADA repair Streets Roy San Miguel 10 Meadow Ln PI Hercules Ln Meadow Ln 11/29/23 12/01/23 Street Reconstruction Taylor Holt 11 Mingo Rd Mockingbird Ln Sirius Dr 09/25/23 12/29/23 Base Failures Streets Jeff Jones 12 Parkside Dr Windsor Dr W Bowling Green St 10/16/23 12/31/23 Pavement replacement Engineering Scott Fettig 13 Pheasant Hollow St Willow Stone St Sagewood Ln 10/23/23 12/04/23 Pavement Replacement Engineering Taylor Holt 14 Plum Hollow Rd Locust St Pheasant Hollow St 10/23/23 12/04/23 Pavement Replacement Engineering Taylor Holt 15 Plum Hollow Rd Locust St Pheasant Hollow St 10/23/23 12/04/23 Pavement Replacement Engineering Taylor Holt 16 Railroad Ave Hickory St McKinney St 11/06/23 11/30/23 Sidewalk repair in front or HR Streets Roy San Miguel 17 Smith St Johnson St Bell Ave 01/30/23 12/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 18 Smith St Dallas Dr(Hwy 77) Hill St 03/06/23 12/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 19 Westwood Dr Dudley St Parvin St 10/30/23 12/08/23 Curb/Sidewalk/Valley Gutter Streets Roy San Miguel repair 20I Woodrow Ln McKinney St Morse St 11/17/23 11/30/23 Remove and replace turn lane Public Works Inspections Lee Thurmond paving Exported on December 29,2023 9:41:16 AM CST