Loading...
2024/04/26 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Apr 29th - May 5th Street/Intersection From To Description Department Department Contact 17 Beall St(1400) Nicosia St Hermalmda or 05/06/24 06/07/24 Curb and Gutter Repair Streets I Roy San Miguel 2 Spencer Rd Loop 288 Mayhill Rd 05/06/24 06/12/24 adding 300 feet of spencer road Public Works Inspections Ryan Cuba 3 Wind River Ln @ Shoreline Como Lake or Enchanted Lake Dr 05/06/24 06/07/24 Concrete Panel Repair Streets Roy San Miguel Exported on April 26,2024 12:44:02 PM CDT 2 Street Closure Report: Current Closures smartsheet Uos Description Department Department Contact Street/Intersection From Date 1 Allred Rd Oakleaf Trl John Paine Rd 04/26/24 08/30/24 New road for Allred for Public Works Inspections Kent Bull Rivers Sagebrook PH II 2 Austin St Oak St Mulberry St 04/29/24 05/01/24 Geotechnical Pavement Boring Engineering Taylor Holt 3 Azalea St Parvin St Laurel St 05/30/23 06/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 4 Bandera St 1-35 Service Rd Bandera St(WB—150') 02/08/24 05/02/24 Utility Relocation Engineering Shawn Messick 5 Barcelona St 1-35 Service Rd Mesa Dr 04/25/24 05/01/24 Atmos gas relocation Atmos Gavin Petner 6 Bell Ave Sycamore St Prairie St 08/21/23 05/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 7 Bellaire Dr Montclair PI McKinney St(East) 04/22/24 05/03/24 Valley Gutter Repair Streets Roy San Miguel 8 Bernard St Acme St Roselawn Dr 05/30/23 05/15/24 Utility installations and Engineering Scott Fettig pavement replacement. 9 Bradshaw St Wilson St Prairie St 01/30/23 06/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 10 Bradshaw St Prairie St Sycamore St 03/13/23 06/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 11 Camellia St Parvin St Laurel St 05/30/23 06/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 12 Carmel Hills Dr(3405) Las Lomas Ln Portola Ln 04/03/24 05/01/24 Concrete Panel Repair Streets Roy San Miguel 13 Churchill Dr Churchill Cir Windsor Dr 12/11/23 05/08/24 Utility installations and Engineering Taylor Holt pavement replacement 14 College Park Dr Peach St Dead End 10/02/23 05/17/24 Street reconstruct Streets Roy San Miguel 15 Collins St Johnson St Dead End West 08/22/23 05/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 16 Crawford St Mulberry St Sycamore St 10/09/23 06/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 17 Crescent St Ector St Hillcrest St 12/27/23 05/03/24 Utility installations and Engineering Scott Fettig pavement replacement. 18 Edwards Rd Forrest Willow Rd Desert Willow Dr 03/18/24 05/24/24 Concrete Panel and Sidewalk Streets Roy San Miguel Repair 19 Elm St University Dr(US 380) Pecan St 04/29/24 05/01/24 Geotechnical Pavement Boring Engineering Taylor Holt Elm St University Dr(US 380) McKinney St 04/29/24 05/01/24 Engineering contractor CMJ Engineering Ammon Lutz 20 Engineering is coring for upcoming project 21 Fowler Dr College Park Dr Peach St 10/02/23 05/17/24 Street reconstruct Streets Roy San Miguel 22 Gardenview St Fallmeadow Ln Joyce Ln 04/08/24 05/03/24 Valley Gutter Repair Streets Roy San Miguel 23 Hickory Creek Rd Riverpass Dr FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper 24 Highland St Locust St Wainwright St 01/30/23 06/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 25 Hillcrest St Panhandle St Crescent St 12/27/23 06/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 26 Jamestown Ln Mistywood Ln Locksley Ln 01/22/24 05/08/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 27 Leslie St Willowwood St Dudley St 08/31/23 04/30/24 Utility installations and Engineering Scott Fettig pavement replacement. Locust