Loading...
2024/05/03 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR May 6th - 12th Street/Intersection From To 1 Waterside PI(7700) Hickory Creek Rd Dawn Light Dr 05/20/24 06/14/24 Sidewalk and ADA Repair Streets Roy San Miguel Lane Closure Exported on May 3,2024 11:57:25 AM CDT 2 Street Closure Report: Current Closures smartsheet Wosure End Description Department Department Contact 17AIIredRd Oakleaf Trl John Paine Rd 04/26/24 08/30/24 New road for Allred for Public Works Inspections Kent Bull Rivers Full Closure Sagebrook PH II 2 Parvin St Laurel St 05/30/23 06/01/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 3 Beall St(1400) Nicosia St Hermalinda or 05/06/24 06/07/24 Curb and Gutter Repair Streets Roy San Miguel Lane Closure 4 Bell Ave Sycamore St Prairie St 08/21/23 05/30/24 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 5 Bellaire or Montclair PI McKinney St(East) 04/22/24 05/17/24 Valley Gutter Repair Streets Roy San Miguel Full Closure 6 Bernard St Acme St Roselawn or 05/30/23 05/15/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 7 Bradshaw St Wilson St Prairie St 01/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 8 Bradshaw St Prairie St Sycamore St 03/13/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 9 Camellia St Parvin St Laurel St 05/30/23 06/01/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 10 Churchill or Churchill Cir Windsor or 12/11/23 05/08/24 Utility installations and Engineering Taylor Holt pavement replacement 11 College Park or Peach St Dead End 10/02/23 05/17/24 Street reconstruct Streets Roy San Miguel Full Closure 12 Collins St Johnson St Dead End West 08/22/23 05/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 13 Crawford St Mulberry St Sycamore St 10/09/23 06/01/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 14 Crescent St Ector St Hillcrest St 12/27/23 06/01/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 15 Edwards Rd Forrest Willow Rd Desert Willow or 03/18/24 05/24/24 Concrete Panel and Sidewalk Streets Roy San Miguel Lane Closure Repair 16 Fowler or College Park or Peach St 10/02/23 05/17/24 Street reconstruct Streets Roy San Miguel Full Closure 17 Gardenview St Fallmeadow Ln Joyce Ln 04/08/24 05/17/24 Valley Gutter Repair Streets Roy San Miguel Full Closure 18 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper Full Closure 19 Highland St Locust St Wainwright St 01/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 20 Hillcrest St Panhandle St Crescent St 12/27/23 06/30/24 Utility installations and Engineering ts-ot t Fettig Full Closure pavement replacement. 21 Jamestown Ln Mistywood Ln Locksley Ln 01/22/24 05/08/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 22 Maid Marion PI Jamestown Ln Locksley Ln 01/24/24 05/08/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 23 Maple St Locust St Elm St 04/19/24 05/10/24 Pavement replacement. Engineering Scott Fettig Full Closure 24 Maple St Elm St Carroll Blvd 09/15/23 06/30/24 Utility installations and Scott Fettig Full Closure pavement replacement. 25 Maple St Carroll Blvd Elm St 07/05/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 26 Maple St Ave D Ave A 01/22/24 08/01/24 Pavement replacement. Engineering Scott Fettig Rolling Closure 27 Masch Branch Rd University or(US 380) Hampton Rd 02/26/24 05/24/24 Reconstruction of Center lane, Private Development Public Ethan Keith Lane Closure adding turn lane. Works Inspections Mayhill Rd IH 35E Colorado Blvd 01/31/24 05/31/24 This closure will encompass the Engineering Tracy L.Beck,PE,PMP Lane Closure 28 reconstruction of the Colorado and Mayhill Intersection. Mayhill Rd(NB) University or(US 380) Prominence Pkwy 04/22/24 05/17/24 Tying new water line into Private Development Zabdiel Mote Lane Closure 29 existing water line on N.Mayhill Road for 380/Mayhill Industrial. 