Loading...
2024/01/05 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Jan 8th - 14th Street/Intersection Description Department Department Contact EM 1 Brook Lake(5900) @ Trailside Dr "Itsection 01/22/24 02/16/24 ADA Sidewalk Repair Streets I Roy San Miguel 2 Seven Oaks Ln Swan Park or Harvest Moon Trl 01/15/24 02/23/24 Concrete Sidewalk Repair Streets Roy San Miguel 3 Wind River Ln Union Lake Blvd Como Lake Rd 01/15/24 02/02/24 Concrete Sidewalk Repair Streets Roy San Miguel Exported on January 5,2024 11:43:09 AM CST 2 Street Closure Report: Current Closures smartsheet Street/Intersection Closure a Description Department Ir Department Contact Date I 1 Azalea St Parvin St Laurel St 05/30/23 03/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 2 Bell Ave Sycamore St Prairie St 08/21/23 03/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 3 Bernard St Acme St Roselawn Dr 05/30/23 01/30/24 Utility installations and Engineering Scott Fettig pavement replacement. Bonnie Brae St S Walt Parker Dr Willowwood St 01/02/24 01/16/24 contractor installing duct bank Engineering Robin Davis 4 crossing(open cut)BB just south of Walt Parker 5 Bradshaw St Wilson St Prairie St 01/30/23 01/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 6 Bradshaw St Prairie St Sycamore St 03/13/23 01/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 7 Brightwood Terrace Wilsonwood Dr Longfellow Ln 09/11/23 01/15/24 Utility Installation&Street Engineering Taylor Holt Reconstruction 8 Camellia St Parvin St Laurel St 05/30/23 03/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 9 Chaparral Ct Cooper Branch E Dead End 08/14/23 01/15/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 10 Cherry Tree Ln Clear River Ln dead end south 11/27/23 01/12/24 Sidewalk Repair Streets Roy San Miguel 11 Chittamwood Ct Desert Willow Cul V Sac 01/02/24 02/02/24 Concrete Panel and Sidewalk Streets Roy San Miguel Repair 12 Churchill Dr Churchill Cir Windsor Dr 12/11/23 01/29/24 Utility installations and Engineering Taylor Holt pavement replacement 13 Clear River Ln Montecito Dr Country Home Dr 11/27/23 01/12/24 Sidewalk Repair Streets Roy San Miguel 14 College Park Dr Peach St Dead End 10/02/23 01/31/24 Street reconstruct Streets Jeff Jones 15 Collins St Johnson St Dead End West 08/22/23 04/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 16 Crawford St Mulberry St Sycamore St 10/09/23 01/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 17 Crenshaw Ln Alderbrook Dr Hayling Way Intersection 11/20/23 01/19/24 Street Panels and Sidewalk Streets Roy San Miguel Repair 18 Fowler Dr College Park Peach St 10/02/23 01/31/24 Street reconstruct Streets Jeff Jones 19 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper 20 Highland St Locust St Wainwright St 01/30/23 01/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 21 Industrial St Bell St Mulberry St 07/05/23 01/26/24 Utility installation and roadway Engineering Seth Garcia work 22 Leslie St Willowwood St Dudley St 08/31/23 03/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 23 Maple St Carroll Blvd Elm St 07/05/23 01/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 24 Maple St Elm St Carroll Blvd 09/15/23 03/31/24 Utility installations and Scott Fettig pavement replacement. 25 Matthew Ave Thistle Hill Intersection Andrew Ave 12/18/23 01/12/24 ADA Repair Streets Roy San Miguel 26 Mayhill Rd @ Spencer Rd 03/28/23 01/12/24 Water main tie-in and turn lane Public Works Inspections Ryan Cuba addition 27 Meadow Ln Sagewood St Shadow Trail 11/29/23 01/15/24 Street Reconstruction Engineering Taylor Holt 28 Mill Pond Rd Emerson Ln Old North Rd 09/11/23 02/05/24 Utility Installations&Pavement Engineering Taylor Holt Reconstruction Mingo Rd Nottingham Dr Pertain St 10/25/23 01/16/24 pouring approach and turn lane Public Works Inspections Ryan Cuba 29 flaggers will be present during normal work hours 30 Mulberry St Wood St Crawford St 10/09/23 01/31/24 Utility installations and Engineering Scott Fettig pavement replacement. Exported on January 5,2024 11:43:21 AM CST Street/Intersection From To Description Department Department Contact 31 Mulberry St Bell Ave Industrial St 08/21/23 03/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 32 Myrtle St Fort Worth Dr(HW377) Eagle Dr 06/05/23 01/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 33 Myrtle St Maple St Highland St 07/05/23 04/01/24 Utility installations and Scott Fettig pavement replacement. 