2024/03/08 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Mar 11 th - 17th
• From To •_ - • _ Description Department Department Contact
1 Edwards Rd Forrest Willow Rd Desert Willow or 03/18/24 04/26/24 Concrete Panel and Sidewalk Repair Streets Roy San Miguel
2 Osage Ln Huron Cir Cul V Sac 03/18/24 04/26/24 Concrete Panel and Sidewalk Repair Streets Roy San Miguel
Exported on March 8,2024 11:23:59 AM CST
2 Street Closure Report: Current Closures smartsheet
Street/Intersection r-rom NIIIIIIIIIIIIIIII To IMK-ure Start Description Department ff Department Contact
Date
1 Azalea St Parvin St Laurel St 05/30/23 03/30/24 i Utility installations and Engineering Scott Fettig
pavement replacement.
2 Bandera St 1-35 Frontage Rd Bandera St(WB—150') 02/08/24 03/30/24 Utility Relocation Engineering Cole Tankersley
3 Bell Ave Sycamore St Prairie St 08/21/23 03/31/24 Utility installations and Engineering Scott Fettig
pavement replacement.
4 Bernard St Acme St Roselawn Dr 05/30/23 04/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
5 Bonnie Brae St FM 1515/Airport Rd Willowwood St 03/11/24 03/15/24 Underground Utility Work in Engineering Robin Davis
close proximity to the roadway
6 Bradshaw St Wilson St Prairie St 01/30/23 04/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
7 Bradshaw St Prairie St Sycamore St 03/13/23 04/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
8 Brookside Dr(5900) @ Trailside Dr At Intersection 02/05/24 03/15/24 ADA Sidewalk Repair Streets Roy San Miguel
9 Buena Vista Dr Montecito Rd Mira Vista Dr 11/06/23 03/29/24 Street reconstruct Streets Jeff Jones
10 Camellia St Parvin St Laurel St 05/30/23 03/30/24 Utility installations and Engineering Scott Fettig
pavement replacement.
11 Chaparral Ct Cooper Branch E Dead End 08/14/23 03/18/24 Utility Replacement&Street Engineering Taylor Holt
Reconstruction
12 Churchill Dr Churchill Cir Windsor Dr 12/11/23 03/18/24 Utility installations and Engineering Taylor Holt
pavement replacement
13 College Park Dr Peach St Dead End 10/02/23 03/29/24 Street reconstruct Streets Jeff Jones
14 College Park Dr Peach St Dead End 10/02/23 03/29/24 Reconstruct Streets Jeff Jones
15 Collins St Johnson St Dead End West 08/22/23 04/30/24 Utility installations and Engineering Scott Fettig
pavement replacement.
16 Crawford St Mulberry St Sycamore St 10/09/23 05/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
17 Crescent St Ector St Hillcrest St 12/27/23 05/03/24 Utility installations and Engineering Scott Fettig
pavement replacement.
18 Fannin St Avenue A Avenue B 02/15/24 04/15/24 Atmos gas relocation Atmos Pulizzi,Joseph
19 Fowler Dr College Park Dr Peach St 10/02/23 03/29/24 Street reconstruct Streets Jeff Jones
20 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper
21 Highland St Locust St Wainwright St 01/30/23 05/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
22 Hillcrest St Panhandle St Crescent St 12/27/23 05/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
23 Jamestown Ln Mistywood Ln Locksley Ln 01/22/24 03/25/24 Utility Replacement&Street Engineering Taylor Holt
Reconstruction
24 Leslie St Willowwood St Dudley St 08/31/23 03/31/24 Utility installations and Engineering Scott Fettig
pavement replacement.
25 Los Colinas St Mesa Drive 1-35 Frontage Rd. 03/01/24 03/22/24 Utility Water/Wastewater line Water Wastewater Other Cole Tankersley
relocation
26 Maid Marion PI Jamestown Ln Locksley Ln 01/24/24 03/25/24 Utility Replacement&Street Engineering Taylor Holt
Reconstruction
27 Maple St Elm St Carroll Blvd 09/15/23 03/31/24 Utility installations and Scott Fettig
pavement replacement.
28 Maple St Carroll Blvd Elm St 07/05/23 05/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
29 Maple St Ave D Ave A 01/22/24 08/01/24 Pavement replacement. Engineering Scott Fettig
30 Masch Branch Rd US 380 Hampton Rd 02/26/24 04/16/24 Reconstruction of Center lane, Private Development Public Ethan Keith
adding turn lane. Works Inspections
Mayhill Rd IH 35E Colorado Blvd 01/31/24 03/24/24 This closure will encompass the Engineering Tracy L.Beck,PE,PMP
31 reconstruction of the Colorado
and Mayhill Intersection.
Exported on March 8,2024 11:24:12 AM CST
Street/Intersection From To --scription Department Department Contact
32 Mayhill Rd University Dr(Hwy 380) Prominence Parkway 02/26/24 03/29/24 Installation of new water main Private Development Zabdiel Mota
line pipe.
33 Mayhill Rd @ Spencer Rd 03/28/23 03/29/24 Water main tie-in and turn lane Public Works Inspections Ryan Cuba
addition
34 Mill Pond Rd Emerson Ln Old North Rd 09/11/23 03/18/24 Utility Installations&Pavement Engineering Taylor Holt
Reconstruction
35 Mulberry St Wood St Crawford St 10/09/23 05/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
36 Mulberry St Locust St Elm St 02/19/24 05/31/24 Utility installations and Engineering Scott Fettig
pavement replacement.