30 Mayhill Rd(SB) University or(US 380) Prominence Pkwy 04/15/24 05/31/24 Installation of new driveway Private Development Public Zabdiel Mots Lane Closure approaches Works Inspections 31 Mill Pond Rd Emerson Ln Old North Rd 09/11/23 05/08/24 Utility Installations&Pavement Engineering Taylor Holt Full Closure Reconstruction 32 Mulberry St Locust St Elm St 02/19/24 05/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 33 Mulberry St Bell Ave Industrial St 08/21/23 06/01/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 34 Mulberry St Wood St Crawford St 10/09/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Exported on May 3,2024 11:57:36 AM CDT Streett Intersection From To Closure Start Closure End Description Department Date Date Department Contact Closure Type 35 Myrtle St Fort Worth or(HW377) Eagle Dr 06/05/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 36 Myrtle St Maple St Highland St 07/05/23 06/30/24 Utility installations and Scott Fettig Full Closure pavement replacement. 37 Myrtle St Eagle or Maple St 07/05/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 38 Nora Ln Central Village Dr Mark Ln 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel Lane Closure 39 Oakwood Dr McCormick St Dead End East 10/02/23 05/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 40 Old Orchard Ln Windsor Dr Dead End 03/13/24 05/08/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 41 Peach St Bell St Locust St 10/02/23 05/17/24 Street reconstruct Streets Roy San Miguel Full Closure 42 Pecan Tree Or Nora Ln Dead End North 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel Lane Closure 43 Pickwick Ln Oxford Ln Windsor Dr 08/21/23 05/08/24 Utility Replacement&Street Engineering Taylor Holt Full Closure Reconstruction 44 Pierce St Maple St Highland St 07/05/23 06/30/24 Utility installations and Scott Fettig Full Closure pavement replacement. 45 Poinsettia Blvd Sherman Dr Picadilly Ln 04/08/24 05/17/24 Infrastructure installation on Public Works Inspections Lee Thurmond Full Closure Poinsettia 46 Prairie St Locust St Bradshaw St 04/01/24 07/31/24 Utility installations and Scott Fettig Rolling Closure pavement replacement. 47 Regency Ct Mark Ln Country Club Rd 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel Lane Closure Roselawn Dr Roselawn Cir Railroad crossing 02/05/24 06/01/24 Paving,TxDot guardrail,Install Private Development Taylor Hardgrave Full Closure 48 new box culvert.8x8,new road for Roselawn.Eagle Creek PH 3A-4 49 Spencer Rd Loop 288 Mayhill Rd 05/06/24 06/12/24 adding 300 feet of spencer road Public Works Inspections Ryan Cuba Full Closure 50 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 05/31/24 Paving improvements from Public Works Inspections Stephany Trammell Full Closure Exposition to Railroad 51 Sycamore St Exposition St Crawford St 03/13/23 05/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 52 Sycamore St Wood St Crawford St 10/09/23 05/31/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 53 Wellington Dr North of Heather Ln Churchill Dr 12/11/23 05/08/24 Utility installations and Engineering Taylor Holt pavement replacement 54 Westward Dr Northway Southway 04/22/24 05/17/24 Concrete street paving. Private Development Zabdiel Mota Full Closure 55 Willowwood St Bernard St Jacqueline Dr 12/27/23 05/30/24 Utility installations and Engineering Scott Fettig Rolling Closure pavement replacement. 