34 Myrtle St Eagle Dr Maple St 07/05/23 04/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 35 Oakwood Dr McCormick St East Dead End 10/02/23 02/08/24 Utility installations and Engineering Scott Fettig pavement replacement. 36 Peach St Bell St N Locust St N 10/02/23 01/31/24 Street reconstruct Streets Jeff Jones 37 Pickwick Ln Oxford Ln Windsor Dr 08/21/23 01/15/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 38 Pierce St Maple St Highland St 07/05/23 03/01/24 Utility installations and Scott Fettig pavement replacement. Prairie St Lakey St To Cemetary/Halfway down Prairie 08/17/23 01/19/24 Narrow lane closure from Lakey Public Works Inspections Stephany Trammell 39 up to Cemetery before Bradshaw to install new storm drain. 40 Spring Valley Dr Twilight Dr Morningside Dr 01/08/24 02/16/24 Concrete Curb and Gutter Streets Roy San Miguel Repair 41 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 01/19/24 Paving improvements from Public Works Inspections Stephany Trammell Exposition to Railroad 42 Sycamore St Industrial St Wainwright St 04/24/23 01/26/24 Roadway&Utilities Engineering Seth Garcia 43 Sycamore St Wood St Crawford St 10/09/23 01/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 44 Sycamore St Exposition St Crawford St 03/13/23 04/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 45 Underwood St North Texas Blvd Kendolph Dr 08/28/23 03/31/24 Pavement replacement. Engineering Scott Fettig 46 Wainwright St Highland St Prairie St 03/13/23 03/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 47 Wellington Dr Just North of Heather Ln Churchill Dr 12/11/23 01/29/24 Utility installations and Engineering Taylor Holt pavement replacement 48 Willowwood St Bernard St Jacqueline Dr 12/27/23 01/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 49 Wind River Ln Como Lake Rd Shoreline Dr 12/11/23 01/26/24 Concrete Panel Repair Streets Roy San Miguel 50 Wisteria St Parvin St Laurel St 05/30/23 03/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 51 Woodrow Ln McKinney St Morse Rd 10/12/23 01/12/24 remove and replace turn lane at Public Works Inspections Ryan Cuba duchess dr Exported on January 5,2024 11:43:21 AM CST 3 Street Closure Report: Completed Closures smartsheet Street/Intersection From Closure Start losure End Description Departmen-L ., Department Contact Date 7Date 1 Avenue C Eagle Dr Highland St 09/18/23 12/12/23 Relocation of gas lines. Atmos Gavin Petner 2 Avenue C Maple St Highland St 10/02/23 12/30/23 Atmos gas relocation Atmos Gavin Petner 3 Barcelona St N 1-35 Service Rd Mesa Dr 12/07/23 12/12/23 Atmos gas relocation Atmos Gavin Petner 4 Barcelona St N 1-35 Service Rd Mesa Dr 12/07/23 12/22/23 Atmos gas relocation Atmos Gavin Petner Bonnie Brae St Elm St(US 77) Bronco Way/Riney Rd 11/13/23 12/28/23 Contractor will be installing a 16 Engineering Jesus Perez 5 inch water line off of the new 36 water line along US77. 6 Buena Vista Dr Montecito Rd Mira Vista Dr 11/06/23 12/29/23 Street reconstruct Streets Jeff Jones 7 Carroll Blvd Oak Mulberry 12/26/23 01/03/24 Restoration Atmos Sheldon Gatewood 8 Lookout Ln Windsor Dr Westward Dr 10/16/23 12/08/23 Panel and Sidewalk Repair Streets Roy San Miguel 9 Mingo Rd Mockingbird Ln Sirius Dr 09/25/23 12/29/23 Base Failures Streets Jeff Jones 10 Parkside Dr Windsor Dr W Bowling Green St 10/16/23 12/31/23 Pavement replacement Engineering Scott Fettig 11 Smith St Johnson St Bell Ave 01/30/23 12/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 12 Smith St Dallas Dr(Hwy 77) Hill St 03/06/23 12/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 13 Trinity Rd Mills Rd Cooper Rd 10/12/23 01/05/24 Installation of force main and Public Works Inspections Ryan Cuba demo of old system 14 Westwood Dr Dudley St Parvin St 10/30/23 12/08/23 Curb/Sidewalk/Valley Gutter Streets Roy San Miguel repair Exported on January 5,2024 11:43:31 AM CST