Loading...
2024/01/26 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Jan 29th- Feb 4th Street/Intersection From To Description Department Department Contact 1 Brookside or(5900) @ Trailside or At Intersection 1 02/05/24 1 03/01/24 ADA Sidewalk Repair Streets Roy San Miguel Roselawn Dr Roselawn Cir Railroad Tracks 02/05/24 03/29/24 Paving,TxDot guardrail,Install new box culvert. Private Development Taylor Hardgrave 2 W,new road for Roselawn.Eagle Creek PH 3A-4 Exported on January 26,2024 11:35:04 AM CST Page 1 of 1 2 Street Closure Report: Current Closures smartsheet Intersection • • fi •- • DescriptionD-•, Ir Department Date 1 Azalea St Parvin St Laurel St 05/30/23 03/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 2 Bell Ave Sycamore St Prairie St 08/21/23 03/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 3 Bernard St Acme St Roselawn Dr 05/30/23 03/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 4 Bolivar St Congress St Parkway St 01/25/24 01/29/24 Concrete restoration Public Works Inspections Alexander Cervantes Wastewater 5 Bradshaw St Wilson St Prairie St 01/30/23 03/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 6 Bradshaw St Prairie St Sycamore St 03/13/23 03/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 7 Buena Vista Dr Montecito Rd Mira Vista Dr 11/06/23 02/16/24 Street reconstruct Streets Jeff Jones 8 Buena Vista Dr Montecito Rd Mira Vista Dr 11/06/23 03/29/24 Reconstruct Streets Jeff Jones 9 Camellia St Parvin St Laurel St 05/30/23 03/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 10 Chaparral Ct Cooper Branch E Dead End 08/14/23 02/12/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 11 Chittamwood Ct Desert Willow Cul V Sac 01/02/24 02/16/24 Concrete Panel and Sidewalk Streets Roy San Miguel Repair 12 Churchill Dr Churchill Cir Windsor Dr 12/11/23 02/12/24 Utility installations and Engineering Taylor Holt pavement replacement 13 College Park Dr Peach St Dead End 10/02/23 03/29/24 Street reconstruct Streets Jeff Jones 14 College Park Dr Peach St Dead End 10/02/23 03/29/24 Reconstruct Streets Jeff Jones 15 Collins St Johnson St Dead End West 08/22/23 04/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 16 Crawford St Mulberry St Sycamore St 10/09/23 05/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 17 Crescent St Ector St Hillcrest St 12/27/23 05/03/24 Utility installations and Engineering Scott Fettig pavement replacement. 18 Fowler Dr College Park Dr Peach St 10/02/23 03/29/24 Street reconstruct Streets Jeff Jones 19 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper 20 Highland St Locust St Wainwright St 01/30/23 05/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 21 Hillcrest St Panhandle St Crescent St 12/27/23 05/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 22 Industrial St Bell St Mulberry St 07/05/23 02/09/24 Utility installation and roadway Engineering Seth Garcia work 23 Jamestown Ln Mistywood Ln Locksley Ln 01/22/24 03/25/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 24 Leslie St Willowwood St Dudley St 08/31/23 03/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 25 Maid Marion PI Jamestown Ln Locksley Ln 01/24/24 03/25/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 26 Maple St Elm St Carroll Blvd 09/15/23 03/31/24 Utility installations and Scott Fettig pavement replacement. 27 Maple St Carroll Blvd Elm St 07/05/23 05/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 28 Maple St Ave D Ave A 01/22/24 08/01/24 Pavement replacement. Engineering Scott Fettig 29 Matthew Ave Thistle Hill Intersection Andrew Ave 12/18/23 02/02/24 ADA Repair Streets Roy San Miguel 30 Mayhill Rd @ Spencer Rd 03/28/23 02/29/24 Water main tie-in and turn lane Public Works Inspections Ryan Cuba addition Exported on January 26,2024 11:33:14 AM CST Page 1 of 2 Street/Intersection From To Description Department Department Contact Mayhill Rd IH 35E Colorado Blvd 01/31/24 03/24/24 This closure will encompass the Engineering Tracy L.Beck,PE,PIMP 31 reconstruction of the Colorado and Mayhill Intersection. 32 Meadow View Ct Fallmeadow St Dead end 01/18/24 02/16/24 Replace asphalt in cul-de-sac Streets Jeff Jones 33 Mill Pond Rd Emerson Ln Old North Rd 09/11/23 02/05/24 Utility Installations&Pavement Engineering Taylor Holt Reconstruction Mingo Rd Nottingham Dr Pertain St 10/25/23 02/29/24 pouring approach and turn lane Public Works Inspections Ryan Cuba 34 flaggers will be present during normal work hours 35 Mulberry St Bell Ave Industrial St 08/21/23 03/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 36 Mulberry St Wood St Crawford St 10/09/23 05/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 37 Myrtle St Fort Worth Dr(HW377) Eagle Dr 06/05/23 03/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 38 Myrtle St Maple St Highland St 07/05/23 04/01/24 Utility installations and Scott Fettig pavement replacement. 