Street/Intersection From To Description Department Department Contact
1 Brookside or(5900) @ Trailside or At Intersection 1 02/05/24 1 03/01/24 ADA Sidewalk Repair Streets Roy San Miguel
Roselawn Dr Roselawn Cir Railroad Tracks 02/05/24 03/29/24 Paving,TxDot guardrail,Install new box culvert. Private Development Taylor Hardgrave
2 W,new road for Roselawn.Eagle Creek PH
3A-4
Exported on January 26,2024 11:35:04 AM CST Page 1 of 1
2 Street Closure Report: Current Closures smartsheet
Intersection • • fi •- • DescriptionD-•, Ir Department
Date
1 Azalea St Parvin St Laurel St 05/30/23 03/30/24 Utility installations and Engineering Scott Fettig
pavement replacement.
2 Bell Ave Sycamore St Prairie St 08/21/23 03/31/24 Utility installations and Engineering Scott Fettig
pavement replacement.
3 Bernard St Acme St Roselawn Dr 05/30/23 03/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
4 Bolivar St Congress St Parkway St 01/25/24 01/29/24 Concrete restoration Public Works Inspections Alexander Cervantes
Wastewater
5 Bradshaw St Wilson St Prairie St 01/30/23 03/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
6 Bradshaw St Prairie St Sycamore St 03/13/23 03/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
7 Buena Vista Dr Montecito Rd Mira Vista Dr 11/06/23 02/16/24 Street reconstruct Streets Jeff Jones
8 Buena Vista Dr Montecito Rd Mira Vista Dr 11/06/23 03/29/24 Reconstruct Streets Jeff Jones
9 Camellia St Parvin St Laurel St 05/30/23 03/30/24 Utility installations and Engineering Scott Fettig
pavement replacement.
10 Chaparral Ct Cooper Branch E Dead End 08/14/23 02/12/24 Utility Replacement&Street Engineering Taylor Holt
Reconstruction
11 Chittamwood Ct Desert Willow Cul V Sac 01/02/24 02/16/24 Concrete Panel and Sidewalk Streets Roy San Miguel
Repair
12 Churchill Dr Churchill Cir Windsor Dr 12/11/23 02/12/24 Utility installations and Engineering Taylor Holt
pavement replacement
13 College Park Dr Peach St Dead End 10/02/23 03/29/24 Street reconstruct Streets Jeff Jones
14 College Park Dr Peach St Dead End 10/02/23 03/29/24 Reconstruct Streets Jeff Jones
15 Collins St Johnson St Dead End West 08/22/23 04/30/24 Utility installations and Engineering Scott Fettig
pavement replacement.
16 Crawford St Mulberry St Sycamore St 10/09/23 05/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
17 Crescent St Ector St Hillcrest St 12/27/23 05/03/24 Utility installations and Engineering Scott Fettig
pavement replacement.
18 Fowler Dr College Park Dr Peach St 10/02/23 03/29/24 Street reconstruct Streets Jeff Jones
19 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper
20 Highland St Locust St Wainwright St 01/30/23 05/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
21 Hillcrest St Panhandle St Crescent St 12/27/23 05/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
22 Industrial St Bell St Mulberry St 07/05/23 02/09/24 Utility installation and roadway Engineering Seth Garcia
work
23 Jamestown Ln Mistywood Ln Locksley Ln 01/22/24 03/25/24 Utility Replacement&Street Engineering Taylor Holt
Reconstruction
24 Leslie St Willowwood St Dudley St 08/31/23 03/31/24 Utility installations and Engineering Scott Fettig
pavement replacement.
25 Maid Marion PI Jamestown Ln Locksley Ln 01/24/24 03/25/24 Utility Replacement&Street Engineering Taylor Holt
Reconstruction
26 Maple St Elm St Carroll Blvd 09/15/23 03/31/24 Utility installations and Scott Fettig
pavement replacement.
27 Maple St Carroll Blvd Elm St 07/05/23 05/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
28 Maple St Ave D Ave A 01/22/24 08/01/24 Pavement replacement. Engineering Scott Fettig
29 Matthew Ave Thistle Hill Intersection Andrew Ave 12/18/23 02/02/24 ADA Repair Streets Roy San Miguel
30 Mayhill Rd @ Spencer Rd 03/28/23 02/29/24 Water main tie-in and turn lane Public Works Inspections Ryan Cuba
addition
Exported on January 26,2024 11:33:14 AM CST Page 1 of 2
Street/Intersection From To Description Department Department Contact
Mayhill Rd IH 35E Colorado Blvd 01/31/24 03/24/24 This closure will encompass the Engineering Tracy L.Beck,PE,PIMP
31 reconstruction of the Colorado
and Mayhill Intersection.
32 Meadow View Ct Fallmeadow St Dead end 01/18/24 02/16/24 Replace asphalt in cul-de-sac Streets Jeff Jones
33 Mill Pond Rd Emerson Ln Old North Rd 09/11/23 02/05/24 Utility Installations&Pavement Engineering Taylor Holt
Reconstruction
Mingo Rd Nottingham Dr Pertain St 10/25/23 02/29/24 pouring approach and turn lane Public Works Inspections Ryan Cuba
34 flaggers will be present during
normal work hours
35 Mulberry St Bell Ave Industrial St 08/21/23 03/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
36 Mulberry St Wood St Crawford St 10/09/23 05/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
37 Myrtle St Fort Worth Dr(HW377) Eagle Dr 06/05/23 03/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
38 Myrtle St Maple St Highland St 07/05/23 04/01/24 Utility installations and Scott Fettig
pavement replacement.