37 Mulberry St Bell Ave Industrial St 08/21/23 06/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
38 Myrtle St Fort Worth Dr(HW377) Eagle Dr 06/05/23 04/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
39 Myrtle St Maple St Highland St 07/05/23 04/01/24 Utility installations and Scott Fettig
pavement replacement.
40 Myrtle St Eagle Dr Maple St 07/05/23 04/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
41 Oak St 1-35 Frontage Rd Oak St(EB-300') 02/08/24 03/22/24 Utility Relocation Engineering Cole Tankersley
42 Oakwood Dr McCormick St Dead End East 10/02/23 04/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
43 Peach St Bell St Locust St 10/02/23 03/29/24 Street reconstruct Streets Jeff Jones
44 Pickwick Ln Oxford Ln Windsor Dr 08/21/23 03/18/24 Utility Replacement&Street Engineering Taylor Holt
Reconstruction
45 Pierce St Maple St Highland St 07/05/23 04/01/24 Utility installations and Scott Fettig
pavement replacement.
46 Prairie St Bell Ave Skinner St 03/04/24 03/15/24 stormwater replacement Drainage Stephen Bonner
Roselawn Dr Roselawn Cir Railroad Tracks 02/05/24 03/29/24 Paving,TxDot guardrail,Install Private Development Taylor Hardgrave
47 new box culvert.8x8,new road
for Roselawn.Eagle Creek PH
3A-4
48 Spring Valley Dr Twilight Dr Morningside Dr 01/08/24 03/15/24 Concrete Curb and Gutter Streets Roy San Miguel
Repair
49 Spyglass Hill Ln Cliffside Dr Oceanview Dr 03/04/24 04/12/24 Concrete Panel and Sidewalk Streets Roy San Miguel
Repair
50 Sycamore St Wood St Crawford St 10/09/23 04/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
51 Sycamore St Exposition St Crawford St 03/13/23 04/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
52 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 04/19/24 Paving improvements from Public Works Inspections Stephany Trammell
Exposition to Railroad
53 Underwood St North Texas Blvd Kendolph Dr 08/28/23 03/31/24 Pavement replacement. Engineering Scott Fettig
54 University Dr 1-35 Frontage Rd University Dr(EB-550') 02/19/24 03/15/24 Utility Relocation Engineering Cole Tankersley
55 Wellington Dr Just North of Heather Ln Churchill Dr 12/11/23 03/18/24 Utility installations and Engineering Taylor Holt
pavement replacement
56 Willowwood St Bernard St Jacqueline Dr 12/27/23 04/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
57 Wind River Ln Union Lake Blvd Como Lake Rd 01/29/24 03/15/24 Concrete Sidewalk Repair Streets Roy San Miguel
58 Wisteria St Parvin St Laurel St 05/30/23 03/31/24 Utility installations and Engineering Scott Fettig
pavement replacement.
Exported on March 8,2024 11:24:12 AM CST
3 Street Closure Report: Completed Closures smartsheet
I Closure Start Closure End Description Departme Department Contact
Street/Intersection Date Date nt
1 Bonnie Brae St Airport Rd Willowwood St 02/26/24 03/03/24 Installation of duct bank, Engineering Robin Davis
crossing Bonnie Brae
2 Chittamwood Ct Desert Willow Cul V Sac 01/02/24 02/23/24 Concrete Panel and Sidewalk Streets Roy San Miguel
Repair
3 Grissom Rd McKinney St city limits east 02/12/24 02/29/24 Street repair-Base failures Streets Jeff Jones
4 Industrial St Bell St Mulberry St 07/05/23 02/09/24 Utility installation and roadway Engineering Seth Garcia
work
5 Matthew Ave Thistle Hill Intersection Andrew Ave 12/18/23 02/09/24 ADA Repair Streets Roy San Miguel
6 Meadow View Ct Fallmeadow St Dead End 01/18/24 02/08/24 Replace asphalt in cul-de-sac Streets Jeff Jones
Mingo Rd Nottingham Dr Pertain St 10/25/23 02/29/24 pouring approach and turn lane Public Works Inspections Ryan Cuba
7 flaggers will be present during
normal work hours
8 Oak St Bonnie Brae St Thomas St 01/19/24 02/21/24 work associated with the DME Public Works Inspections Lee Thurmond
substation
Prairie St Lakey St To Cemetary/Halfway down 08/17/23 02/23/24 Narrow lane closure from Lakey Public Works Inspections Stephany Trammell
a Prairie up to Cemetary before
Bradshaw to install new storm
drain.
10 Scripture St Scripture St Panhandle St 02/06/24 02/23/24 Utility Relocations Engineering Cole Tankersley
11 Seven Oaks Ln Swan Park Dr Harvest Moon Trl 01/29/24 03/08/24 Concrete Sidewalk Repair Streets Roy San Miguel
12 Sycamore St Industrial St Wainwright St 04/24/23 02/27/24 Roadway&Utilities Engineering Scott Fettig
13 Wainwright St Highland St Prairie St 03/13/23 03/01/24 Utility installations and Engineering Scott Fettig
pavement replacement.
14 Woodrow Ln McKinney St Morse Rd 10/12/23 02/29/24 remove and replace turn lane at Public Works Inspections Ryan Cuba
duchess dr
Exported on March 8,2024 11:24:22 AM CST