Loading...
2024/04/05 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Apr 8th - 14th From To Description Department Department Contact 17Thunderbird Montclair PI McKinney St(East) 04/22/24 05/03/24 Valley Gutter Repair Streets Roy San Miguel 2 University or(US 380) Prominence Pkwy 04/15/24 05/31/24 Installation of new driveway approaches Private Development Public Zabdiel Mote Works Inspections 3 Kings Row Stratford I 04/15/24 04/26/24 Valley Gutter Repair Streets Roy San Miguel 4 Crestmeadow St Westview TO 04/29/24 05/24/24 Curb and Gutter and Sidewalk Repair Streets Roy San Miguel Exported on April 5,2024 11:44:05 AM CDT 2 Street Closure Report: Current Closures smartsheet Street/Intersection r-rom NIIIIIIIIIIIIIIII To IMK-ure Start Description Department ff Department Contact Date 1 Azalea St Parvin St Laurel St 05/30/23 04/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 2 Bandera St 1-35 Frontage Rd Bandera St(WB—150') 02/08/24 04/19/24 Utility Relocation Engineering Shawn Messick 3 Barcelona St N 1-35 Service Rd Mesa Dr 04/08/24 04/15/24 Atmos gas relocation Atmos Gavin Petner 4 Bell Ave Sycamore St Prairie St 08/21/23 05/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 5 Bernard St Acme St Roselawn Dr 05/30/23 05/15/24 Utility installations and Engineering Scott Fettig pavement replacement. 6 Bradshaw St Wilson St Prairie St 01/30/23 06/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 7 Bradshaw St Prairie St Sycamore St 03/13/23 06/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 8 Camellia St Parvin St Laurel St 05/30/23 04/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 9 Carmel Hills Dr(3405) Las Lomas Ln Portola Ln 04/03/24 05/01/24 Concrete Panel Repair Streets Roy San Miguel 10 Churchill Dr Churchill Cir Windsor Dr 12/11/23 04/17/24 Utility installations and Engineering Taylor Holt pavement replacement 11 College Park Dr Peach St Dead End 10/02/23 05/17/24 Street reconstruct Streets Roy San Miguel 12 Collins St Johnson St Dead End West 08/22/23 04/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 13 Crawford St Mulberry St Sycamore St 10/09/23 05/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 14 Crescent St Ector St Hillcrest St 12/27/23 05/03/24 Utility installations and Engineering Scott Fettig pavement replacement. 15 Edwards Rd Forrest Willow Rd Desert Willow Dr 03/18/24 04/26/24 Concrete Panel and Sidewalk Streets Roy San Miguel Repair 16 Fannin St Avenue A Avenue B 02/15/24 04/15/24 Atmos gas relocation Atmos Pulizzi,Joseph 17 Fowler Dr College Park Dr Peach St 10/02/23 05/17/24 Street reconstruct Streets Roy San Miguel 18 Gardenview St Fallmeadow Ln Joyce Ln 04/08/24 04/19/24 Valley Gutter Repair Streets Roy San Miguel 19 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper 20 Highland St Locust St Wainwright St 01/30/23 05/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 21 Hillcrest St Panhandle St Crescent St 12/27/23 05/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 22 Jamestown Ln Mistywood Ln Locksley Ln 01/22/24 04/17/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 23 Leslie St Willowwood St Dudley St 08/31/23 04/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 24 Los Colinas St Mesa Drive 1-35 Frontage Rd 03/01/24 04/16/24 Utility Water/Wastewater line Water Wastewater Other Shawn Messick relocation 25 Maid Marion PI Jamestown Ln Locksley Ln 01/24/24 04/17/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 26 Maple St Carroll Blvd Elm St 07/05/23 05/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 27 Maple St Elm St Carroll Blvd 09/15/23 06/30/24 Utility installations and Scott Fettig pavement replacement. 28 Maple St Ave D Ave A 01/22/24 08/01/24 Pavement replacement. Engineering Scott Fettig 29 Masch Branch Rd US 380 Hampton Rd 02/26/24 04/22/24 Reconstruction of Center lane, Private Development Public Ethan Keith adding turn lane. Works Inspections 30 Mayhill Rd University Dr(Hwy 380) Prominence Pkwy 02/26/24 04/12/24 Installation of new water main Private Development Zabdiel Mote line pipe. Mayhill Rd IH 35E Colorado Blvd 01/31/24 04/30/24 This closure will encompass the Engineering Tracy L.Beck,PE,PIMP 31 reconstruction of the Colorado and Mayhill Intersection. Exported on April 5,2024 11:44:19 AM CDT Street/Intersection From To Description Department Department Contact 32 Mill Pond Rd Emerson Ln Old North Rd 09/11/23 04/17/24 Utility Installations&Pavement Engineering Taylor Holt Reconstruction 33 Mira Vista Dr Buena Vista Dr Palo Verde Dr 04/08/24 05/03/24 Reconstruction Streets Rogelio San Miguel 34 Mulberry St Wood St Crawford St 10/09/23 05/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 35 Mulberry St Locust St Elm St 02/19/24 05/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 36 Mulberry St Bell Ave Industrial St 08/21/23 06/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 37 Myrtle St Fort Worth Dr(HW377) Eagle Dr 06/05/23 06/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 38 Myrtle St Maple St Highland St 07/05/23 06/30/24 Utility installations and Scott Fettig pavement replacement. 