2024/05/10 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR May 13th - 19th
Streett Intersection From To Descri tion Department Department Contact Closure Type
1 Pembrooke PI(2129) Chasewood Ln Longridge or 05/27/24 06/28/24 Curb Repair and Asphalt Patch Streets Roy San Miguel Lane Closure
2 Waterside PI(7700) Hickory Creek Rd Dawn Light Dr 05/20/24 06/14/24 Sidewalk and ADA Repair Streets Roy San Miguel Lane Closure
Exported on May 10,2024 11:42:28 AM CDT
2 Street Closure Report: Current Closures smartsheet
Wosure End Description Department Department Contact
17AIIredRd Oakleaf Trl John Paine Rd 04/26/24 08/30/24 New road for Allred for Public Works Inspections Kent Bull Rivers Full Closure
Sagebrook PH II
2 Parvin St Laurel St 05/30/23 06/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
3 Beall St(1400) Nicosia St Hermalinda or 05/06/24 06/07/24 Curb and Gutter Repair Streets Roy San Miguel Lane Closure
4 Bell Ave Sycamore St Prairie St 08/21/23 05/30/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
5 Bellaire or Montclair PI McKinney St(East) 04/22/24 05/17/24 Valley Gutter Repair Streets Roy San Miguel Full Closure
6 Bernard St Acme St Roselawn or 05/30/23 05/15/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
7 Bradshaw St Wilson St Prairie St 01/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
6 Bradshaw St Prairie St Sycamore St 03/13/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
9 Camellia St Parvin St Laurel St 05/30/23 06/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
10 Churchill or Churchill Cir Windsor Dr 12/11/23 06/05/24 Utility installations and Engineering Taylor Holt
pavement replacement
11 College Park or Peach St Dead End 10/02/23 05/17/24 Street reconstruct Streets Roy San Miguel Full Closure
12 Collins St Johnson St Dead End West 08/22/23 05/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
13 Crawford St Mulberry St Sycamore St 10/09/23 06/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
14 Crescent St Ector St Hillcrest St 12/27/23 06/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
15 Edwards Rd Forrest Willow Rd Desert Willow or 03/18/24 05/24/24 Concrete Panel and Sidewalk Streets Roy San Miguel Lane Closure
Repair
16 Fowler or College Park or Peach St 10/02/23 05/17/24 Street reconstruct Streets Roy San Miguel Full Closure
17 Gardenview St Fallmeadow Ln Joyce Ln 04/08/24 05/17/24 Valley Gutter Repair Streets Roy San Miguel Full Closure
18 Hickory Creek Rd Riverpass or FM 1830 03/13/23 12/31/24 Bridge Installation Engineering Dustin Draper Full Closure
19 Highland St Locust St Wainwright St 01/30/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
20 Hillcrest St Panhandle St Crescent St 12/27/23 06/30/24 Utility installations and Engineering ts-ot
t Fettig Full Closure
pavement replacement.
21 Jamestown Ln Mistywood Ln Locksley Ln 01/22/24 06/05/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
22 Maid Marion PI Jamestown Ln Locksley Ln 01/24/24 06/05/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
23 Maple St Locust St Elm St 04/19/24 06/30/24 Pavement replacement. Engineering Scott Fettig Full Closure
24 Maple St Elm St Carroll Blvd 09/15/23 06/30/24 Utility installations and Scott Fettig Full Closure
pavement replacement.
25 Maple St Carroll Blvd Elm St 07/05/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
26 Maple St Ave D Ave A 01/22/24 08/01/24 Pavement replacement. Engineering Scott Fettig Rolling Closure
27 Masch Branch Rd University or(US 380) Hampton Rd 02/26/24 05/24/24 Reconstruction of Center lane, Private Development Public Ethan Keith Lane Closure
adding turn lane. Works Inspections
Mayhill Rd @ Colorado Blvd Intersection 01/31/24 05/31/24 This closure will encompass the Engineering Tracy L.Beck,PE,PMP Lane Closure
28 reconstruction of the Colorado
and Mayhill Intersection.
