Loading...
2024/03/29 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR April 1 st- April 7th From To Description Department Department Contact 1r Montclair PI McKinney St(East) 04/22/24 05/03/24 Valley Gutter Repair Streets Roy San Miguel 2 Fallmeadow Ln Joyce Ln 04/08/24 04/19/24 Valley Gutter Repair Streets Roy San Miguel 3 University or(US 380) Prominence Pkwy 04/15/24 05/31/24 Installation of new driveway approaches Private Development Public Zabdiel Mote Works Inspections 4 Mira Vista Dr. Buena Vista Dr. Palo Verde Dr. 04/08/24 05/03/24 Reconstruction Streets Rogelio San Miguel 5 Nora Ln Central Village or Mark Ln 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel 6 Nottingham or Kings Row Stratford Ln 04/15/24 04/26/24 Valley Gutter Repair Streets Roy San Miguel 7 Pecan Tree or Nora Ln dead end north 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel 8 Regency Ct Mark Ln Country Club Rd 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel Exported on March 29,2024 11:58:36 AM CDT Page 1 of 1 2 Street Closure Report: Current Closures smartsheet Street/Intersection r-rom NIIIIIIIIIIIIIIII To IMK-ure Start Description Department ff Department Contact Date 1 Azalea St Parvin St Laurel St 05/30/23 04/30/24 i Utility installations and Engineering Scott Fettig pavement replacement. 2 Bandera St 1-35 Frontage Rd Bandera St(WB—150') 02/08/24 04/19/24 Utility Relocation Engineering Shawn Messick 3 Bell Ave Sycamore St Prairie St 08/21/23 05/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 4 Bernard St Acme St Roselawn Dr 05/30/23 05/15/24 Utility installations and Engineering Scott Fettig pavement replacement. 5 Bradshaw St Wilson St Prairie St 01/30/23 06/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 6 Bradshaw St Prairie St Sycamore St 03/13/23 06/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 7 Camellia St Parvin St Laurel St 05/30/23 04/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 8 Carmel Hills Dr(3405) Las Lomas Ln Portola Ln 04/03/24 05/01/24 Concrete Panel Repair Streets Roy San Miguel 9 Churchill Dr Churchill Cir Windsor Dr 12/11/23 04/17/24 Utility installations and Engineering Taylor Holt pavement replacement 10 College Park Dr Peach St Dead End 10/02/23 05/17/24 Street reconstruct Streets Roy San Miguel 11 Collins St Johnson St Dead End West 08/22/23 04/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 12 Crawford St Mulberry St Sycamore St 10/09/23 05/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 13 Crescent St Ector St Hillcrest St 12/27/23 05/03/24 Utility installations and Engineering Scott Fettig pavement replacement. 14 Eastpark Blvd Panhandle St Linden Dr 03/22/24 04/05/24 roadway panel replacement for Public Works Inspections Lee Thurmond pcm21-0040 15 Edwards Rd Forrest Willow Rd Desert Willow Dr 03/18/24 04/26/24 Concrete Panel and Sidewalk Streets Roy San Miguel Repair 16 Fannin St Avenue A Avenue B 02/15/24 04/15/24 Atmos gas relocation Atmos Pulizzi,Joseph 17 Fowler Dr College Park Dr Peach St 10/02/23 05/17/24 Street reconstruct Streets Roy San Miguel 18 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper 19 Highland St Locust St Wainwright St 01/30/23 05/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 20 Hillcrest St Panhandle St Crescent St 12/27/23 05/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 21 Jamestown Ln Mistywood Ln Locksley Ln 01/22/24 04/17/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 22 Leslie St Willowwood St Dudley St 08/31/23 04/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 23 Los Colinas St Mesa Drive 1-35 Frontage Rd 03/01/24 04/05/24 Utility Water/Wastewater line Water Wastewater Other Shawn Messick relocation 24 Maid Marion PI Jamestown Ln Locksley Ln 01/24/24 04/17/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 25 Maple St Carroll Blvd Elm St 07/05/23 05/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 26 Maple St Elm St Carroll Blvd 09/15/23 06/30/24 Utility installations and Scott Fettig pavement replacement. 27 Maple St Ave D Ave A 01/22/24 08/01/24 Pavement replacement. Engineering Scott Fettig 28 Masch Branch Rd US 380 Hampton Rd 02/26/24 04/16/24 Reconstruction of Center lane, Private Development Public Ethan Keith adding turn lane. Works Inspections 29 Mayhill Rd University Dr(Hwy 380) Prominence Pkwy 02/26/24 04/12/24 Installation of new water main Private Development Zabdiel Mote line pipe. Mayhill Rd IH 35E Colorado Blvd 01/31/24 04/30/24 This closure will encompass the Engineering Tracy L.Beck,PE,PIMP 30 reconstruction of the Colorado and Mayhill Intersection. Exported on March 29,2024 11:58:20 AM CDT Page 1 of 2 Street/Intersection From To Description Department Department Contact 31 Mill Pond Rd Emerson Ln Old North Rd 09/11/23 04/17/24 Utility Installations&Pavement Engineering Taylor Holt Reconstruction 32 Mulberry St Wood St Crawford St 10/09/23 05/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 33 Mulberry St Locust St Elm St 02/19/24 05/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 34 Mulberry St Bell Ave Industrial St 08/21/23 06/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 35 Myrtle St Fort Worth Dr(HW377) Eagle Dr 06/05/23 06/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 36 Myrtle St Maple St Highland St 07/05/23 06/30/24 Utility installations and Scott Fettig pavement replacement. 