St University Dr(US 380) McKinney St 04/29/24 05/01/24 Engineering contractor CMJ Engineering Ammon Lutz 28 Engineering is coring for upcoming project 29 Locust St University Dr(US 380) Pecan St 04/29/24 05/01/24 Geotechnical Pavement Boring Engineering Taylor Holt 30 Los Colinas St Mesa Drive 1-35 Frontage Rd 03/01/24 04/30/24 Utility Water/Wastewater line Water Wastewater Other Shawn Messick relocation 31 Maid Marion PI Jamestown Ln Locksley Ln 01/24/24 05/08/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 32 Maple St I Locust St Elm St 04/19/24 05/10/24 Pavement replacement. Engineering Scott Fettig Exported on April 26,2024 12:44:12 PM CDT Street/Intersection From To Description Department Departme 33 Maple St Elm St Carroll Blvd 09/15/23 06/30/24 Utility installations and Scott Fettig pavement replacement. 34 Maple St Carroll Blvd Elm St 07/05/23 07/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 35 Maple St Ave D Ave A 01/22/24 08/01/24 Pavement replacement. Engineering Scott Fettig 36 Masch Branch Rd University Dr(US 380) Hampton Rd 02/26/24 05/06/24 Reconstruction of Center lane, Private Development Public Ethan Keith adding turn lane. Works Inspections Mayhill Rd IH 35E Colorado Blvd 01/31/24 05/31/24 This closure will encompass the Engineering Tracy L.Beck,PE,PMP 37 reconstruction of the Colorado and Mayhill Intersection. Mayhill Rd(NB) University Dr(US 380) Prominence Pkwy 04/22/24 05/17/24 Tying new water line into Private Development Zabdiel Mota 38 existing water line on N.Mayhill Road for 380/Mayhill Industrial. 39 Mayhill Rd(SB) University Dr(US 380) Prominence Pkwy 04/15/24 05/31/24 Installation of new driveway Private Development Public Zabdiel Mota approaches Works Inspections 40 Mill Pond Rd Emerson Ln Old North Rd 09/11/23 05/08/24 Utility Installations&Pavement Engineering Taylor Halt Reconstruction 41 Mira Vista Dr Buena Vista Dr Palo Verde Dr 04/08/24 05/03/24 Reconstruction Streets Rogelio San Miguel 42 Mulberry St Locust St Elm St 02/19/24 05/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 43 Mulberry St Bell Ave Industrial St 08/21/23 06/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 44 Mulberry St Wood St Crawford St 10/09/23 07/01/24 Utility installations and Engineering Scott Fettig pavement replacement. 45 Myrtle St Fort Worth Dr(HW377) Eagle Dr 06/05/23 06/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 46 Myrtle St Maple St Highland St 07/05/23 06/30/24 Utility installations and Scott Fettig pavement replacement. 47 Myrtle St Eagle Dr Maple St 07/05/23 06/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 48 Nora Ln Central Village Dr Mark Ln 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel 49 North Texas Blvd Eagle Dr Highland St 04/29/24 05/17/24 Sidewalk Repair Streets Roy San Miguel 50 Oakwood Dr McCormick St Dead End East 10/02/23 05/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 51 Old Orchard Ln Windsor Dr Dead End 03/13/24 05/08/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 52 Peach St Bell St Locust St 10/02/23 05/17/24 Street reconstruct Streets Roy San Miguel 53 Pecan Tree Dr Nora Ln Dead End North 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel 54 Pickwick Ln Oxford Ln Windsor Dr 08/21/23 05/08/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 55 Pierce St Maple St Highland St 07/05/23 06/30/24 Utility installations and Scott Fettig pavement replacement. 56 Poinsettia Blvd Sherman Dr Picadilly Ln 04/08/24 05/03/24 Infrastructure installation on Public Works Inspections Lee Thurmond Poinsettia 57 Prairie St Locust St Bradshaw St 04/01/24 07/31/24 Utility installations and Scott Fettig pavement replacement. 