Mayhill Rd(NB) University or(US 380) Prominence Pkwy 04/22/24 05/17/24 Tying new water line into Private Development Zabdiel Mote Lane Closure
29 existing water line on N.Mayhill
Road for 380/Mayhill Industrial.
30 Mayhill Rd(SB) University or(US 380) Prominence Pkwy 04/15/24 05/31/24 Installation of new driveway Private Development Public Zabdiel Mots Lane Closure
approaches Works Inspections
31 Mill Pond Rd Emerson Ln Old North Rd 09/11/23 05/15/24 Utility Installations&Pavement Engineering Taylor Holt Full Closure
Reconstruction
32 Mulberry St Locust St Elm St 02/19/24 05/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
33 Mulberry St Bell Ave Industrial St 08/21/23 06/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
34 Mulberry St Wood St Crawford St 10/09/23 07/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Exported on May 10,2024 11:42:39 AM CDT
Streett Intersection From To Closure Start Closure End Description Department
Date Date Department Contact Closure Type
35 Myrtle St Fort Worth or(HW377) Eagle Dr 06/05/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
36 Myrtle St Maple St Highland St 07/05/23 06/30/24 Utility installations and Scott Fettig Full Closure
pavement replacement.
37 Myrtle St Eagle or Maple St 07/05/23 06/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
38 Oakwood Dr McCormick St Dead End East 10/02/23 05/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
39 Old Orchard Ln Windsor Dr Dead End 03/13/24 06/05/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
40 Peach St Bell St Locust St 10/02/23 05/17/24 Street reconstruct Streets Roy San Miguel Full Closure
41 Pecan St Elm St Locust St 05/13/24 05/13/24 Crane set up to replace air Private Development Pete Leptuch Full Closure
conditioner on top of building
42 Pierce St Maple St Highland St 07/05/23 06/30/24 Utility installations and Scott Fettig Full Closure
pavement replacement.
43 Poinsettia Blvd Sherman Dr Picadilly Ln 04/08/24 05/17/24 Infrastructure installation on Public Works Inspections Lee Thurmond Full Closure
Poinsettia
44 Prairie St Locust St Bradshaw St 04/01/24 07/31/24 Utility installations and Scott Fettig Rolling Closure
pavement replacement.
Roselawn Dr Roselawn Cir Railroad crossing 02/05/24 06/01/24 Paving,TxDot guardrail,Install Private Development Taylor Hardgrave Full Closure
45 new box culvert.8x8,new road
for Roselawn.Eagle Creek PH
3A-4
46 Spencer Rd Loop 288 Mayhill Rd 05/06/24 06/12/24 adding 300 feet of spencer road Public Works Inspections Ryan Cuba Full Closure
47 Sycamore St Exposition St Railroad Tracks on Sycamore 08/17/23 05/31/24 Paving improvements from Public Works Inspections Stephany Trammell Full Closure
Exposition to Railroad
48 Sycamore St Exposition St Crawford St 03/13/23 05/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
49 Sycamore St Wood St Crawford St 10/09/23 05/31/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
50 Wellington Dr North of Heather Ln Churchill Dr 12/11/23 06/05/24 Utility installations and Engineering Taylor Holt
pavement replacement
51 Westward Dr Northway Southway 04/22/24 05/17/24 Concrete street paving. Private Development Zabdiel Mota Full Closure
52 Willowwood St Bernard St Jacqueline Dr 12/27/23 05/30/24 Utility installations and Engineering Scott Fettig Rolling Closure
pavement replacement.