37 Myrtle St Eagle Dr Maple St 07/05/23 06/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 38 Oak St 1-35 Frontage Rd Oak St(EB-300') 02/08/24 04/05/24 Utility Relocation Engineering Shawn Messick 39 Oakwood Dr McCormick St Dead End East 10/02/23 05/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 40 Old Orchard Ln Windsor Dr Dead End 03/13/24 04/24/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 41 Osage Ln Huron Cir Cut V Sac 03/18/24 04/26/24 Concrete Panel and Sidewalk Streets Roy San Miguel Repair 42 Peach St Bell St Locust St 10/02/23 05/17/24 Street reconstruct Streets Roy San Miguel 43 Pickwick Ln Oxford Ln Windsor Dr 08/21/23 04/17/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 44 Pierce St Maple St Highland St 07/05/23 06/30/24 Utility installations and Scott Fettig pavement replacement. 45 Randall St Sherman Dr Picadilly La 03/22/24 04/05/24 infrastructure installation on Public Works Inspections Lee Thurmond Randall street for pcm22=0063 Roselawn Dr Roselawn Cir railroad crossing 02/05/24 04/05/24 Paving,TxDot guardrail,Install Private Development Taylor Hardgrave 46 new box culvert.8x8,new road for Roselawn.Eagle Creek PH 3A-4 47 Spyglass Hill Ln Cliffside Dr Oceanview Dr 03/04/24 04/12/24 Concrete Panel and Sidewalk Streets Roy San Miguel Repair 48 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 04/19/24 Paving improvements from Public Works Inspections Stephany Trammell Exposition to Railroad 49 Sycamore St Exposition St Crawford St 03/13/23 05/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 50 Sycamore St Wood St Crawford St 10/09/23 05/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 51 Underwood St North Texas Blvd Kendolph Dr 08/28/23 04/30/24 Pavement replacement. Engineering Scott Fettig 52 University Dr 1-35 Frontage Rd University Dr(EB-550') 02/19/24 04/11/24 Utility Relocation Engineering Shawn Messick 53 Wellington Dr Just North of Heather Ln Churchill Dr 12/11/23 04/17/24 Utility installations and Engineering Taylor Holt pavement replacement 54 Willowwood St Bonnie Brae St Bonnie Brae St 04/02/24 04/05/24 Installation of Sanitary Sewer Engineering Robin Davis line 55 Willowwood St Bernard St Jacqueline Dr 12/27/23 04/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 56 Wisteria St Parvin St Laurel St 05/30/23 04/30/24 Utility installations and Engineering Scott Fettig pavement replacement. Exported on March 29,2024 11:58:20 AM CDT Page 2 of 2 3 Street Closure Report: Completed Closures smartsheet ;.r I Closure Start Closure End Street/Intersection .110 Date Date Description Department Department Contact 1 Bonnie Brae St Airport Rd Willowwood St 02/26/24 03/03/24 Installation of duct bank, Engineering Robin Davis crossing Bonnie Brae 2 Bonnie Brae St FM 1515/Airport Rd Willowwood St 03/11/24 03/15/24 Underground Utility Work in Engineering Robin Davis close proximity to the roadway 3 Brookside Dr(5900) @ Trailside Dr At Intersection 02/05/24 03/15/24 ADA Sidewalk Repair Streets Roy San Miguel 4 Buena Vista Dr Montecito Rd Mira Vista Dr 11/06/23 03/29/24 Street reconstruct Streets Jeff Jones 5 Chaparral Ct Cooper Branch E Dead End 08/14/23 03/27/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 6 Grissom Rd McKinney St city limits east 02/12/24 02/29/24 Street repair-Base failures Streets Jeff Jones 7 Mayhill Rd @ Spencer Rd 03/28/23 03/29/24 Water main tie-in and turn lane Public Works Inspections Ryan Cuba addition Mingo Rd Nottingham Dr Pertain St 10/25/23 02/29/24 pouring approach and turn lane Public Works Inspections Ryan Cuba 8 flaggers will be present during normal work hours 9 Prairie St Bell Ave Skinner St 03/04/24 03/29/24 stormwater replacement Drainage Stephen Bonner 10 Seven Oaks Ln Swan Park Dr Harvest Moon Trl 01/29/24 03/08/24 Concrete Sidewalk Repair Streets Roy San Miguel South Bonnie Brae Street LINT Main Stadium Drive Walt Parker Drive 03/11/24 03/15/24 Underground Utility Work in Engineering Robin Davis close proximity to the roadway 11 (lane will be closed during construction for safety of workers&travelers) 12 Spring Valley Dr Twilight Dr Morningside Dr 01/08/24 03/15/24 Concrete Curb and Gutter Streets Roy San Miguel Repair 13 Wainwright St Highland St Prairie St 03/13/23 03/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 14 Wind River Ln Union Lake Blvd Como Lake Rd 01/29/24 03/15/24 Concrete Sidewalk Repair Streets Roy San Miguel 15 Woodrow Ln McKinney St Morse Rd 10/12/23 02/29/24 remove and replace turn lane at Public Works Inspections Ryan Cuba duchess dr Exported on March 29,2024 11:58:04 AM CDT Page 1 of 1