39 Myrtle St Eagle Dr Maple St 07/05/23 04/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 40 Oak St Bonnie Brae St Thomas St 01/19/24 02/09/24 work associated with the DIME Public Works Inspections Lee Thurmond substation 41 Oakwood Dr McCormick St East Dead End 10/02/23 02/08/24 Utility installations and Engineering Scott Fettig pavement replacement. 42 Peach St Bell St N Locust St N 10/02/23 03/29/24 Street reconstruct Streets Jeff Jones 43 Pickwick Ln Oxford Ln Windsor Dr 08/21/23 02/12/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 44 Pierce St Maple St Highland St 07/05/23 03/01/24 Utility installations and Scott Fettig pavement replacement. Prairie St Lakey St To Cemetary/Halfway down Prairie 08/17/23 02/09/24 Narrow lane closure from Lakey Public Works Inspections Stephany Trammell 45 up to Cemetery before Bradshaw to install new storm drain. 46 Seven Oaks Ln Swan Park Dr Harvest Moon Trl 01/29/24 03/08/24 Concrete Sidewalk Repair Streets Roy San Miguel 47 Spring Valley Dr Twilight Dr Morningside Dr 01/08/24 03/01/24 Concrete Curb and Gutter Streets Roy San Miguel Repair 48 Sycamore St Industrial St Wainwright St 04/24/23 03/01/24 Roadway&Utilities Engineering Scott Fettig 49 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 03/08/24 Paving improvements from Public Works Inspections Stephany Trammell Exposition to Railroad 50 Sycamore St Wood St Crawford St 10/09/23 04/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 51 Sycamore St Exposition St Crawford St 03/13/23 04/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 52 Underwood St North Texas Blvd Kendolph Dr 08/28/23 03/31/24 Pavement replacement. Engineering Scott Fettig 53 Wainwright St Highland St Prairie St 03/13/23 03/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 54 Wellington Dr Just North of Heather Ln Churchill Dr 12/11/23 02112/24 Utility installations and Engineering Taylor Holt pavement replacement 55 Willowwood St Bernard St Jacqueline Dr 12/27/23 03/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 56 Wind River Ln Union Lake Blvd Como Lake Rd 01/29/24 02/16/24 Concrete Sidewalk Repair Streets Roy San Miguel 57 Wisteria St Parvin St Laurel St 05/30/23 03/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 58 Woodrow Ln McKinney St Morse Rd 10/12/23 02/29/24 remove and replace turn lane at Public Works Inspections Ryan Cuba duchess dr Exported on January 26,2024 11:33:14 AM CST Page 2 of 2 3 Street Closure Report: Completed Closures smartsheet Street/Intersection From Closure Start re End Description Department- Department Contact losu 1 Avenue C Maple St Highland St 10/02/23 12/30/23 Atmos gas relocation Atmos Gavin Petner Bonnie Brae St Elm St(US 77) Bronco Way/Riney Rd 11/13/23 12/28/23 Contractor will be installing a 16 Engineering Jesus Perez 2 inch water line off of the new 36 water line along US77. Bonnie Brae St S Walt Parker Dr Willowwood St 01/02/24 01/19/24 contractor installing duct bank Engineering Robin Davis 3 crossing(open cut)BB just south of Walt Parker 4 Brightwood Terrace Wilsonwood Dr Longfellow Ln 09/11/23 01/12/24 Utility Installation&Street Engineering Taylor Holt Reconstruction 5 Carroll Blvd Oak Mulberry 12/26/23 01/03/24 Restoration Atmos Sheldon Gatewood 6 Cherry Tree Ln Clear River Ln dead end south 11/27/23 01/12/24 Sidewalk Repair Streets Roy San Miguel 7 Clear River Ln Montecito Dr Country Home Dr 11/27/23 01/12/24 Sidewalk Repair Streets Roy San Miguel 8 Crenshaw Ln Alderbrook Dr Hayling Way Intersection 11/20/23 01/12/24 Street Panels and Sidewalk Streets Roy San Miguel Repair 9 Meadow Ln Sagewood St Shadow Trail 11/29/23 01/15/24 Street Reconstruction Engineering Taylor Holt 10 Mingo Rd Mockingbird Ln Sirius Dr 09/25/23 12/29/23 Base Failures Streets Jeff Jones 11 Parkside Dr Windsor Dr W Bowling Green St 10/16/23 12/31/23 Pavement replacement Engineering Scott Fettig 12 Smith St Johnson St Bell Ave 01/30/23 12/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 13 Smith St Dallas Dr(Hwy 77) Hill St 03/06/23 12/31/23 Utility installations and Engineering Scott Fettig pavement replacement. 14 Trinity Rd Mills Rd Cooper Rd 10/12/23 01/05/24 Installation of force main and Public Works Inspections Ryan Cuba demo of old system 15 Wind River Ln Como Lake Rd Shoreline Dr 12/11/23 01/19/24 Concrete Panel Repair Streets Roy San Miguel Exported on January 26,2024 11:33:45 AM CST Page 1 of 1