53 Wind River Ln @ Shoreline Como Lake Dr Enchanted Lake or 05/06/24 06/07/24 Concrete Panel Repair Streets Roy San Miguel Lane Closure
54 Wisteria St Parvin St Laurel St 05/30/23 06/01/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Exported on May 10,2024 11:42:39 AM CDT
3 Street Closure Report: Completed Closures smartsheet
Description Department Conta ct
17Austin Oak St Mulberry St 04/29/24 05/01/24 Geotechnical Pavement Boring Engineering Taylor Holt Rolling Closure
2t 1-35 Service Rd Bandera St(WB-150') 02/08/24 05/02/24 Utility Relocation Engineering Shawn Messick Full Closure
3arceonaSt 1-35 Service Rd Mesa Dr 04/25/24 05/01/24 Atmos gas relocation Atmos Gavin Petner Full Closure
4 Bell Ave Sycamore St Eagle Dr 04/15/24 04/24/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
5 Carmel Hills Dr(3405) Las Lomas Ln Portola Ln 04/03/24 05/01/24 Concrete Panel Repair Streets Roy San Miguel Lane Closure
6 Elm St University Dr(US 380) Pecan St 04/29/24 05/01/24 Geotechnical Pavement Boring Engineering Taylor Holt Rolling Closure
Elm St University Dr(US 380) McKinney St 04/29/24 05/01/24 Engineering contractor CMJ Engineering Ammon Lutz Rolling Closure
7 Engineering is coring for
upcoming project
8 Fannin St Avenue A Avenue B 02/15/24 04/15/24 Atmos gas relocation Atmos Pulizzi,Joseph Rolling Closure
9 Leslie St Willowwood St Dudley St 08/31/23 04/30/24 Utility installations and Engineering Scott Fettig Full Closure
pavement replacement.
Locust St University Dr(US 380) McKinney St 04/29/24 05/01/24 Engineering contractor CMJ Engineering Ammon Lutz Rolling Closure
10 Engineering is coring for
upcoming project
11 Locust St University or(US 380) Pecan St 04/29/24 05/01/24 Geotechnical Pavement Boring Engineering Taylor Holt Rolling Closure
12 Los Colinas St Mesa Dr 1-35 Frontage Rd 03/01/24 04/30/24 Utility Water/Wastewater line Water Wastewater Other Shawn Messick Full Closure
relocation
13 Mayhill Rd(SB) University Dr(US 380) Prominence Pkwy 02/26/24 04/26/24 Installation of new water main Private Development Zabdiel Mota Lane Closure
line pipe.
14 Mira Vista Dr Buena Vista Dr Palo Verde Dr 04/08/24 05/03/24 Reconstruction Streets Rogelio San Miguel Rolling Closure
15 Nora Ln Central Village Dr Mark Ln 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel Lane Closure
16 North Texas Blvd Eagle Dr Highland St 04/29/24 05/03/24 Sidewalk Repair Streets Roy San Miguel Lane Closure
17 Nottingham Dr Kings Row Stratford Ln 04/15/24 04/26/24 Valley Gutter Repair Streets Roy San Miguel Full Closure
18 Oak St 1-35 Frontage Rd Oak St(EB-300') 02/08/24 04/17/24 Utility Relocation Engineering Shawn Messick Lane Closure
19 Osage Ln Huron Cir Cul V Sac 03/18/24 04/26/24 Concrete Panel and Sidewalk Streets Roy San Miguel Lane Closure
Repair
20 Pecan Tree Dr Nora Ln Dead End North 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel Lane Closure
21 Pickwick Ln Oxford Ln Windsor Dr 08/21/23 05/08/24 Utility Replacement&Street Engineering Taylor Holt Full Closure
Reconstruction
22 Regency Ct Mark Ln Country Club Rd 04/08/24 05/10/24 Sidewalk Repair Streets Roy San Miguel Lane Closure
23 Thunderbird Dr Crestmeadow St Westview Tit 04/29/24 05/03/24 Curb and Gutter and Sidewalk Streets Roy San Miguel Lane Closure
Repair
24 Underwood St North Texas Blvd Kendolph Dr 08/28/23 04/30/24 Pavement replacement. Engineering Scott Fettig Full Closure
25 University Dr 1-35 Frontage Rd University Dr(EB-550') 02/19/24 05/01/24 Utility Relocation Engineering Shawn Messick Lane Closure
26 Willowwood St Bonnie Brae St Bonnie Brae St 04/08/24 04/19/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure
line
27 Willowwood St Bonnie Brae St Bonnie Brae St 04/08/24 04/26/24 Installation of Sanitary Sewer Engineering Robin Davis Full Closure
i line
Exported on May 10,2024 11:42:58 AM CDT