Loading...
2024/02/02 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Feb 5th - 11 th . . Department.. Exported on February 2,2024 11:21:04 AM CST 2 Street Closure Report: Current Closures smartsheet Street/Intersection ulosure a Description Department Ir Department Contact Date I 1 Azalea St Parvin St Laurel St 05/30/23 03/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 2 Bell Ave Sycamore St Prairie St 08/21/23 03/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 3 Bernard St Acme St Roselawn Dr 05/30/23 03/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 4 Bradshaw St Wilson St Prairie St 01/30/23 03/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 5 Bradshaw St Prairie St Sycamore St 03/13/23 03/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 6 Brookside Dr(5900) @ Trailside Dr At Intersection 02/05/24 03/01/24 ADA Sidewalk Repair Streets Roy San Miguel 7 Buena Vista Dr Montecito Rd Mira Vista Dr 11/06/23 03/29/24 Street reconstruct Streets Jeff Jones 8 Camellia St Parvin St Laurel St 05/30/23 03/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 9 Chaparral Ct Cooper Branch E Dead End 08/14/23 02/12/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 10 Chittamwood Ct Desert Willow Cul V Sac 01/02/24 02/16/24 Concrete Panel and Sidewalk Streets Roy San Miguel Repair 11 Churchill Dr Churchill Cir Windsor Dr 12/11/23 02/12/24 Utility installations and Engineering Taylor Halt pavement replacement 12 College Park Dr Peach St Dead End 10/02/23 03/29/24 Street reconstruct Streets Jeff Jones 13 College Park Dr Peach St Dead End 10/02/23 03/29/24 Reconstruct Streets Jeff Jones 14 Collins St Johnson St Dead End West 08/22/23 04/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 15 Crawford St Mulberry St Sycamore St 10/09/23 05/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 16 Crescent St Ector St Hillcrest St 12/27/23 05/03/24 Utility installations and Engineering Scott Fettig pavement replacement. 17 Fowler Dr College Park Dr Peach St 10/02/23 03/29/24 Street reconstruct Streets Jeff Jones 18 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper 19 Highland St Locust St Wainwright St 01/30/23 05/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 20 Hillcrest St Panhandle St Crescent St 12/27/23 05/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 21 Industrial St Bell St Mulberry St 07/05/23 02/09/24 Utility installation and roadway Engineering Seth Garcia work 22 Jamestown Ln Mistywood Ln Locksley Ln 01/22/24 03/25/24 Utility Replacement&Street Engineering Taylor Halt Reconstruction 23 Leslie St Willowwood St Dudley St 08/31/23 03/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 24 Maid Marion PI Jamestown Ln Locksley Ln 01/24/24 03/25/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 25 Maple St Elm St Carroll Blvd 09/15/23 03/31/24 Utility installations and Scott Fettig pavement replacement. 26 Maple St Carroll Blvd Elm St 07/05/23 05/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 27 Maple St Ave D Ave A 01/22/24 08/01/24 Pavement replacement. Engineering Scott Fettig 28 Matthew Ave Thistle Hill Intersection Andrew Ave 12/18/23 02/09/24 ADA Repair Streets Roy San Miguel 29 Mayhill Rd @ Spencer Rd 03/28/23 02/29/24 Water main tie-in and turn lane Public Works Inspections Ryan Cuba addition Mayhill Rd IH 35E Colorado Blvd 01/31/24 03/24/24 This closure will encompass the Engineering Tracy L.Beck,PE,PMP 30 reconstruction of the Colorado and Mayhill Intersection. 31 Meadow View Ct Fallmeadow St Dead End 01/18/24 02/16/24 Replace asphalt in cul-de-sac Streets Jeff Jones Exported on February 2,2024 11:21:31 AM CST Street/Intersection From To Description Department Department Contact 32 Mill Pond Rd Emerson Ln Old North Rd 09/11/23 02/26/24 Utility Installations&Pavement Engineering Taylor Holt Reconstruction Mingo Rd Nottingham Dr Pertain St 10/25/23 02/29/24 pouring approach and turn lane Public Works Inspections Ryan Cuba 33 flaggers will be present during normal work hours 34 Mulberry St Bell Ave Industrial St 08/21/23 03/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 35 Mulberry St Wood St Crawford St 10/09/23 05/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 36 Myrtle St Fort Worth Dr(HW377) Eagle Dr 06/05/23 03/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 37 Myrtle St Maple St Highland St 07/05/23 04/01/24 Utility installations and Scott Fettig pavement replacement. 