39 Myrtle St Eagle Dr Maple St 07/05/23 06/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 40 Nora Ln Central Village Dr Mark Ln 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel 41 Oak St 1-35 Frontage Rd Oak St(EB-300') 02/08/24 04/17/24 Utility Relocation Engineering Shawn Messick 42 Oakwood Dr McCormick St Dead End East 10/02/23 05/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 43 Old Orchard Ln Windsor Dr Dead End 03/13/24 04/24/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 44 Osage Ln Huron Cir Cut V Sac 03/18/24 04/26/24 Concrete Panel and Sidewalk Streets Roy San Miguel Repair 45 Peach St Bell St Locust St 10/02/23 05/17/24 Street reconstruct Streets Roy San Miguel 46 Pecan Tree Dr Nora Ln dead end north 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel 47 Pickwick Ln Oxford Ln Windsor Dr 08/21/23 04/17/24 Utility Replacement&Street Engineering Taylor Halt Reconstruction 48 Pierce St Maple St Highland St 07/05/23 06/30/24 Utility installations and Scott Fettig pavement replacement. 49 Poinsettia Blvd Sherman Dr Picadilly Ln 04/08/24 05/03/24 Infrastructure installation on Public Works Inspections Lee Thurmond Poinsettia 50 Prairie St Locust St Bradshaw St 04/01/24 07/31/24 Utility installations and Scott Fettig pavement replacement. 51 Regency Ct Mark Ln Country Club Rd 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel 52 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 04/19/24 Paving improvements from Public Works Inspections Stephany Trammell Exposition to Railroad 53 Sycamore St Exposition St Crawford St 03/13/23 05/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 54 Sycamore St Wood St Crawford St 10/09/23 05/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 55 Underwood St North Texas Blvd Kendolph Dr 08/28/23 04/30/24 Pavement replacement. Engineering Scott Fettig 56 University Dr 1-35 Frontage Rd University Dr(EB-550') 02/19/24 04/11/24 Utility Relocation Engineering Shawn Messick 57 Wellington Dr Just North of Heather Ln Churchill Dr 12/11/23 04/17/24 Utility installations and Engineering Taylor Holt pavement replacement 58 Willowwood St Bonnie Brae St Bonnie Brae St 04/08/24 04/11/24 Installation of Sanitary Sewer Engineering Robin Davis line 59 Willowwood St Bernard St Jacqueline Dr 12/27/23 04/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 60 Wisteria St Parvin St Laurel St 05/30/23 04/30/24 Utility installations and Engineering Scott Fettig pavement replacement. Exported on April 5,2024 11:44:19 AM CDT 3 Street Closure Report: Completed Closures smartsheet Street/Intersection .110 1W Date Date Description Department Department Contact 1 Bonnie Brae St FM 1515/Airport Rd Willowwood St 03/11/24 03/15/24 Underground Utility Work in Engineering Robin Davis close proximity to the roadway Bonnie Brae St LINT Main Stadium Dr Walt Parker Dr 03/11/24 03/15/24 Underground Utility Work in Engineering Robin Davis close proximity to the roadway 2 (lane will be closed during construction for safety of workers&travelers) 3 Brookside Dr(5900) @ Trailside Dr At Intersection 02/05/24 03/15/24 ADA Sidewalk Repair Streets Roy San Miguel 4 Buena Vista Dr Montecito Rd Mira Vista Dr 11/06/23 03/29/24 Street reconstruct Streets Jeff Jones 5 Chaparral Ct Cooper Branch E Dead End 08/14/23 03/27/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 6 Eastpark Blvd Panhandle St Linden Dr 03/22/24 04/05/24 roadway panel replacement for Public Works Inspections Lee Thurmond pcm21-0040 7 Mayhill Rd @ Spencer Rd 03/28/23 03/29/24 Water main tie-in and turn lane Public Works Inspections Ryan Cuba addition 8 Prairie St Bell Ave Skinner St 03/04/24 03/29/24 stormwater replacement Drainage Stephen Bonner 9 Randall St Sherman Dr Picadilly La 03/22/24 04/05/24 infrastructure installation on Public Works Inspections Lee Thurmond Randall street for pcm22=0063 Roselawn Dr Roselawn Cir railroad crossing 02/05/24 04/05/24 Paving,TxDot guardrail,Install Private Development Taylor Hardgrave 10 new box culvert.8x8,new road for Roselawn.Eagle Creek PH 3A-4 11 Seven Oaks Ln Swan Park Dr Harvest Moon Trl 01/29/24 03/08/24 Concrete Sidewalk Repair Streets Roy San Miguel 12 Spring Valley Dr Twilight Dr orningside Dr 01/08/24 03/15/24 Concrete Curb and Gutter Streets Roy San Miguel Repair 13 Spyglass Hill Ln Cliffside Dr Oceanview Dr 03/04/24 04/05/24 Concrete Panel and Sidewalk Streets Roy San Miguel Repair 14 Wind River Ln Union Lake Blvd Como Lake Rd 01/29/24 03/15/24 Concrete Sidewalk Repair Streets Roy San Miguel Exported on April 5,2024 11:44:29 AM CDT