39 Myrtle St Eagle Dr Maple St 07/05/23 04/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
40 Oak St Bonnie Brae St Thomas St 01/19/24 02/09/24 work associated with the DIME Public Works Inspections Lee Thurmond
substation
41 Oakwood Dr McCormick St East Dead End 10/02/23 02/08/24 Utility installations and Engineering Scott Fettig
pavement replacement.
42 Peach St Bell St N Locust St N 10/02/23 03/29/24 Street reconstruct Streets Jeff Jones
43 Pickwick Ln Oxford Ln Windsor Dr 08/21/23 02/12/24 Utility Replacement&Street Engineering Taylor Holt
Reconstruction
44 Pierce St Maple St Highland St 07/05/23 03/01/24 Utility installations and Scott Fettig
pavement replacement.
Prairie St Lakey St To Cemetary/Halfway down Prairie 08/17/23 02/09/24 Narrow lane closure from Lakey Public Works Inspections Stephany Trammell
45 up to Cemetery before
Bradshaw to install new storm
drain.
46 Seven Oaks Ln Swan Park Dr Harvest Moon Trl 01/29/24 03/08/24 Concrete Sidewalk Repair Streets Roy San Miguel
47 Spring Valley Dr Twilight Dr Morningside Dr 01/08/24 03/01/24 Concrete Curb and Gutter Streets Roy San Miguel
Repair
48 Sycamore St Industrial St Wainwright St 04/24/23 03/01/24 Roadway&Utilities Engineering Scott Fettig
49 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 03/08/24 Paving improvements from Public Works Inspections Stephany Trammell
Exposition to Railroad
50 Sycamore St Wood St Crawford St 10/09/23 04/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
51 Sycamore St Exposition St Crawford St 03/13/23 04/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
52 Underwood St North Texas Blvd Kendolph Dr 08/28/23 03/31/24 Pavement replacement. Engineering Scott Fettig
53 Wainwright St Highland St Prairie St 03/13/23 03/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
54 Wellington Dr Just North of Heather Ln Churchill Dr 12/11/23 02112/24 Utility installations and Engineering Taylor Holt
pavement replacement
55 Willowwood St Bernard St Jacqueline Dr 12/27/23 03/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
56 Wind River Ln Union Lake Blvd Como Lake Rd 01/29/24 02/16/24 Concrete Sidewalk Repair Streets Roy San Miguel
57 Wisteria St Parvin St Laurel St 05/30/23 03/31/24 Utility installations and Engineering Scott Fettig
pavement replacement.
58 Woodrow Ln McKinney St Morse Rd 10/12/23 02/29/24 remove and replace turn lane at Public Works Inspections Ryan Cuba
duchess dr
Exported on January 26,2024 11:33:14 AM CST Page 2 of 2
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection From Closure Start re End Description Department- Department Contact
losu
1 Avenue C Maple St Highland St 10/02/23 12/30/23 Atmos gas relocation Atmos Gavin Petner
Bonnie Brae St Elm St(US 77) Bronco Way/Riney Rd 11/13/23 12/28/23 Contractor will be installing a 16 Engineering Jesus Perez
2 inch water line off of the new 36
water line along US77.
Bonnie Brae St S Walt Parker Dr Willowwood St 01/02/24 01/19/24 contractor installing duct bank Engineering Robin Davis
3 crossing(open cut)BB just
south of Walt Parker
4 Brightwood Terrace Wilsonwood Dr Longfellow Ln 09/11/23 01/12/24 Utility Installation&Street Engineering Taylor Holt
Reconstruction
5 Carroll Blvd Oak Mulberry 12/26/23 01/03/24 Restoration Atmos Sheldon Gatewood
6 Cherry Tree Ln Clear River Ln dead end south 11/27/23 01/12/24 Sidewalk Repair Streets Roy San Miguel
7 Clear River Ln Montecito Dr Country Home Dr 11/27/23 01/12/24 Sidewalk Repair Streets Roy San Miguel
8 Crenshaw Ln Alderbrook Dr Hayling Way Intersection 11/20/23 01/12/24 Street Panels and Sidewalk Streets Roy San Miguel
Repair
9 Meadow Ln Sagewood St Shadow Trail 11/29/23 01/15/24 Street Reconstruction Engineering Taylor Holt
10 Mingo Rd Mockingbird Ln Sirius Dr 09/25/23 12/29/23 Base Failures Streets Jeff Jones
11 Parkside Dr Windsor Dr W Bowling Green St 10/16/23 12/31/23 Pavement replacement Engineering Scott Fettig
12 Smith St Johnson St Bell Ave 01/30/23 12/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
13 Smith St Dallas Dr(Hwy 77) Hill St 03/06/23 12/31/23 Utility installations and Engineering Scott Fettig
pavement replacement.
14 Trinity Rd Mills Rd Cooper Rd 10/12/23 01/05/24 Installation of force main and Public Works Inspections Ryan Cuba
demo of old system
15 Wind River Ln Como Lake Rd Shoreline Dr 12/11/23 01/19/24 Concrete Panel Repair Streets Roy San Miguel