58 Regency Ct Mark Ln Country Club Rd 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel 59 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 05/31/24 Paving improvements from Public Works Inspections Stephany Trammell Exposition to Railroad 60 Sycamore St Exposition St Crawford St 03/13/23 05/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 61 Sycamore St Wood St Crawford St 10/09/23 05/31/24 Utility installations and Engineering Scott Fettig pavement replacement. 62 Thunderbird Dr Crestmeadow St Westview Trl 04/29/24 05/24/24 Curb and Gutter and Sidewalk Streets Roy San Miguel Repair 63 rUnderwood St North Texas Blvd Kendolph Dr 08/28/23 04/30/24 Pavement replacement. Engineering Scott Fettig Exported on April 26,2024 12:44:12 PM CDT Streett Intersection From To Description Department Department Contact 64 University Dr 1-35 Frontage Rd University Dr(EB—550') 02/19/24 05/01/24 Utility Relocation Engineering Shawn Messick 65 Wellington Dr North of Heather Ln Churchill Dr 12/11/23 05/08/24 Utility installations and Engineering Taylor Holt pavement replacement 66 Westward Dr Northway Southway 04/22/24 05/03/24 Concrete street paving. Private Development Zabdiel Mota 67 Willowwood St Bernard St Jacqueline Dr 12/27/23 05/30/24 Utility installations and Engineering Scott Fettig pavement replacement. 68 Wisteria St Parvin St Laurel St 05/30/23 06/01/24 Utility installations and Engineering Scott Fettig pavement replacement. Exported on April 26,2024 12:44:12 PM CDT 3 Street Closure Report: Completed Closures smartsheet Closure Start Closure End street/Intersection From FIF Date Date Description Department Department Contact 1 Bell Ave Sycamore St Eagle Dr 04/15/24 04/24/24 Utility installations and Engineering Scott Fettig pavement replacement. 2 Buena Vista Dr Montecito Rd Mira Vista Dr 11/06/23 03/29/24 Street reconstruct Streets Jeff Jones 3 Chaparral Ct Cooper Branch E Dead End 08/14/23 03/27/24 Utility Replacement&Street Engineering Taylor Holt Reconstruction 4 Eastpark Blvd Panhandle St Linden Dr 03/22/24 04/05/24 roadway panel replacement for Public Works Inspections Lee Thurmond pcm21-0040 5 Fannin St Avenue A Avenue B 02/15/24 04/15/24 Atmos gas relocation Atmos Pulizzi,Joseph 6 Mayhill Rd @ Spencer Rd 03/28/23 03/29/24 Water main tie-in and turn lane Public Works Inspections Ryan Cuba addition 7 Mayhill Rd(SB) University Dr(US 380) Prominence Pkwy 02/26/24 04/26/24 Installation of new water main Private Development Zabdiel Mota line pipe. 8 Nottingham Dr Kings Row Stratford Ln 04/15/24 04/26/24 Valley Gutter Repair Streets Roy San Miguel 9 Oak St 1-35 Frontage Rd Oak St(EB-300') 02/08/24 04/17/24 Utility Relocation Engineering Shawn Messick 10 Osage Ln Huron Cir Cul V Sac 03/18/24 04/26/24 Concrete Panel and Sidewalk Streets Roy San Miguel Repair 11 Prairie St Bell Ave Skinner St 03/04/24 03/29/24 stormwater replacement Drainage Stephen Bonner 12 Randall St Sherman Dr Picadilly La 03/22/24 04/05/24 infrastructure installation on Public Works Inspections Lee Thurmond Randall street for pcm22=0063 Roselawn Dr Roselawn Cir Railroad crossing 02/05/24 04/26/24 Paving,TxDot guardrail,Install Private Development Taylor Hardgrave 13 new box culvert.8x8,new road for Roselawn.Eagle Creek PH 3A-4 14 Spyglass Hill Ln Cliffside Dr Oceanview Dr 03/04/24 04/05/24 Concrete Panel and Sidewalk Streets Roy San Miguel Repair 15 Willowwood St Bonnie Brae St Bonnie Brae St 04/08/24 04/19/24 Installation of Sanitary Sewer Engineering Robin Davis line 16 Wlllowwood St Bonnie Brae St Bonnie Brae St 04/08/24 04/26/24 Installation of Sanitary Sewer Engineering Robin Davis L-L line Exported on April 26,2024 12:44:23 PM CDT