56 Wind River Ln @ Shoreline Como Lake or Enchanted Lake Dr 05/06/24 06/07/24 Concrete Panel Repair Streets Roy San Miguel Lane Closure 57 Wisteria St Parvin St Laurel St 05/30/23 06/01/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Exported on May 3,2024 11:57:36 AM CDT 3 Street Closure Report: Completed Closures smartsheet Description Department Conta ct 17Austin Oak St Mulberry St 04/29/24 05/01/24 Geotechnical Pavement Boring Engineering Taylor Holt Rolling Closure 2t 1-35 Service Rd Bandera St(WB-150') 02/08/24 05/02/24 Utility Relocation Engineering Shawn Messick Full Closure 3arceonaSt 1-35 Service Rd Mesa Dr 04/25/24 05/01/24 Atmos gas relocation Atmos Gavin Petner Full Closure 4 Bell Ave Sycamore St Eagle Dr 04/15/24 04/24/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. 5 Carmel Hills Dr(3405) Las Lomas Ln Portola Ln 04/03/24 05/01/24 Concrete Panel Repair Streets Roy San Miguel Lane Closure 6 Eastpark Blvd Panhandle St Linden Dr 03/22/24 04/05/24 roadway panel replacement for Public Works Inspections Lee Thurmond Full Closure pcm21-0040 7 Elm St University Dr(US 380) Pecan St 04/29/24 05/01/24 Geotechnical Pavement Boring Engineering Taylor Holt Rolling Closure Elm St University Dr(US 380) McKinney St 04/29/24 05/01/24 Engineering contractor CMJ Engineering Ammon Lutz Rolling Closure 8 Engineering is coring for upcoming project 9 Fannin St Avenue A Avenue B 02/15/24 04/15/24 Atmos gas relocation Atmos Pulizzi,Joseph Rolling Closure 10 Leslie St Willowwood St Dudley St 08/31/23 04/30/24 Utility installations and Engineering Scott Fettig Full Closure pavement replacement. Locust St University Dr(US 380) McKinney St 04/29/24 05/01/24 Engineering contractor CMJ Engineering Ammon Lutz Rolling Closure 11 Engineering is coring for upcoming project 12 Locust St University Dr(US 380) Pecan St 04/29/24 05/01/24 Geotechnical Pavement Boring Engineering Taylor Holt Rolling Closure 13 Los Colinas St Mesa Dr 1-35 Frontage Rd 03/01/24 04/30/24 Utility Water/Wastewater line Water Wastewater Other Shawn Messick Full Closure relocation 14 Mayhill Rd(SB) University Dr(US 380) Prominence Pkwy 02/26/24 04/26/24 Installation of new water main Private Development Zabdiel Mota Lane Closure line pipe. 15 Mira Vista Dr Buena Vista Dr Palo Verde Dr 04/08/24 05/03/24 Reconstruction Streets Rogelio San Miguel Rolling Closure 16 North Texas Blvd Eagle Dr Highland St 04/29/24 05/03/24 Sidewalk Repair Streets Roy San Miguel Lane Closure 17 Nottingham Dr Kings Row Stratford Ln 04/15/24 04/26/24 Valley Gutter Repair Streets Roy San Miguel Full Closure 18 Oak St 1-35 Frontage Rd Oak St(EB-300') 02/08/24 04/17/24 Utility Relocation Engineering Shawn Messick Lane Closure 19 Osage Ln Huron Cir Cul V Sac 03/18/24 04/26/24 Concrete Panel and Sidewalk Streets Roy San Miguel Lane Closure Repair 20 Randall St Sherman Dr Picadilly La 03/22/24 04/05/24 infrastructure installation on Public Works Inspections Lee Thurmond Full Closure Randall street for pcm22=0063 21 Spyglass Hill Ln Cliffside or Oceanview Dr 03/04/24 04/05/24 Concrete Panel and Sidewalk Streets Roy San Miguel Lane Closure Repair 22 Thunderbird Dr Crestmeadow St Westview Trl 04/29/24 05/03/24 Curb and Gutter and Sidewalk Streets Roy San Miguel Lane Closure Repair 23 Underwood St North Texas Blvd Kendolph Dr 08/28/23 04/30/24 Pavement replacement. Engineering Scott Fettig Full Closure 24 University Dr 1-35 Frontage Rd University Dr(EB-550') 02/19/24 05/01/24 Utility Relocation Engineering Shawn Messick Lane Closure 25 Willowwood St Bonnie Brae St Bonnie Brae St 04/08/24 04/19/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure line 26 Willowwood St Bonnie Brae St Bonnie Brae St 04/08/24 04/26/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure line Exported on May 3,2024 11:57:46 AM CDT