38 Myrtle St Eagle Dr Maple St 07/05/23 04/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 39 Oak St Bonnie Brae St Thomas St 01/19/24 02/09/24 work associated with the DIME Public Works Inspections Lee Thurmond substation 40 Oakwood Dr McCormick St Dead End East 10/02/23 04/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 41 Peach St Bell St Locust St 10/02/23 03/29/24 Street reconstruct Streets Jeff Jones 42 Pickwick Ln Oxford Ln Windsor Dr 08/21/23 02/12/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 43 Pierce St Maple St Highland St 07/05/23 03/01/24 Utility installations and Scott Fettig pavement replacement. Prairie St Lakey St To Cemetary/Halfway down Prairie 08/17/23 02/09/24 Narrow lane closure from Lakey Public Works Inspections Stephany Trammell 44 up to Cemetery before Bradshaw to install new storm drain. Roselawn Dr Roselawn Cir Railroad Tracks 02/05/24 03/29/24 Paving,TxDot guardrail,Install Private Development Taylor Hardgrave 45 new box culvert.8x8,new road for Roselawn.Eagle Creek PH 3A-4 46 Seven Oaks Ln Swan Park Dr Harvest Moon Tri 01/29/24 03/08/24 Concrete Sidewalk Repair Streets Roy San Miguel 47 Spring Valley Dr Twilight Dr Morningside Dr 01/08/24 03/01/24 Concrete Curb and Gutter Streets Roy San Miguel Repair 48 Sycamore St Industrial St Wainwright St 04/24/23 03/01/24 Roadway&Utilities Engineering Scott Fettig 49 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 03/08/24 Paving improvements from Public Works Inspections Stephany Trammell Exposition to Railroad 50 Sycamore St Wood St Crawford St 10/09/23 04/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 51 Sycamore St Exposition St Crawford St 03/13/23 04/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 52 Underwood St North Texas Blvd Kendolph Dr 08/28/23 03/31/24 Pavement replacement. Engineering Scott Fettig 53 Wainwright St Highland St Prairie St 03/13/23 03/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 54 Wellington Dr Just North of Heather Ln Churchill Dr 12/11/23 02/12/24 Utility installations and Engineering Taylor Holt pavement replacement 55 Willowwood St Bernard St Jacqueline Dr 12/27/23 03/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 56 Wind River Ln Union Lake Blvd Como Lake Rd 01/29/24 02/16/24 Concrete Sidewalk Repair Streets Roy San Miguel 57 Wisteria St Parvin St Laurel St 05/30/23 03/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 58 Woodrow Ln McKinney St Morse Rd 10/12/23 02/29/24 remove and replace turn lane at Public Works Inspections Ryan Cuba duchess dr Exported on February 2,2024 11:21:31 AM CST 3 Street Closure Report: Completed Closures smartsheet Street/Intersection r1rom To Date Date Description Department Department Contact 1 Bolivar St Congress St Parkway St 01/25/24 01/29/24 Concrete restoration Public Works Inspections Alexander Cervantes Wastewater Bonnie Brae St S Walt Parker Dr Willowwood St 01/02/24 01/19/24 contractor installing duct bank Engineering Robin Davis 2 crossing(open cut)BB just south of Walt Parker 3 Brightwood Terrace Wilsonwood Dr Longfellow Ln 09/11/23 01/12/24 Utility Installation&Street Engineering Taylor Holt Reconstruction 4 Carroll Blvd Oak St Mulberry St 12/26/23 01/03/24 Restoration Atmos Sheldon Gatewood 5 Cherry Tree Ln Clear River Ln Dead End South 11/27/23 01/12/24 Sidewalk Repair Streets Roy San Miguel 6 Clear River Ln Montecito Dr Country Home Dr 11/27/23 01/12/24 Sidewalk Repair Streets Roy San Miguel 7 Crenshaw Ln Alderbrook Dr Hayling Way Intersection 11/20/23 01/12/24 Street Panels and Sidewalk Streets Roy San Miguel Repair 8 Meadow Ln Sagewood St Shadow Trail 11/29/23 01/15/24 Street Reconstruction Engineering Taylor Holt 9 Trinity Rd Mills Rd Cooper Rd 10/12/23 01/05/24 Installation of force main and Public Works Inspections Ryan Cuba demo of old system 10 Wind River Ln Como Lake Rd Shoreline Dr 12/11/23 01/19/24 Concrete Panel Repair Streets Roy San Miguel Exported on February 2,2024 11:21:40 AM CST